Developing exact and Tabu search algorithms for simultaneously determining AGV loop and P-D stations in single loop systems (English)
- New search for: Z-Farahani, R.
- New search for: Z-Farahani, R.
- New search for: Pourakbar, M.
- New search for: Miandoabchi, E.
In:
International journal of production research
;
45
, 22
; 5199-5222
;
2007
-
ISSN:
- Article (Journal) / Print
-
Title:Developing exact and Tabu search algorithms for simultaneously determining AGV loop and P-D stations in single loop systems
-
Contributors:
-
Published in:International journal of production research ; 45, 22 ; 5199-5222
-
Publisher:
- New search for: Taylor & Francis
-
Place of publication:London
-
Publication date:2007
-
ISSN:
-
ZDBID:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 52.70 / 52.70 / 85.35 / 85.35
- Further information on Basic classification
- New search for: 275/1930
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 45, Issue 22
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 5177
-
Integrated approach to part scheduling and inspection policies for a job shop manufacturing systemGalante, G. et al. | 2007
- 5199
-
Developing exact and Tabu search algorithms for simultaneously determining AGV loop and P-D stations in single loop systemsZ-Farahani, R. et al. | 2007
- 5223
-
Tolerance design for the fit between bore and shaft for precision assemblies with significant error-scaling problemsSweet, Arnold et al. | 2007
- 5243
-
A local genetic approach to multi-objective, facility layout problems with fixed aislesYe, M. et al. | 2007
- 5265
-
Mixed-model assembly line sequencing using beam searchErel, Erdal et al. | 2007
- 5285
-
A cost-based methodology for evaluating product platform commonality sourcing decisions with two examplesMarion, T.J. et al. | 2007
- 5309
-
An alternative method to tolerance transfer for parts with 2D blueprintContreras, F.González et al. | 2007
- 5329
-
Aggregate and detailed production planning integrating procurement and distribution plans in a multi-site environmentKanyalkar, A.P. et al. | 2007
- 5355
-
Performance of serial assembly line designs under unequal operator speeds and learningMontano, A. et al. | 2007
- 5383
-
Design and storage cycle time analysis for the automated storage system with a conveyor and a rotary rackHsieh, Y.-J. et al. | 2007
- 5397
-
An alternative approach to test process capability for unilateral specification with subsamplesWu, Chien-Wei et al. | 2007
- 5417
-
Integration of production planning, project management and logistics systems for supply chain managementSamaranayake, P. et al. | 2007
- 5449
-
Book reviewNookabadi, A.S. et al. | 2007
- 5451
-
Environmental principles applicable to green supplier evaluation by using multi-objective decision analysisLu, Louis et al. | 2007