Scheduling and rescheduling methodologies (English)
- New search for: Mason, S.J.
- New search for: Skinner, G.
- New search for: Qu, P.
- New search for: Jin, S.
- New search for: Wessels, C.
- New search for: Pfund, M.
- New search for: Fowler, J.W.
- New search for: Carlyle, W.M.
- New search for: Kim, B.
- New search for: Mason, S.J.
- New search for: Skinner, G.
- New search for: Qu, P.
- New search for: Jin, S.
- New search for: Wessels, C.
- New search for: Pfund, M.
- New search for: Fowler, J.W.
- New search for: Carlyle, W.M.
- New search for: Kim, B.
In:
FAIM, Flexible Automation and Intelligent Manufacturing, International Conference, 12
;
1464-1471
;
2002
-
ISBN:
- Conference paper / Print
-
Title:Scheduling and rescheduling methodologies
-
Additional title:Planungs- und Rückplanungs-Methoden
-
Contributors:Mason, S.J. ( author ) / Skinner, G. ( author ) / Qu, P. ( author ) / Jin, S. ( author ) / Wessels, C. ( author ) / Pfund, M. ( author ) / Fowler, J.W. ( author ) / Carlyle, W.M. ( author ) / Kim, B. ( author )
-
Published in:
-
Publisher:
- New search for: Oldenbourg Industrieverlag
-
Place of publication:München
-
Publication date:2002
-
Size:8 Seiten, 16 Quellen
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 8
-
Optimization principles of modern material handling systemsSönmez, N. / Özgürler, M. / Sönmez, H. et al. | 2002
- 16
-
Simulation and fuzzy logic decision support system as an integrated approach for distributed planning of productionBruzzone, A.G. / Mosca, R. et al. | 2002
- 26
-
Analysis of manufacturing systems with asynchronous motorsJirku, S. / Vondrich, J. et al. | 2002
- 44
-
Predicting sheet metal manufacturing using neural networkSun, B. / Huhtala, P. / Torvinen, S. et al. | 2002
- 55
-
Neural networks and the life of insulating material for windings in electric rotary machinesHammer, M. / Kozlovsky, T. / Kratochvil, P. / Baros, M. et al. | 2002
- 64
-
Application of initial estimate expert system focused on special type mould structureSang-bong, P. et al. | 2002
- 76
-
Quick and non-destructive testing of small laser drillingsUffrecht, W. / Kaiser, E. et al. | 2002
- 84
-
Simulation of the intermittent cutting action of a Bandsaw bladeSarwar, M. / Hellbergh, H. / Doraisingam, A.R. / Persson, M. et al. | 2002
- 93
-
Agent-based acquisition and preparation of distributed technological information for NC planning and calculation methods in part manufacturingFichtner, D. / Nestler, A. / Arnold, F. et al. | 2002
- 104
-
An analysis of two isotropic electrically conductive adhesives as a solder replacement in SMTCoughlan, F.M. / Lewis, H.J. et al. | 2002
- 116
-
Intelligent feature model for flexible manufacturingMbang, S. / Stroehle, H. / Haasis, S. et al. | 2002
- 127
-
Inventory games in a two-stage serial supply chain with asymmetric cost informationSeo, S. / Kim, S.S. et al. | 2002
- 138
-
On the design of networks in reverse logisticsLieckens, K. / Vandaele, N. et al. | 2002
- 148
-
Inter-technology analysis sharing model for e-supply chain formationKojima, T. et al. | 2002
- 175
-
Design and realization of an on-line optimitzation system for distillation processSun, C. / Xu, B. et al. | 2002
- 196
-
A simulation system approach to solve the maintanence planning problemsOzgurler, M. / Gulsun, B. / Guneri, A.F. et al. | 2002
- 206
-
The development and implementation of a concise pseudo recipe coding system within a multi-stage jop shopLavelle, D. / Sheahan, C. et al. | 2002
- 219
-
Information systems for the real time control of an integrated production environmentVellore, T.K.S. / Venkatesh, R.S. / Balasubramanian, S. / Craik, J. / Srihari, K. et al. | 2002
- 229
-
