Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system (English)
- New search for: Foong, Wai Kuan
- New search for: Simpson, Angus R.
- New search for: Maier, Holger R.
- New search for: Stolp, Stephen
- New search for: Foong, Wai Kuan
- New search for: Simpson, Angus R.
- New search for: Maier, Holger R.
- New search for: Stolp, Stephen
In:
Annals of Operations Research
;
159
, 1
;
433-450
;
2007
- Article (Journal) / Electronic Resource
-
Title:Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower system
-
Contributors:Foong, Wai Kuan ( author ) / Simpson, Angus R. ( author ) / Maier, Holger R. ( author ) / Stolp, Stephen ( author )
-
Published in:Annals of Operations Research ; 159, 1 ; 433-450
-
Publisher:
- New search for: Springer US
-
Place of publication:Boston
-
Publication date:2007-12-01
-
Size:18 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 159, Issue 1
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
PrefaceKendall, Graham / Lei, Lei / Pinedo, Michael et al. | 2007
- 5
-
Forming and scheduling jobs with capacitated containers in semiconductor manufacturing: Single machine problemTanrisever, Fehmi / Kutanoglu, Erhan et al. | 2007
- 25
-
The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing timesShabtay, Dvir / Steiner, George et al. | 2007
- 41
-
Periodic real-time scheduling: from deadline-based model to latency-based modelCucu, Liliana / Pernet, Nicolas / Sorel, Yves et al. | 2007
- 53
-
How good are SPT schedules for fair optimality criteriaAngel, Eric / Bampis, Evripidis / Pascual, Fanny et al. | 2007
- 65
-
An approach to predictive-reactive scheduling of parallel machines subject to disruptionsDuenas, Alejandra / Petrovic, Dobrila et al. | 2007
- 83
-
Efficient algorithms for machine scheduling problems with earliness and tardiness penaltiesFeng, Guang / Lau, Hoong Chuin et al. | 2007
- 97
-
Bicriteria scheduling for contiguous and non contiguous parallel tasksBaille, Fabien / Bampis, Evripidis / Laforest, Christian / Rapine, Christophe et al. | 2007
- 107
-
Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion timeLeung, Joseph Y.-T. / Li, Haibing / Pinedo, Michael et al. | 2007
- 125
-
A GRASP algorithm for the multi-criteria minimum spanning tree problemArroyo, José Elias Claudio / Vieira, Pedro Sampaio / Vianna, Dalessandro Soares et al. | 2007
- 135
-
A branch and bound method for the job-shop problem with sequence-dependent setup timesArtigues, Christian / Feillet, Dominique et al. | 2007
- 161
-
Cyclic job shop scheduling problems with blockingBrucker, Peter / Kampmeyer, Thomas et al. | 2007
- 183
-
On the geometry, preemptions and complexity of multiprocessor and shop schedulingShchepin, Evgeny V. / Vakhania, Nodari et al. | 2007
- 215
-
Scheduling problems in master-slave modelLeung, Joseph Y.-T. / Zhao, Hairong et al. | 2007
- 233
-
A Beam Search approach for the optimization version of the Car Sequencing ProblemBautista, Joaquín / Pereira, Jordi / Adenso-Díaz, Belarmino et al. | 2007
- 245
-
Multiple orders per job batch scheduling with incompatible jobsErramilli, Vishnu / Mason, Scott J. et al. | 2007
- 261
-
Column generation heuristics for multiple machine, multiple orders per job scheduling problemsJampani, Jagadish / Mason, Scott J. et al. | 2007
- 275
-
Fuzzy job shop scheduling with lot-sizingPetrovic, Sanja / Fayad, Carole / Petrovic, Dobrila / Burke, Edmund / Kendall, Graham et al. | 2007
- 293
-
A two pass heuristic algorithm for scheduling ‘blocked out’ units in continuous process industryBose, Sumit Kumar / Bhattacharya, Subir et al. | 2007
- 315
-
Optimal production scheduling for the dairy industryDoganis, Philip / Sarimveis, Haralambos et al. | 2007
- 333
-
Comparison and hybridization of crossover operators for the nurse scheduling problemMaenhout, Broos / Vanhoucke, Mario et al. | 2007
- 355
-
Pruning in column generation for service vehicle dispatchingWestphal, Stephan / Krumke, Sven O. et al. | 2007
- 373
-
Integrated scheduling of handling equipment at automated container terminalsLau, Henry Y. K. / Zhao, Ying et al. | 2007
- 395
-
A zero-inventory production and distribution problem with a fixed customer sequenceArmstrong, Ronald / Gao, Su / Lei, Lei et al. | 2007
- 415
-
Aircraft and crew scheduling for fractional ownership programsYang, Wei / Karaesmen, Itır Z. / Keskinocak, Pınar / Tayur, Sridhar et al. | 2007
- 433
-
Ant colony optimization for power plant maintenance scheduling optimization—a five-station hydropower systemFoong, Wai Kuan / Simpson, Angus R. / Maier, Holger R. / Stolp, Stephen et al. | 2007
- 451
-
Performance of service policies in a specialized service system with parallel serversWang, Zhenbo / Xing, Wenxun et al. | 2007