Effective two-phase p-median approach for the balanced cell formation in the design of cellular manufacturing system (English)
- New search for: Won, Youkyung
- New search for: Logendran, Rasaratnam
- New search for: Won, Youkyung
- New search for: Logendran, Rasaratnam
In:
International Journal of Production Research
;
53
, 9
;
2730-2750
;
2015
- Article (Journal) / Electronic Resource
-
Title:Effective two-phase p-median approach for the balanced cell formation in the design of cellular manufacturing system
-
Contributors:Won, Youkyung ( author ) / Logendran, Rasaratnam ( author )
-
Published in:International Journal of Production Research ; 53, 9 ; 2730-2750
-
Publisher:
- New search for: Taylor & Francis
-
Publication date:2015-05-03
-
Size:21 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 53, Issue 9
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 2569
-
Hybrid metaheuristic techniques for optimising sugarcane rail operationsMasoud, Mahmoud / Kozan, Erhan / Kent, Geoff et al. | 2015
- 2590
-
Single-machine two-agent scheduling involving a just-in-time criterionShabtay, Dvir / Dover, Omri / Kaspi, Moshe et al. | 2015
- 2605
-
Design and comparative performance analysis of a heuristic-based parameterised Banker’s algorithm using the CRL scheduling problemsChoi, Jin Young et al. | 2015
- 2617
-
Integrating optimisation and simulation approaches for daily scheduling of assembly and test operationsBard, Jonathan F. / Jia, Shihui / Chacon, Rodolfo / Stuber, John et al. | 2015
- 2633
-
Developing assembly line layout for delayed product differentiation using phylogenetic networksHanafy, Mohmmad / ElMaraghy, Hoda et al. | 2015
- 2652
-
Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up timesSamarghandi, Hamed et al. | 2015
- 2674
-
Heuristics for integrated job assignment and scheduling in the multi-plant remanufacturing systemLin, Danping / Teo, Chee Chong / Lee, Carman Ka Man et al. | 2015
- 2690
-
Biogeography-based optimisation for flexible manufacturing system scheduling problemPaslar, Shahla / Ariffin, M.K.A. / Tamjidy, Mehran / Hong, Tang Sai et al. | 2015
- 2707
-
Single machine parallel-batching scheduling problem with fuzzy due-date and fuzzy precedence relationLi, Xuesong / Ishii, Hiroaki / Chen, Minghao et al. | 2015
- 2718
-
Warehouse location and two-echelon inventory management with concave operating costShu, Jia / Wu, Ting / Zhang, Kaike et al. | 2015
- 2730
-
Effective two-phase p-median approach for the balanced cell formation in the design of cellular manufacturing systemWon, Youkyung / Logendran, Rasaratnam et al. | 2015
- 2751
-
Rescheduling with controllable processing times for number of disrupted jobs and manufacturing cost objectivesGürel, S. / Cincioğlu, D. et al. | 2015
- 2771
-
A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flowsLeyman, Pieter / Vanhoucke, Mario et al. | 2015
- 2787
-
Synchronisation of production scheduling and shipment in an assembly flowshopChen, Jian / Huang, George Q. / Luo, Hao / Wang, Junqiang et al. | 2015
- 2803
-
Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespanAydilek, Asiye / Aydilek, Harun / Allahverdi, Ali et al. | 2015
- 2820
-
A production scheduling problem with uncertain sequence-dependent set-up times and random yieldJoo, Byung Jun / Xirouchakis, Paul et al. | 2015
- 2836
-
Scheduling to maximise worker satisfaction and on-time ordersRuiz-Torres, Alex J. / Alomoto, Nelson / Paletta, Giuseppe / Pérez, Eduardo et al. | 2015
- 2853
-
A particle swarm optimisation for the no-wait flow shop problem with due date constraintsSamarghandi, Hamed et al. | 2015
- 2871
-
Modelling schedule reliabilityLödding, Hermann / Kuyumcu, Arif et al. | 2015