Capacity requirements planning for electronics manufacturingMun, J.H. / Srihari, K. et al. | 2002
- 237
-
Reuse of existing product/process solutions for design of manufacturing facilityAlizon, F. / Dallery, Y. / Celerier, J.M. et al. | 2002
- 258
-
Stock optimization of a Kanban-based assembly lineDub, M. / Pipan, G. / Hanzalek, Z. et al. | 2002
- 268
-
Machining and tolerances in a flexible and integrated manufacturing contextMoroni, G. / Polini, W. et al. | 2002
- 289
-
Tool paths for belt grinding with predefined grinding directionsTönshoff, H.K. / Böß, V. et al. | 2002
- 295
-
Monitoring tool conditions for drillingVilcek, I. / Madl, J. et al. | 2002
- 302
-
Agile supply chain management for virtual enterpriseXiong, G.Y. / Koivisto, H. et al. | 2002
- 319
-
Distributed scheduling in extended value chain managementTeich, T. / Käschel, J. / Grossmann, D. / Heuke, A. / Jähn, H. et al. | 2002
- 329
-
Agent-based in-house process planning and production control for enterprises in supply chainsTönshoff, H.K. / Woelk, P.O. / Herzog, O. / Timm, I.J. et al. | 2002
- 339
-
Supply chain/network management: Basis of a conceptual frameworkSamaranayake, P. et al. | 2002
- 352
-
A simulation study of comparison job shop system and cellular manufacturing system: A case studyGulsun, B. / Guneri, A.F. et al. | 2002
- 360
-
Distributed simulation an efficient approach for modeling complex manufacturing systemsSeliger, G. / Ciupek, M. / Lee, W.O. et al. | 2002
- 371
-
Development of a design simulator for the logistic CIM system based on agent-oriented conceptFurukawa, M. / Onuma, A. / Watanabe, M. et al. | 2002
- 381
-
Generation of dynamic geometry for procedural visualization of manufacturing processesSormaz, D.N. / Borse, P.A. et al. | 2002
- 393
-
Simulating cycle duration of tower cranes operationsBrana, P. / Culo, K. / Sigmund, V. et al. | 2002
- 403
-
Modeling and simulation of metal cutting productionGabriel, R. et al. | 2002
- 419
-
A MAS reinforcement learning approach for indeterministic multi-layer job-shop schedulingChang, L. / Yang, J. et al. | 2002
- 428
-
A due-date based FAB scheduling schemeBaek, J.K. / Kim, C.O. / Baek, J.G. / Kim, S.S. et al. | 2002
- 438
-
Intelligent machine maintenance scheduling model using incremental decision tree and dynamic programmingBaek, J.G. / Kim, C.O. / Baek, J.K. / Kim, S.S. et al. | 2002
- 450
-
Analysis of multi-stage, multi-product, decentralized, pull-type production systems with dynamically changing switching prioritiesGurgur, C.Z. / Altiok, T. et al. | 2002
- 470
-
Agility index of manufacturing firm - A fuzzy weighted average approachLin, C.T. / Shih, Y.C. et al. | 2002
- 483
-
An expert system aid for technological decisions in planning sheet metal forming operationsTeleionis, S. / Vosniakos, G.C. / Giannakakis, T. et al. | 2002
- 493
-
Selecting co-operation partners for non-hierarchical production networksDürr, H. / Mehnert, J. / Görlitz, O. / Neubert, R. et al. | 2002
- 502
-
Optimization of cutting conditions during machining by using neural networksZuperl, U. / Cus, F. et al. | 2002
- 522
-
The neural nets with distributed architectureKalinin, A.V. / Podvalny, S.L. / Balashov, A.A. / Chernikova, I.A. et al. | 2002
- 530
-
Optimized grasping planning for robotic sheet metal bendingAomura, S. / Koguchi, A. et al. | 2002
- 541
-
Machining of plaster prototypes using a 6-axis robotic systemAntunes Simoes, J.F.C.P. / Coole, T.J. / Cheshire, D.G. / Antunes Simoes, M.E. et al. | 2002
- 552
-
Implementation of machine vision in auto-calibrating robot systemLing, D.S.H. / Lin, G.C.I. / Lee, S.H. / Wahyudi, H. et al. | 2002
- 562
-
Development of a postprocessor for a dual-robot machining centerHuang, H.K. / Lin, G.C.I. et al. | 2002
- 594
-
