Erratum for “Corporate Social Responsibility Disclosures in International Construction Business: Trends and Prospects” by Weisheng Lu, Meng Ye, Roger Flanagan, and Kunhui Ye (English)
- New search for: Flanagan, Roger
- New search for: Flanagan, Roger
- New search for: Ye, Meng
- New search for: Ye, Kunhui
- New search for: Lu, Weisheng
In:
Journal of construction engineering and management
;
142
, 5
;
2016
-
ISSN:
- Article (Journal) / Print
-
Title:Erratum for “Corporate Social Responsibility Disclosures in International Construction Business: Trends and Prospects” by Weisheng Lu, Meng Ye, Roger Flanagan, and Kunhui Ye
-
Contributors:
-
Published in:
-
Publisher:
- New search for: Soc.
-
Place of publication:New York, NY
-
Publication date:2016
-
ISSN:
-
ZDBID:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 56.40 / 56.08
- Further information on Basic classification
- New search for: 770/6510
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 142, Issue 5
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
-
Social Sustainability in the Lifecycle of Chilean Public InfrastructureSierra, Leonardo A. / Pellicer, Eugenio / Yepes, Víctor et al. | 2015
-
Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering ProjectsLopez, Robert / Chong, Heap-Yih / Wang, Xiangyu / Graham, Jeff et al. | 2015
-
A Computational Method for Estimating Travel Frequencies in Site Layout PlanningHammad, Ahmed W. A. / Akbarnezhad, Ali / Rey, David / Waller, S. Travis et al. | 2015
-
Repetitive Scheduling Method: Requirements, Modeling, and ImplementationIoannou, Photios G. / Yang, I-Tung et al. | 2016
-
Strategies to Reduce Ground Settlement from Shallow Tunnel Excavation: A Case Study in ChinaZhang, Limao / Wu, Xianguo / Liu, Huitao et al. | 2016
-
Assessing the Applicability of Ground-Penetrating Radar to Quality Control in Tunneling ConstructionPrego, F. J. / Solla, M. / Núñez-Nieto, X. / Arias, P. et al. | 2015
-
Price Adjustment Clauses and Submitted Bid Prices for Major Asphalt Line Items in Highway ProjectsIlbeigi, M. / Ashuri, B. / Shayegh, S. et al. | 2015
-
Nondestructive Testing Procedure to Evaluate the Load-Carrying Capacity of Concrete AnchorsSaleem, Muhammad / Al-Kutti, Walid A. / Al-Akhras, Nabil M. / Haider, Hassan et al. | 2015
-
Incorporating Multiskilling and Learning in the Optimization of Crew CompositionAhmadian Fard Fini, Alireza / Rashidi, Taha H. / Akbarnezhad, Ali / Travis Waller, S. et al. | 2015
-
Slip Chart–Inspired Project Schedule Diagramming: Origins, Buffers, and Extension to Linear SchedulesLucko, Gunnar / Araújo, Lissa Gomes / Cates, Grant R. et al. | 2015
-
Erratum for “Corporate Social Responsibility Disclosures in International Construction Business: Trends and Prospects” by Weisheng Lu, Meng Ye, Roger Flanagan, and Kunhui YeLu, Weisheng / Ye, Meng / Flanagan, Roger / Ye, Kunhui et al. | 2016
-
Lessons Learned from Applying the Individuals Control Charts to Monitoring Autocorrelated Project Performance DataSalehipour, Amir / Naeni, Leila M. / Khanbabaei, Reza / Javaheri, Amir et al. | 2015