Construction safety and digital design: A review (Unknown)
- New search for: Zhou, Wei
- New search for: Zhou, Wei
- New search for: Whyte, Jennifer
- New search for: Sacks, Rafael
In:
Automation in construction
;
22
; 102-112
;
2012
-
ISSN:
- Article (Journal) / Print
-
Title:Construction safety and digital design: A review
-
Contributors:
-
Published in:Automation in construction ; 22 ; 102-112
-
Publisher:
- New search for: Elsevier Science Publ.
-
Place of publication:Amsterdam
-
Publication date:2012
-
ISSN:
-
ZDBID:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:Unknown
- New search for: 56.03
- Further information on Basic classification
-
Classification:
BKL: 56.03 Methoden im Bauingenieurwesen -
Source:
Table of contents – Volume 22
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Special Issue of 28th Education and Research in Computer Aided Architecture Design in Europe (eCAADe) ConferenceBosché, Frédéric / Halatsch, Jan et al. | 2011
- 2
-
Optimizing solar insolation in transformable fabric architecture: A parametric search design processMark, Earl et al. | 2011
- 12
-
Design of circulation diagrams in macro-scale level based on human movement behavior modelingKontovourkis, Odysseas et al. | 2011
- 24
-
A parametric approach to the bioclimatic design of large scale projects: The case of a student housing complexChronis, Angelos / Liapi, Katherine A. / Sibetheros, Ioannis et al. | 2011
- 36
-
Performative skins for passive climatic comfortTurrin, Michela / von Buelow, Peter / Kilian, Axel / Stouffs, Rudi et al. | 2011
- 51
-
Integrated energy monitoring and visualization system for Smart Green City developmentKim, Sung Ah / Shin, Dongyoun / Choe, Yoon / Seibert, Thomas / Walz, Steffen P. et al. | 2011
- 60
-
Macro thinking and micro actionDeng, Xiaofan et al. | 2011
- 70
-
Parametric systems modeling for sustainable energy and resource flows in buildings and their urban environmentGeyer, Philipp / Buchholz, Martin et al. | 2011
- 81
-
Agent based evaluation of dynamic city modelsAschwanden, Gideon D.P.A. / Wullschleger, Tobias / Müller, Hanspeter / Schmitt, Gerhard et al. | 2011
- 90
-
Evaluating environmental implications of density: A comparative case study on the relationship between density, urban block typology and sky exposureZhang, Ji / Heng, Chye Kiang / Malone-Lee, Lai Choo / Hii, Daniel Jun Chung / Janssen, Patrick / Leung, Kam Shing / Tan, Beng Kiang et al. | 2011
- 102
-
Construction safety and digital design: A reviewZhou, Wei / Whyte, Jennifer / Sacks, Rafael et al. | 2011
- 112
-
Contrasting paradigms of design thinking: The building thermal simulation tool user vs. the building designerBleil de Souza, Clarice et al. | 2011
- 123
-
Planning and design models for construction industry: A critical surveySarker, Bhaba R. / Egbelu, Pius J. / Liao, T. Warren / Yu, Junfang et al. | 2011
- 135
-
Ultrasonic signal processing methods for detection of defects in concrete pipesIyer, Shivprakash / Sinha, Sunil K. / Tittmann, Bernhard R. / Pedrick, Michael K. et al. | 2011
- 149
-
Evaluation of ultrasonic inspection and imaging systems for concrete pipesIyer, Shivprakash / Sinha, Sunil K. / Pedrick, Michael K. / Tittmann, Bernhard R. et al. | 2011
- 165
-
Application of the factor method to maintenance decision support for stone claddingSilva, A. / de Brito, J. / Gaspar, P.L. et al. | 2011
- 175
-
Risk Preference Based Support Vector Machine Inference Model for Slope Collapse PredictionCheng, Min-Yuan / Wu, Yu-Wei / Chen, Kuan-Lin et al. | 2011