Developing a model of the strategy process with business process re-engineering modelling techniquesMunive, E. / Barber, K. / Dewhurst, F. et al. | 2002
- 603
-
To realize enterprise integration of virtual pulp & paper enterpriseXiong, G. / Xiong, G.Y. / Nyberg, T.R. et al. | 2002
- 614
-
Reinventing the wheel: Adapting the CASA manufacturing enterprise model to the contemporary virtual enterpriseEstrem, W.A. / Rowen, R.B. / Mills, A.C. et al. | 2002
- 624
-
Advanced resource planningVandaele, N. / Boeck, L. de et al. | 2002
- 634
-
Batch scheduling of unrelated parallel machines with setup times using search heuristicsNa, D.G. / Kim, D.W. / Chen, F.F. et al. | 2002
- 654
-
New directions of developing a production planning model based on the cost of unused capacity approachSebestyen, Z. / Koltai, T. et al. | 2002
- 664
-
Sequencing for mixed-model assembly lines with bottleneck resources using tabu searchSaad, S.M. / Lassila, A.M. et al. | 2002
- 676
-
An interactive multi-media training system for CNC machiningVosniakos, G.C. / Katsiris, P. et al. | 2002
- 686
-
The competitive advantage of flexible automationSlomp, J. / Gaalman, G. et al. | 2002
- 696
-
The successful key factors analysis of new product introduction in electronics manufacturing services industryChang, S.H. / Yu, J.L. / Kuo, T.C. / Li, R.K. et al. | 2002
- 724
-
Octree-based volumetric NC simulation systemKarunakaran, K.P. / Modani, P.K. / Gupta, N. / Shanmuganathan, V.P. / Garg, S. / Fichtner, D. et al. | 2002
- 744
-
Information sharing architecture using internet's SOAP and XMLAdhikari, P. / Paidy, S. et al. | 2002
- 762
-
Management of production networks - a new approach to work with probabilities of deliveryTeich, T. / Zschorn, L. / Jähn, H. et al. | 2002
- 784
-
Developing a safey culture in manufacturing engineeringHickey, T.J. / Gaughran, W.F. et al. | 2002
- 794
-
ERP-controlled manufacturing environment disturbed by uncertaintyKoh, S.C.L. / Saad, S.M. et al. | 2002
- 804
-
Making improvements in key performance indicatorsAhmad, M. / Dhafr, N. et al. | 2002
- 812
-
Designing an internet-based group decision support systemWang, K.J. / Chien, C.F. et al. | 2002
- 824
-
A general data mining model of lifetime-based quality evaluation and production for maintenanceJiang, Q.M. / Chen, C.H. / Khoo, L.P. et al. | 2002
- 836
-
An integrated optimization tool for flow shop schedulingCelano, G. / Costa, A. / Fichera, S. et al. | 2002
- 846
-
High-speed smooth cyclical motion of a hydraulic cylinderJaksic, N.I. et al. | 2002
- 858
-
Reducing set-up times of manufacturing linesGoubergen, D. van / Landeghem, H. van et al. | 2002
- 878
-
Capacity management of heat treatment process in a manufacturing environmentOduoza, C.F. et al. | 2002
- 890
-
Bluetooth wireless technology for industrial applicationsSalleh, N.A. / Koivisto, H. et al. | 2002
- 898
-
Kaizen applications in just-in-time manufacturing and time measurements in improving manufacturing productivityÖzgürler, M. / Sönmez, N. et al. | 2002
- 963
-
Internet system for programming robots for distance learning applicationsPangrekar, M. / Miller, W.A. et al. | 2002
- 971
-
Technologies, components and equipment for intelligent production systemsNeugebauer, R. / Harzbecker, C. / Drossel, W. / Ihlenfeldt, S. et al. | 2002
- 1006
-
Systems engineering - A new international programme of studyDürr, H. / Wirth, S. et al. | 2002
- 1014
-
New evaluation criteria for manufacturing engineering programs in the United StatesDryden, R.D. / Erzurumlu, H.C.M. et al. | 2002
- 1024
-
Education of students at a CIM-compatible CAM-training systemKubin, H. / Kabitzsch, K. et al. | 2002
- 1036
-
Virtual organizations in manufacturing: Trends and challengesCamarinha-Matos, L.M. et al. | 2002
