Status review and research strategies on product-service systems (English)
- New search for: Wang, P. P.
- New search for: Ming, X. G.
- New search for: Li, D.
- New search for: Kong, F. B.
- New search for: Wang, L.
- New search for: Wu, Z. Y.
- New search for: Wang, P. P.
- New search for: Ming, X. G.
- New search for: Li, D.
- New search for: Kong, F. B.
- New search for: Wang, L.
- New search for: Wu, Z. Y.
In:
International Journal of Production Research
;
49
, 22
;
6863-6883
;
2011
- Article (Journal) / Electronic Resource
-
Title:Status review and research strategies on product-service systems
-
Contributors:Wang, P. P. ( author ) / Ming, X. G. ( author ) / Li, D. ( author ) / Kong, F. B. ( author ) / Wang, L. ( author ) / Wu, Z. Y. ( author )
-
Published in:International Journal of Production Research ; 49, 22 ; 6863-6883
-
Publisher:
- New search for: Taylor & Francis
-
Publication date:2011-11-01
-
Size:21 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 49, Issue 22
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 6591
-
Transient inter-production scheduling based on Petri nets and constraint programmingBourdeaud'huy, Thomas / Belkahla, Olfa / Yim, Pascal / Korbaa, Ouajdi / Ghedira, Khaled et al. | 2011
- 6609
-
Heuristics for the re-balancing of a vehicle assembly lineGrangeon, Nathalie / Leclaire, Patrice / Norre, Sylvie et al. | 2011
- 6629
-
Entrepreneurial SCM competence and performance of manufacturing SMEsHsu, Chin-Chun / Tan, Keah Choon / Laosirihongthong, Tritos / Leong, G. Keong et al. | 2011
- 6651
-
Evaluation of agility in supply chains using fuzzy association rules miningVinodh, S. / Prakash, N. Hari / Selvan, K. Eazhil et al. | 2011
- 6663
-
Distributed simulation of virtual workshops for the multi-site scheduling feasibility evaluationEnjalbert, S. / Archimede, B. / Charbonnaud, P. et al. | 2011
- 6677
-
Resources assignment model in maintenance activities schedulingAit-Kadi, D. / Menye, J. -B. / Kane, H. et al. | 2011
- 6691
-
A GA-based method to reduce material handling: the case of TFT-LCD array Fabs in TaiwanTseng, Shian-Shyong / Chang, Fengming M. / Chu, Yian-Shu / Chi, Pi-Ju et al. | 2011
- 6713
-
A quantitative model for ERP investment decision: considering revenue and costs under uncertaintyWu, Liang-Chuan / Liou, Fang-Ming et al. | 2011
- 6729
-
Solution algorithms for dynamic lot-sizing in remanufacturing systemsAhn, Hyung-Dae / Lee, Dong-Ho / Kim, Hwa-Joong et al. | 2011
- 6749
-
A simple heuristic for linear sequencing of machines in layout designKumar, M. Siva / Islam, M. N. / Lenin, N. / Vignesh Kumar, D. / Ravindran, D. et al. | 2011
- 6769
-
Production system design to achieve energy savings in an automotive paint shopGuerrero, Claudia Arenas / Wang, Junwen / Li, Jingshan / Arinez, Jorge / Biller, Stephan / Huang, Ningjian / Xiao, Guoxian et al. | 2011
- 6787
-
Setup tasks scheduling during production resettingsPessan, C. / Neron, E. et al. | 2011
- 6813
-
Integrated method for tool path generation in five-axis sculptured surface machiningFan, Jianhua / Ball, Alan et al. | 2011
- 6833
-
Analytical models for analysis of automated warehouse material handling systemsHeragu, Sunderesh S. / Cai, Xiao / Krishnamurthy, Ananth / Malmborg, Charles J. et al. | 2011
- 6863
-
Status review and research strategies on product-service systemsWang, P. P. / Ming, X. G. / Li, D. / Kong, F. B. / Wang, L. / Wu, Z. Y. et al. | 2011
- 6885
-
Scheduling algorithms to minimise the total family flow time for job shops with job familiesYu, Jae-Min / Kim, Ji-Su / Lee, Dong-Ho et al. | 2011