- 182
-
Assessing impacts of information technology on project success through knowledge management practiceYang, Li-Ren / Chen, Jieh-Haur / Wang, Hsiao-Wen et al. | 2011
- 192
-
Vectorization of contour lines from scanned topographic mapsOka, Shriram / Garg, Akash / Varghese, Koshy et al. | 2011
- 203
-
An online fault diagnosis tool of VAV terminals for building management and control systemsWang, Haitao / Chen, Youming / Chan, Cary W.H. / Qin, Jianying et al. | 2011
- 212
-
Design of a preliminary error impact analysis model for spatial safety assessment of earthmoving operationsChi, Seokho / Caldas, Carlos H. et al. | 2011
- 223
-
Method of assessing the quality of the design process of construction equipment with the use of DFSS (design for Six Sigma)Koziołek, Sebastian / Derlukiewicz, Damian et al. | 2011
- 233
-
Method to produce field instructions from product and process models for cast-in-place concrete operationsMourgues, Claudio / Fischer, Martin / Kunz, John et al. | 2011
- 247
-
Enabling technologies for developing next-generation learning object repository for constructionRaju, Pathmeswaran / Ahmed, Vian et al. | 2011
- 258
-
Structural damage recognition by grouped data based on Principal Component Analysis theoryLi, Wei-ming / Zhu, Hong-ping / Ding, Lie-yun / Luo, Han-bin et al. | 2011
- 271
-
Supervised vs. unsupervised learning for construction crew productivity predictionOral, Mustafa / Oral, Emel Laptali / Aydın, Ahmet et al. | 2011
- 277
-
Analysis of information integration benefit drivers and implementation hindrancesKang, Youngcheol / O'Brien, William J. / O'Connor, James T. et al. | 2011
- 290
-
Automatic repair of inconsistent pairwise weighting matrices in analytic hierarchy processYang, I-Tung / Wang, Wei-Chih / Yang, Tzu-I et al. | 2011
- 298
-
Automatic processing of Terrestrial Laser Scanning data of building facadesMartinez, J. / Soria-Medina, A. / Arias, P. / Buffara-Antunes, A. F. et al. | 2012
- 298
-
Automatic processing of Terrestrial Laser Scanning data of building façadesMartínez, Joaquín / Soria-Medina, Alex / Arias, Pedro / Buffara-Antunes, Alzir Felippe et al. | 2011
- 306
-
Formalization of workflows for extracting bridge surveying goals from laser-scanned dataTang, Pingbo / Akinci, Burcu et al. | 2011
- 320
-
Development and application of a multi-criteria spatial decision support system for planning sustainable industrial areas in Northern SpainRuiz, M.C. / Romero, E. / Pérez, M.A. / Fernández, I. et al. | 2011
- 334
-
Structural analysis of the Roman Bibei bridge (Spain) based on GPR data and numerical modellingSolla, M. / Lorenzo, H. / Novo, A. / Caamaño, J.C. et al. | 2011
- 340
-
System reliability optimization model for construction projects via system reliability theoryTao, Ran / Tam, Chi-Ming et al. | 2011
- 348
-
A cost optimization-based design of precast concrete floors using genetic algorithmsde Albuquerque, Augusto T. / El Debs, Mounir K. / Melo, Antonio M.C. et al. | 2011
- 357
-
Simulating the winning bid: A generalized approach for optimum markup estimationHosny, Ossama / Elhakeem, Ahmed et al. | 2011
- 368
-
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projectsKhanzadi, Mostafa / Nasirzadeh, Farnad / Alipour, Majid et al. | 2011
- 377
-
Investigating the determinants of construction professionals' acceptance of web-based training: An extension of the technology acceptance modelPark, Yoora / Son, Hyojoo / Kim, Changwan et al. | 2011
- 387
-