- 1056
-
Automatic generation of disassembly sequences of product design for recyclingNi, J. / Richter, M. / Lossack, R.S. / Grabowski, H. et al. | 2002
- 1063
-
Offset surfaces constructionLinkeova, I. et al. | 2002
- 1073
-
An analytical model for design iterations in an integrated manufacturing environmentJiao, L. / Chen, C.H. / Khoo, L.P. et al. | 2002
- 1093
-
A feature-based process to reuse data in the mechanical designCunha, R.R.M. da / Dias, A. et al. | 2002
- 1135
-
Modeling and optimization of process plans on internetSormaz, D.N. / Thirupalli, S. / Borse, P. / Arumugam, J. / Jain, S. et al. | 2002
- 1154
-
Process based cost modeling for engineering applicationsBao, H.P. / Kulkarni, U.A. et al. | 2002
- 1185
-
Predictability and optimisation of the earliness/tardiness penalty-cost performance in a dynamic multi-agent single-machine modelIndrayadi, Y. / Brussel, H. van / Valckenaers, P. et al. | 2002
- 1195
-
Optimization of quality costsOppermann, M. / Sauer, W. / Wohlrabe, H. et al. | 2002
- 1214
-
Continuous improvement techniques for automated material handling systemsGlüer, D. et al. | 2002
- 1224
-
An evaluation of scheduling and dispatching algorithms in high tech manufacturing environments with uncertaintyPfund, M. / Fowler, J.W. / Carlyle, W.M. et al. | 2002
- 1231
-
A modified shifting bottleneck heuristic for scheduling wafer fabrication facilitiesFowler, J.W. / Brown, S. / Carlyle, W.M. / Gel, E.S. / Mason, S.J. / Moench, L. / Rose, O. / Runger, G.C. / Sturm, R. et al. | 2002
- 1237
-
Single wafer stocker for 300 mm manufacturingFederici, R. / Wüstrich, B. / Schulz, M. / Jungmann, G. / Orthgiess, E. et al. | 2002
- 1258
-
Study on integration of CAD and CAM in autobody panelCui, A. / Riitahuhta, A. / Ma, T. / Wang, L. et al. | 2002
- 1265
-
Development of a flexible gripping system part 1 - Guidelines for flexible gripper designSexton, C. / Lin, G.C.I. / Lee, S.H. / Nagalingam, S. et al. | 2002
- 1272
-
Development of a flexible gripping system part 2 - A case study on the development of a flexible gripping system for sheet metal bending operationsSexton, C. / Lin, G.C.I. / Lee, S.H. / Nagalingam, S. / James, I. / Godfrey, D. et al. | 2002
- 1289
-
Strategies for creative engineeringGaughran, W.F. et al. | 2002
- 1320
-
Optimising the batch production of bacterial celluloseGerrard, A.M. / Cumming, R.H. / Hornung, M. / Schmauder, H.P. et al. | 2002
- 1327
-
Minimizing the mean flow time in a two-machine group scheduling problem with carryover sequence dependencyLogendran, R. / Sriskandarajah, C. / Gelogullari, C.A. et al. | 2002
- 1350
-
Development of a flexible production activity control and automated process planning system for an engineer-to-order small to medium enterpriseConnolly, F. / Sheahan, C. et al. | 2002
- 1364
-
Information technology and knowledge management in manufacturingKeane, J.P. / Barber, K.D. et al. | 2002
- 1394
-
Emergence of intelligence in next-generation manufacturing systemsBrezocnik, M. / Balic, J. et al. | 2002
- 1424
-
Cycle time management during production ramp-upHaller, M. / Peikert, A. / Thoma, J. et al. | 2002
- 1440
-
Event and data triggers for reschedulung in wafer fabsGel, E.S. / Runger, G. / Pfund, M. / Fowler, J.W. / Burhanuddin, A. / Vardar, C. et al. | 2002
- 1446
-
Trouble systematic based maintenance (TSBM) in a continiuous transport-system in the semiconductor industryHeinrich, H. / Niekisch, T. et al. | 2002
- 1457
-
Testing, comparison, and implementation issuesRose, O. / Mönch, L. / Sturm, R. et al. | 2002
- 1464
-
Scheduling and rescheduling methodologiesMason, S.J. / Skinner, G. / Qu, P. / Jin, S. / Wessels, C. / Pfund, M. / Fowler, J.W. / Carlyle, W.M. / Kim, B. et al. | 2002