Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques (English)
- New search for: Awojobi, Omotola
- New search for: Jenkins, Glenn P.
- New search for: Awojobi, Omotola
- New search for: Jenkins, Glenn P.
In:
Renewable and Sustainable Energy Reviews
;
63
;
19-32
;
2016
-
ISSN:
- Article (Journal) / Electronic Resource
-
Title:Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques
-
Contributors:Awojobi, Omotola ( author ) / Jenkins, Glenn P. ( author )
-
Published in:Renewable and Sustainable Energy Reviews ; 63 ; 19-32
-
Publisher:
- New search for: Elsevier Ltd
-
Publication date:2016-05-03
-
Size:14 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 63
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
A comprehensive review of the voltage stability indicesModarresi, Javad / Gholipour, Eskandar / Khodabakhshian, Amin et al. | 2016
- 13
-
Rethinking solar energy education on the dawn of the solar economyCiriminna, Rosaria / Meneguzzo, Francesco / Pecoraino, Mario / Pagliaro, Mario et al. | 2016
- 19
-
Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniquesAwojobi, Omotola / Jenkins, Glenn P. et al. | 2016
- 33
-
Dust and soiling issues and impacts relating to solar energy systems: Literature review update for 2012–2015Costa, Suellen C.S. / Diniz, Antonia Sonia A.C. / Kazmerski, Lawrence L. et al. | 2016
- 62
-
A comprehensive review on properties of edible and non-edible vegetable oil-based biodiesel: Composition, specifications and prediction modelsSajjadi, Baharak / Raman, Abdul Aziz Abdul / Arandiyan, Hamidreza et al. | 2016
- 93
-
Financing risks involved in distributed PV power generation in China and analysis of countermeasuresLuo, Guo-liang / Long, Cheng-feng / Wei, Xiao / Tang, Wen-jun et al. | 2016
- 102
-
Review of computer models of air-based, curtainwall-integrated PV/T collectorsNemati, Omid / Ibarra, Luis M. Candanedo / Fung, Alan S. et al. | 2016
- 118
-
Gas-fired combined cooling, heating and power (CCHP) in Beijing: A techno-economic analysisYan, Bofeng / Xue, Song / Li, Yuanfei / Duan, Jinhui / Zeng, Ming et al. | 2016
- 132
-
Review of social water cycle research in a changing environmentLu, Shibao / Zhang, Xiaoling / Bao, Haijun / Skitmore, Martin et al. | 2016
- 141
-
The performance and analysis of the thermoelectric generator system used in diesel enginesTemizer, İlker / İlkılıç, Cumali et al. | 2016
- 152
-
Overall review of China׳s thermal power development with emphatic analysis on thermal powers’ cost and benefitMing, Zeng / Xiaohu, Zhang / Ping, Zhang / Jun, Dong et al. | 2016
- 158
-
Driving electric vehicles at highway speeds: The effect of higher driving speeds on energy consumption and driving range for electric vehicles in AustraliaWager, Guido / Whale, Jonathan / Braunl, Thomas et al. | 2016
- 166
-
A bootstrap panel Granger causality analysis of energy consumption and economic growth in the G7 countriesMutascu, Mihai et al. | 2016
- 172
-
Biomass resources and biofuels potential for the production of transportation fuels in NigeriaBen-Iwo, Juliet / Manovic, Vasilije / Longhurst, Philip et al. | 2016
- 193
-
Heat transfer augmentation using twisted tape inserts: A reviewVarun / Garg, M.O. / Nautiyal, Himanshu / Khurana, Sourabh / Shukla, M.K. et al. | 2016
- 226
-
The use of nanofluids for enhancing the thermal performance of stationary solar collectors: A reviewMuhammad, Mahmud Jamil / Muhammad, Isa Adamu / Sidik, Nor Azwadi Che / Yazid, Muhammad Noor Afiq Witri Muhammad / Mamat, Rizalman / Najafi, G. et al. | 2016
- 237
-
Development of efficient vertical axis wind turbine clustered farmsShaheen, Mohammed / Abdallah, Shaaban et al. | 2016
- 245
-
Electron transport study of indium oxide as photoanode in DSSCs: A reviewMahalingam, S. / Abdullah, H. et al. | 2016
- 256
-
New methodological approach for biomass resource assessment in India using GIS application and land use/land cover (LULC) mapsNatarajan, Karthikeyan / Latva-Käyrä, Petri / Zyadin, Anas / Pelkonen, Paavo et al. | 2016
- 269
-