Social e-business and the Satellite Network model: Innovative concepts to improve collaboration in constructionCosta, António Aguiar / Tavares, Luís Valadares et al. | 2011
- 398
-
Renovation scheduling to minimize user impact of a building that remains in operationLee, Hsin-Yun et al. | 2011
- 406
-
Modelling property management decisions using ‘iconCUR’Langston, Craig / Smith, Jim et al. | 2011
- 414
-
Automated progress tracking using 4D schedule and 3D sensing technologiesTurkan, Yelda / Bosche, Frederic / Haas, Carl T. / Haas, Ralph et al. | 2011
- 422
-
Developing project communities of practice-based knowledge management system in constructionLin, Yu-Cheng / Lee, Hsin-Yun et al. | 2011
- 433
-
A fuzzy sets based contractor prequalification procedurePlebankiewicz, Edyta et al. | 2011
- 444
-
Design and control of a closed-loop hydraulic energy-regenerative systemHo, Triet Hung / Ahn, Kyoung Kwan et al. | 2011
- 459
-
Applying genetic algorithms for construction quality auditor assignment in public construction projectsWang, Yu-Ren / Kong, Siang-Lin et al. | 2011
- 468
-
A fast path planning method for single and dual crane erectionsChang, Yu-Cheng / Hung, Wei-Han / Kang, Shih-Chung et al. | 2011
- 481
-
The iso-Score Curve Graph. A new tool for competitive biddingBallesteros-Pérez, P. / González-Cruz, Ma. C. / Pastor-Ferrando, J.P. / Fernández-Diego, M. et al. | 2011
- 491
-
Research on natural frequency characteristics of thrust system for EPB machinesTang, Xiaoqiang / Deng, Kongshu / Wang, Liping / Chen, Xu et al. | 2011
- 498
-
Visualizing safety assessment by integrating the use of game technologyLi, Heng / Chan, Greg / Skitmore, Martin et al. | 2011
- 506
-
Storage of energy recovered from an industrial forkliftMinav, T.A. / Virtanen, A. / Laurila, L. / Pyrhönen, J. et al. | 2011
- 516
-
Predicting properties of High Performance Concrete containing composite cementitious materials using Artificial Neural NetworksKhan, Mohammad Iqbal et al. | 2011
- 525
-
Coordinating occupant behavior for building energy and comfort management using multi-agent systemsKlein, Laura / Kwak, Jun-young / Kavulya, Geoffrey / Jazizadeh, Farrokh / Becerik-Gerber, Burcin / Varakantham, Pradeep / Tambe, Milind et al. | 2011
- 537
-
Comparative study of retrospective methods to reduce non-uniform illumination effects to bridge coatingLee, Sangwook / Ghanta, Sindhu / Karp, Tanja et al. | 2011
- 545
-
Ultra-wide band technology experiments for real-time prevention of tower crane collisionsHwang, Seokyon et al. | 2011
- 554
-
Non-linear time domain analysis of base isolated multi-storey building under site specific bi-directional seismic loadingIslam, A.B.M. Saiful / Hussain, Raja Rizwan / Jameel, Mohammed / Jumaat, Mohd Zamin et al. | 2011
- 567
-
Adaptive vision-based crack detection using 3D scene reconstruction for condition assessment of structuresJahanshahi, Mohammad R. / Masri, Sami F. et al. | 2011
- 577
-
D3 City project — Economic impact of BIM-assisted design validationLee, Ghang / Park, Harrison Kwangho / Won, Jongsung et al. | 2011
- 587
-
Rapid assessment and selection of engineered equipment suppliersAzambuja, Marcelo M. / O'Brien, William J. et al. | 2011
- 597
-
A cusp catastrophe model of withdrawal in construction project dispute negotiationChow, Pui Ting / Cheung, Sai On / Yiu, Tak Wing et al. | 2011
- 605
-
Aligning building information model tools and construction management methodsHartmann, Timo / van Meerveld, Hendrik / Vossebeld, Niels / Adriaanse, Arjen et al. | 2011
- 614
-
Calendar| 2011
- IFC
-
Editorial Board| 2011