Impacts of Design-Information Technology on Project Outcomes (English)
- New search for: Thomas, Stephen R.
- New search for: Thomas, Stephen R.
- New search for: Lee, Sang-Hoon
- New search for: Spencer, John D.
- New search for: Tucker, Richard L.
- New search for: Chapman, Robert E.
In:
Journal of construction engineering and management
;
130
, 4
; 586-597
;
2004
-
ISSN:
- Article (Journal) / Print
-
Title:Impacts of Design-Information Technology on Project Outcomes
-
Contributors:Thomas, Stephen R. ( author ) / Lee, Sang-Hoon / Spencer, John D. / Tucker, Richard L. / Chapman, Robert E.
-
Published in:Journal of construction engineering and management ; 130, 4 ; 586-597
-
Publisher:
- New search for: Soc.
-
Place of publication:New York, NY
-
Publication date:2004
-
ISSN:
-
ZDBID:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 56.40 / 56.08
- Further information on Basic classification
- New search for: 770/6510
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 130, Issue 4
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 469
-
Announcement| 2004
- 470
-
Editor's NoteJaselskis, Edward J. et al. | 2004
- 472
-
Mapping Approach for Examining Waste Management on Construction SitesShen, L.Y. et al. | 2004
- 482
-
Implementing and Applying Six Sigma in ConstructionPheng, Low Sui et al. | 2004
- 490
-
Process versus Data Oriented Techniques in Pile Construction Productivity AssessmentZayed, Tarek M. et al. | 2004
- 500
-
Predicting Organizational Success within a Project-Based Joint Venture AllianceSillars, David N. et al. | 2004
- 509
-
Method to Determine Minimum Contract Bid for A+B+I-D Highway ProjectsShr, Jin-Fang et al. | 2004
- 517
-
Transportation Agency Use of Owner-Controlled Insurance ProgramsSchexnayder, Cliff J. et al. | 2004
- 525
-
Factorial Method for Performance Assessment of Building FacadesChew, M.Y.L. et al. | 2004
- 534
-
Dynamic Layout of Construction Temporary Facilities Considering SafetyElbeltagi, Emad et al. | 2004
- 542
-
Incident Causation Model for Improving Feedback of Safety KnowledgeChua, D.K.H. et al. | 2004
- 552
-
Hispanic and Non-Hispanic Wage Differentials: Implications for United States Construction IndustryGoodrum, Paul M. et al. | 2004
- 560
-
Resource Allocation for Concrete Batch Plant Operation: Case StudyZayed, Tarek M. et al. | 2004
- 570
-
Process and Case Illustration of Construction InnovationAbd El Halim, Abd El Halim Omar et al. | 2004
- 576
-
Effective Practice Utilization Using Performance Prediction SoftwareLee, Sang-Hoon et al. | 2004
- 586
-
Impacts of Design-Information Technology on Project OutcomesThomas, Stephen R. et al. | 2004
- 598
-
Four-Dimensional Visualization of Construction Scheduling and Site UtilizationChau, K.W. et al. | 2004
- 607
-
Project Time-Cost Trade-Off Optimization by Maximal Flow TheoryLiu, Jinming et al. | 2004
- 610
-
Discussion of "Quantitative Definition of Projects Impacted by Change Orders" by Awad S. Hanna, Richard Camlic, Pehr A. Peterson, and Erik V. NordheimFarbarik, John J. et al. | 2004
- 612
-
Closure to "Quantitative Definition of Projects Impacted by Change Orders" by Awad S. Hanna, Richard Camlic, Pehr A. Peterson, and Erik V. NordheimHanna, Awad S. et al. | 2004
- 613
-
Discussion of "Network Creation and Development for Repetitive-Unit Projects" by Kyoo Jin Yi, Hyun-Soo Lee, and Yoon Ki ChoiMoselhi, Osama et al. | 2004