The use of upstream and downstream information in scheduling semiconductor batch operations (English)
National licence
- New search for: Robinson, J. K.
- New search for: Fowler, J. W.
- New search for: Bard, J. F.
- New search for: Robinson, J. K.
- New search for: Fowler, J. W.
- New search for: Bard, J. F.
In:
International Journal of Production Research
;
33
, 7
;
1849-1869
;
1995
- Article (Journal) / Electronic Resource
-
Title:The use of upstream and downstream information in scheduling semiconductor batch operations
-
Contributors:
-
Published in:International Journal of Production Research ; 33, 7 ; 1849-1869
-
Publisher:
- New search for: Taylor & Francis
-
Publication date:1995-07-01
-
Size:21 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Source:
Table of contents – Volume 33, Issue 7
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1791
-
Models and solution approaches for part movement minimization and load balancing in FMS with machine, tool and process plan flexibilitiesModi, B. K. / Shanker, K. et al. | 1995
- 1817
-
Detecting process non-randomness through a fast and cumulative learning ART-based pattern recognizerHwarng, H. B. / Chong, C. W. et al. | 1995
- 1835
-
An analysis of multi-level lot-sizing problems with a bottleneck under a rolling schedule environmentToklu, B. / Wilson, J. M. et al. | 1995
- 1849
-
The use of upstream and downstream information in scheduling semiconductor batch operationsRobinson, J. K. / Fowler, J. W. / Bard, J. F. et al. | 1995
- 1871
-
A simulation approach for the analysis of the effect of randomness in cutting surface constraints in the machining economics problemSarper, H. et al. | 1995
- 1881
-
The role of MRP in repetitive manufacturingSpencer, M. S. / Cox, J. F. III et al. | 1995
- 1901
-
Counterpropagation neural network for modelling a continuous correlated processWhittaker, A. D. / Cook, D. F. et al. | 1995
- 1911
-
A genetic algorithm approach to curve fittingGulsen, M. / Smith, A. E. / Tate, D. M. et al. | 1995
- 1925
-
Terminal location and guide path design in terminal based AGV systemsMajety, S. V. / Wang, M. H. et al. | 1995
- 1939
-
Neural-network based fault diagnosis of hydraulic forging presses in ChinaLin, H. / Yih, Y. / Salvendy, G. et al. | 1995
- 1953
-
The design of a line control system for the modular furniture industryRomero-Subiron, F. / Rosado, P. et al. | 1995
- 1973
-
A framework for modelling setup carryover in the capacitated lot sizing problemGopalakrishnan, M. / Miller, D. M. / Schmidt, C. P. et al. | 1995
- 1973
-
A framework for rnodelling setup carryover in the capacitated lot sizing problemGopalakrishnan, M. et al. | 1995
- 1989
-
Heuristic algorithms for buffer allocation in a production line with unreliable machinesSeong, D. / Chang, S. Y. / Hong, Y. et al. | 1995
- 2007
-
Integrative versus separate cycle scheduling heuristics for capacitated discrete lot sizing and sequencing problemsKim, D. / Mabert, V. A. et al. | 1995
- 2023
-
A prototype fuzzy resistance spot welding systemKhoo, L. P. / Young, H. Y. et al. | 1995
- 2037
-
A performance measuring matrix for capturing the impact of AMTNoori, H. / Gillen, D. et al. | 1995
- 2049
-
Revisiting the mixed-model multi-level just-in-time scheduling problemMiltenburg, John / Sinnamon, Gordon et al. | 1995
- 2049
-
Discussion. Revisiting the mixed-model multi-level just-in-time scheduling problemMiltenburg, J. et al. | 1995
- 2053
-
Which is better, off-line or real-time scheduling?Wan, Y. -W. et al. | 1995
- 2061
-
Discussion A note on 'scheduling mixed-model multi-level just-in-time production systems'*Morabito, M. A. / Kraus, M. E. et al. | 1995
- 2061
-
A note on `scheduling mixed-model multi-level just-in-time production systems'| 1995
- 2065
-
A review of: “Object-Orientated Softwarc?,for Manufacturing Systems“. Edited by S. ADIGA (Chapman & Hall, London, 1992) [Pp. xiv + 278.] Price: £3543.Pickering, M. / Newman, S. T. et al. | 1995
- 2065
-
A review of: “Engineering Reliability: Fundamentals and Applications”. By R. RAMAKUMAR (Prentice-Hall, 1993) [Pp. xiii + 482].Sarker, Bhaba R. et al. | 1995
- 2065
-
Book reviews| 1995
- 2067
-
Announcement| 1995