A new Silver-Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing (English)
- New search for: Schulz, Tobias
- New search for: Schulz, Tobias
In:
International Journal of Production Research
;
49
, 9
;
2519-2533
;
2011
- Article (Journal) / Electronic Resource
-
Title:A new Silver-Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing
-
Contributors:Schulz, Tobias ( author )
-
Published in:International Journal of Production Research ; 49, 9 ; 2519-2533
-
Publisher:
- New search for: Taylor & Francis
-
Publication date:2011-05-01
-
Size:15 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 49, Issue 9
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 2457
-
Lot sizing and scheduling: industrial extensions and research opportunitiesClark, Alistair / Almada-Lobo, Bernardo / Almeder, Christian et al. | 2011
- 2463
-
A hybrid general lot-sizing and scheduling formulation for a production process with a two-stage product structureTranschel, Sandra / Minner, Stefan / Kallrath, Josef / Lohndorf, Nils / Eberhard, Ulrich et al. | 2011
- 2481
-
The lot sizing and scheduling of sand casting operationsHans, Erwin / van de Velde, Steef et al. | 2011
- 2501
-
An improved Lagrangean relaxation algorithm for the dynamic batching decision problemTang, Lixin / Meng, Ying / Liu, Jiyin et al. | 2011
- 2519
-
A new Silver-Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturingSchulz, Tobias et al. | 2011
- 2535
-
Determination of the optimal production policy and product recovery policy: The impacts of sales margin of recovered productKim, Taebok / Goyal, Suresh Kumar et al. | 2011
- 2551
-
Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost salesAbsi, Nabil / Kedad-Sidhoum, Safia / Dauzere-Peres, Stephane et al. | 2011
- 2567
-
Comparison of just-in-time and time window delivery policies for a single-item capacitated lot sizing problemAkbalik, Ayse / Penz, Bernard et al. | 2011
- 2587
-
Exact solution approaches for the discrete lot-sizing and scheduling problem with parallel resourcesGicquel, Celine / Minoux, Michel / Dallery, Yves et al. | 2011
- 2605
-
Proportional lot-sizing and scheduling problem with identical parallel machinesKaczmarczyk, Waldemar et al. | 2011
- 2625
-
Economic lot scheduling with resources in parallelHaksoz, Cağrı / Pinedo, Michael et al. | 2011
- 2643
-
Cooperative lot sizing with transshipments and scarce capacities: solutions and fair cost allocationsDrechsel, J. / Kimms, A. et al. | 2011
- 2669
-
Lot streaming multiple jobs in a flow shopGlass, Celia A. / Possani, Edgar et al. | 2011
- 2683
-
A genetic algorithm for lot sizing and scheduling under capacity constraints and allowing backordersGoncalves, Jose Fernando / Sousa, Paulo S. A. et al. | 2011