Dominance rules for the parallel machine total weighted tardiness scheduling problem with release dates (English)
- New search for: Jouglet, Antoine
- New search for: Savourey, David
- New search for: Jouglet, Antoine
- New search for: Savourey, David
In:
Computers and Operations Research
;
38
, 9
;
1259-1266
;
2010
-
ISSN:
- Article (Journal) / Electronic Resource
-
Title:Dominance rules for the parallel machine total weighted tardiness scheduling problem with release dates
-
Contributors:Jouglet, Antoine ( author ) / Savourey, David ( author )
-
Published in:Computers and Operations Research ; 38, 9 ; 1259-1266
-
Publisher:
- New search for: Elsevier Ltd
-
Publication date:2010-01-01
-
Size:8 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 38, Issue 9
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1237
-
Publisher’s Note| 2011
- 1238
-
Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industryGaudreault, Jonathan / Frayret, Jean-Marc / Rousseau, Alain / D’Amours, Sophie et al. | 2010
- 1251
-
A robust mean absolute deviation model for portfolio optimizationMoon, Yongma / Yao, Tao et al. | 2010
- 1259
-
Dominance rules for the parallel machine total weighted tardiness scheduling problem with release datesJouglet, Antoine / Savourey, David et al. | 2010
- 1267
-
Two-machine flowshop scheduling with intermediate transportation under job physical space considerationGong, Hua / Tang, Lixin et al. | 2010
- 1275
-
A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cellChe, Ada / Hu, Hongjian / Chabrol, Michelle / Gourgand, Michel et al. | 2010
- 1286
-
An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowedTavares Neto, R.F. / Godinho Filho, M. et al. | 2010
- 1294
-
Pricing and inventory management in a system with multiple competing retailers under (r, Q) policiesGuan, Ruoxi / Zhao, Xiaobo et al. | 2010
- 1305
-
A heuristic approach for resource constrained project scheduling with uncertain activity durationsBruni, M.E. / Beraldi, P. / Guerriero, F. / Pinto, E. et al. | 2010
- 1319
-
A GRASP with evolutionary path relinking for the truck and trailer routing problemVillegas, Juan G. / Prins, Christian / Prodhon, Caroline / Medaglia, Andrés L. / Velasco, Nubia et al. | 2010
- 1335
-
An interior point cutting plane heuristic for mixed integer programmingNaoum-Sawaya, Joe / Elhedhli, Samir et al. | 2010
- 1342
-
A heuristic approach for packing identical rectangles in convex regionsCassioli, Andrea / Locatelli, Marco et al. | 2010
- 1351
-
Exploring the efficiency and effectiveness in global e-retailing companiesLu, Wen-Min / Hung, Shiu-Wan et al. | 2010
- 1361
-
A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobsDuran Toksarı, M. et al. | 2010
- i
-
Title Page/Editorial Board| 2011