Two-stage renewing warranty policy with the threshold of maintenance times (Unknown)
- New search for: Su, Chun
- New search for: Yang, Xiaotian
- New search for: Su, Chun
- New search for: Yang, Xiaotian
In:
International Journal of Production Research
;
59
, 20
;
6210-6222
;
2021
- Article (Journal) / Electronic Resource
-
Title:Two-stage renewing warranty policy with the threshold of maintenance times
-
Contributors:Su, Chun ( author ) / Yang, Xiaotian ( author )
-
Published in:International Journal of Production Research ; 59, 20 ; 6210-6222
-
Publisher:
- New search for: Taylor & Francis
-
Publication date:2021-10-18
-
Size:13 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:Unknown
-
Keywords:
-
Source:
Table of contents – Volume 59, Issue 20
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 6034
-
Assessing the performances of a novel decentralised scheduling approach in Industry 4.0 and cloud manufacturing contextsGrassi, Andrea / Guizzi, Guido / Santillo, Liberatina Carmela / Vespoli, Silvestro et al. | 2021
- 6054
-
Dispatch optimisation in O2O on-demand service with crowd-sourced and in-house driversTao, Jiawei / Dai, Hongyan / Jiang, Hai / Chen, Weiwei et al. | 2021
- 6069
-
A distribution-free Shewhart-type Mann–Whitney control chart for monitoring finite horizon productionsCelano, Giovanni / Chakraborti, Subhabrata et al. | 2021
- 6087
-
Blockchain adoption in operations and supply chain management: empirical evidence from an emerging economyQueiroz, Maciel M. / Fosso Wamba, Samuel / De Bourmont, Marc / Telles, Renato et al. | 2021
- 6104
-
Strategic management of product recovery and its environmental impactWang, Zhe / Wang, Yue / Liu, Zhi / Cheng, Jinshi / Chen, Xintong et al. | 2021
- 6125
-
Assessment of financial risk in the design and scheduling of multipurpose plants under demand uncertaintyVieira, Miguel / Paulo, Helena / Pinto-Varela, Tânia / Barbosa-Póvoa, Ana Paula et al. | 2021
- 6146
-
An enhanced multi-objective JAYA algorithm for U-shaped assembly line balancing considering preventive maintenance scenariosZhang, Zikai / Tang, Qiuhua / Han, Dayong / Qian, Xinbo et al. | 2021
- 6166
-
Mathematical formulations for the parallel machine scheduling problem with a single serverElidrissi, Abdelhak / Benmansour, Rachid / Benbrahim, Mohammed / Duvivier, David et al. | 2021
- 6185
-
Development of a reliable and flexible supply chain network design model: a genetic algorithm based approachVishnu, C. R. / Das, Sangeeth P. / Sridharan, R. / Ram Kumar, P. N. / Narahari, N. S. et al. | 2021
- 6210
-
Two-stage renewing warranty policy with the threshold of maintenance timesSu, Chun / Yang, Xiaotian et al. | 2021
- 6223
-
An approach for optimising the fixturing configuration in flexible machining fixturesLi, Xiaoyue / Yang, Yinfei / Li, Liang / Shi, Yaowen / Zhao, Guolong / He, Ning / Qian, Ning / Mu, Zhuang et al. | 2021
- 6241
-
A study on DAA-based crane scheduling models for steel plantYuan, Fei / Feng, Kai / Lin, Shi-jing / Xu, An-jun et al. | 2021
- 6252
-
The value of flexibility in mitigating supply chain transportation risksPellegrino, Roberta / Costantino, Nicola / Tauro, Danilo et al. | 2021
- 6270
-
Rationing policies in a spare parts inventory system with customers differentiationKouki, Chaaben / Larsen, Christian et al. | 2021
- 6291
-
Forward and reverse logistics vehicle routing problems with time horizons in B2C e-commerce logisticsZhang, Mengdi / Pratap, Saurabh / Zhao, Zhiheng / Prajapati, D. / Huang, George Q. et al. | 2021
- 6311
-
Nonparametric monitoring of multivariate data via KNN learningLi, Wendong / Zhang, Chi / Tsung, Fugee / Mei, Yajun et al. | 2021
- 6327
-
Parallel machine scheduling with stochastic release times and processing timesLiu, Xin / Chu, Feng / Zheng, Feifeng / Chu, Chengbin / Liu, Ming et al. | 2021