Assessing the effects of manufacturing infrastructure preparation prior to enterprise information-systems implementation (English)
- New search for: Li, L.
- New search for: Markowski, E.P.
- New search for: Markowski, C.
- New search for: Xu, L.
- New search for: Li, L.
- New search for: Markowski, E.P.
- New search for: Markowski, C.
- New search for: Xu, L.
In:
International Journal of Production Research
;
46
, 6
;
1645-1665
;
2008
-
ISSN:
- Article (Journal) / Print
-
Title:Assessing the effects of manufacturing infrastructure preparation prior to enterprise information-systems implementation
-
Contributors:
-
Published in:International Journal of Production Research ; 46, 6 ; 1645-1665
-
Publisher:
-
Publication date:2008
-
Size:21 Seiten
-
ISSN:
-
Coden:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 46, Issue 6
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1373
-
Framework for flexibility in dynamic supply chain managementWadhwa, S. et al. | 2008
- 1405
-
A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problemAgrawal, S. et al. | 2008
- 1431
-
Learning effective dispatching rules for batch processor schedulingGeiger, Christopher et al. | 2008
- 1455
-
Modular fixture planning for minimum three-dimensional tolerances using a neutral part data exchange formatBansal, S. et al. | 2008
- 1477
-
Integrating production-transportation planning decision with fuzzy multiple goals in supply chainsLiang, T.-F. et al. | 2008
- 1495
-
Optimal storage rack design for a 3-dimensional compact AS-RSde Koster, R.B.M. et al. | 2008
- 1515
-
A hint-based machining feature recognition system for 2.5D partsVerma, A.K. et al. | 2008
- 1539
-
Finite capacity scheduling with mixed duration tooling treesMartin, Rodney et al. | 2008
- 1567
-
Process flexibility with bill of material constraintsHua, Z. et al. | 2008
- 1587
-
Multi-objective design optimization of reconfigurable machine tools: a modified fuzzy-Chebyshev programming approachLiu, Wei et al. | 2008
- 1619
-
Modeling industrial lot sizing problems: a reviewJans, Raf et al. | 2008
- 1645
-
Assessing the effects of manufacturing infrastructure preparation prior to enterprise information-systems implementationLi, L. et al. | 2008
- 1667
-
Accounting-based heuristics for order processing and review in a stochastic environmentFry, Timothy et al. | 2008
- 1685
-
A methodology for cutting-tool management through the integration of CAPP and schedulingMeseguer, A. et al. | 2008
- 1707
-
Single machine group scheduling with family setups to minimize total tardinessGupta, Jatinder et al. | 2008