Progress of the Front-End System Development for Project X at LBNL Conference: Presented at the 3rd International Particle Accelerator Conference (IPAC-2012), New Orleans, Louisiana, 20-25 May 2012
(English)
Please choose your delivery country and your customer group
A multi-MW proton facility, Project X has been proposed and is currently under development at Fermilab. Project X is a key ingredient of an accelerator complex for intensity frontier of future high energy physics programs in the US. In collaboration with Fermilab, LBNL takes the responsibility in the development and design studies of the front-end system for Project X. The front-end system would consist of H- ion source(s), low-energy beam transport (LEBT), 162.5 MHz normal conducting CW Radio-Frequency-Quadrupole (RFQ) accelerator, medium-energy beam transport (MEBT), and beam chopper(s). In this paper, we will review and present recent progress of the front-end system studies, which will include the RFQ beam dynamics design, RF structure design, thermal and mechanical analyses and fabrication plan, LEBT simulation studies and concept for LEBT chopper.
Progress of the Front-End System Development for Project X at LBNL Conference: Presented at the 3rd International Particle Accelerator Conference (IPAC-2012), New Orleans, Louisiana, 20-25 May 2012