Carbonyl and aromatic hydrocarbon emissions from diesel engine exhaust using different feedstock: A reviewSingh, Paramvir / Varun / Chauhan, S.R. et al. | 2016
- 292
-
Application of real options valuation for analysing the impact of public R&D financing on renewable energy projects: A company′s perspectiveMartín-Barrera, Gonzalo / Zamora-Ramírez, Constancio / González-González, José M. et al. | 2016
- 302
-
Sonochemical reactors: Review on features, advantages and limitationsAsgharzadehahmadi, Seyedali / Abdul Raman, Abdul Aziz / Parthasarathy, Rajarathinam / Sajjadi, Baharak et al. | 2016
- 315
-
Revisiting adsorption cooling cycle from mathematical modelling to system developmentTeng, W.S. / Leong, K.C. / Chakraborty, A. et al. | 2016
- 333
-
Viability study of the use of grid connected photovoltaic system in agriculture: Case of Algerian dairy farmsBey, M. / Hamidat, A. / Benyoucef, B. / Nacer, T. et al. | 2016
- 346
-
Graphene based nanofluids and nanolubricants – Review of recent developmentsRasheed, A.K. / Khalid, M. / Rashmi, W. / Gupta, T.C.S.M. / Chan, A. et al. | 2016
- 363
-
A review of optimum DG placement based on minimization of power losses and voltage stability enhancement of distribution systemSultana, U. / Khairuddin, Azhar B. / Aman, M.M. / Mokhtar, A.S. / Zareen, N. et al. | 2016
- 379
-
Evaluating the enablers in solar power developments in the current scenario using fuzzy DEMATEL: An Indian perspectiveLuthra, Sunil / Govindan, Kannan / Kharb, Ravinder K. / Mangla, Sachin Kumar et al. | 2016
- 398
-
Pakistan geothermal renewable energy potential for electric power generation: A surveyYounas, Umair / Khan, B. / Ali, S.M. / Arshad, C.M. / Farid, U. / Zeb, Kamran / Rehman, Fahad / Mehmood, Yasir / Vaccaro, A. et al. | 2016
- 414
-
Review on the blade design technologies of tidal current turbineLi, Wei / Zhou, Hongbin / Liu, Hongwei / Lin, Yonggang / Xu, Quankun et al. | 2016
- 423
-
Identifying the most significant input parameters for predicting global solar radiation using an ANFIS selection procedureMohammadi, Kasra / Shamshirband, Shahaboddin / Kamsin, Amirrudin / Lai, P.C. / Mansor, Zulkefli et al. | 2016
- 435
-
Evaluating the life cycle energy benefits of energy efficiency regulations for buildingsCrawford, Robert H. / Bartak, Erika L. / Stephan, André / Jensen, Christopher A. et al. | 2016
- 452
-
Novel comparison study between the hybrid renewable energy systems on land and on shipDiab, Fahd / Lan, Hai / Ali, Salwa et al. | 2016
- 464
-
Solar stills: A comprehensive review of designs, performance and material advancesDsilva Winfred Rufuss, D. / Iniyan, S. / Suganthi, L. / Davies, P.A. et al. | 2016
- 497
-
The impacts of the German biofuel quota on sectoral domestic production and imports of the German economySievers, Luisa / Schaffer, Axel et al. | 2016
- 506
-
Review of computational and experimental approaches to analysis of aerodynamic performance in horizontal-axis wind turbines (HAWTs)Bai, Chi-Jeng / Wang, Wei-Cheng et al. | 2016
- 520
-
New inverter control for balancing standalone micro-grid phase voltages: A review on MG power quality improvementKamel, Rashad M. et al. | 2016
- 533
-
Conversion of crude and pure glycerol into derivatives: A feasibility evaluationKong, Pei San / Aroua, Mohamed Kheireddine / Daud, Wan Mohd Ashri Wan et al. | 2016
- 556
-
Testing the Environmental Kuznets Curve hypothesis: A comparative empirical study for low, lower middle, upper middle and high income countriesAzam, Muhammad / Khan, Abdul Qayyum et al. | 2016
- 568
-
Educating labour force for a green economy and renewable energy jobs in Turkey: A quantitave approachKayahan Karakul, Aygülen et al. | 2016
- 579
-
A literature review on estimating of PV-array hourly power under cloudy weather conditionsGandoman, Foad H. / Raeisi, Fatima / Ahmadi, Abdollah et al. | 2016
- 593
-
Concentrated solar power technology in India: A reviewBijarniya, Jay Prakash / Sudhakar, K. / Baredar, Prashant et al. | 2016
- IFC
-
Editorial Board| 2016