Centralized and decentralized control polices for a two-stage stochastic supply chain with subcontracting (English)
- New search for: Saharidis, Georgios K.D.
- New search for: Kouikoglou, Vassilis S.
- New search for: Dallery, Yves
- New search for: Saharidis, Georgios K.D.
- New search for: Kouikoglou, Vassilis S.
- New search for: Dallery, Yves
In:
International Journal of Production Economics
;
117
, 1
;
117-126
;
2009
-
ISSN:
- Article (Journal) / Print
-
Title:Centralized and decentralized control polices for a two-stage stochastic supply chain with subcontracting
-
Contributors:
-
Published in:International Journal of Production Economics ; 117, 1 ; 117-126
-
Publisher:
-
Publication date:2009
-
Size:10 Seiten
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 117, Issue 1
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Fuzzy multi-criteria decision model for evaluating reconfigurable machinesAbdi, M.R. et al. | 2008
- 16
-
VRP revisited: The impact of behavioural costs in balancing standardisation and varietyBrun, Alessandro / Capra, Eugenio / Miragliotta, Giovanni et al. | 2008
- 30
-
An association clustering algorithm for can-order policies in the joint replenishment problemTsai, Chieh-Yuan / Tsai, Chi-Yang / Huang, Po-Wen et al. | 2008
- 42
-
Critical success factors for human resource outcomes in Kaizen events: An empirical studyFarris, Jennifer A. / Van Aken, Eileen M. / Doolen, Toni L. / Worley, June et al. | 2008
- 66
-
Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation modelsBetterton, Carl E. / Cox, James F. III et al. | 2008
- 80
-
Game theoretical perspectives on dual-channel supply chain competition with price discounts and pricing schemesCai, Gangshu (George) / Zhang, Zhe George / Zhang, Michael et al. | 2008
- 97
-
Cobacabana (control of balance by card-based navigation): A card-based system for job shop controlLand, Martin J. et al. | 2008
- 104
-
Ground handling services at European hub airports: Development of a performance measurement system for benchmarkingSchmidberger, Stephan / Bals, Lydia / Hartmann, Evi / Jahns, Christopher et al. | 2008
- 117
-
Centralized and decentralized control polices for a two-stage stochastic supply chain with subcontractingSaharidis, Georgios K.D. / Kouikoglou, Vassilis S. / Dallery, Yves et al. | 2008
- 127
-
A least flexibility first heuristic to coordinate setups in a two- or three-stage supply chainLiao, Ching-Jong / Shyu, Cian-Ci / Tseng, Chao-Tang et al. | 2008
- 136
-
A binary solution method for the multi-product newsboy problem with budget constraintZhang, Bin / Xu, Xiaoyan / Hua, Zhongsheng et al. | 2008
- 142
-
A note on due-date assignment and single machine scheduling with a learning/aging effectChang, Pei-Chann / Chen, Shih-Hsin / Mani, V. et al. | 2008
- 150
-
A vehicle scheduling problem with fixed trips and time limitationsEliiyi, Deniz Türsel / Ornek, Arslan / Karakütük, Sadık Serhat et al. | 2008
- 162
-
Two-echelon supply chain coordination through the unified number of annual ordersZhou, Yong-Wu et al. | 2008
- 174
-
Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturingTsai, Kune-muh / Wang, Shan-chi et al. | 2008
- 185
-
Hybrid flow shop scheduling with parallel batchingAmin-Naseri, Mohammad Reza / Beheshti-Nia, Mohammad Ali et al. | 2008
- 197
-
Optimization analysis of supply chain scheduling in mass customizationYao, Jianming / Liu, Liwen et al. | 2008
- 212
-
Introducing a new ordering policy in a two-echelon inventory system with Poisson demandHaji, Rasoul / Neghab, Mohammadali Pirayesh / Baboli, Armand et al. | 2008
- 219
-
Probabilistically constrained models for efficiency and dominance in DEABruni, M.E. / Conforti, D. / Beraldi, P. / Tundis, E. et al. | 2008
- 229
-
Supplier selection problem for a single manufacturing unit under stochastic demandAwasthi, A. / Chauhan, S.S. / Goyal, S.K. / Proth, Jean-Marie et al. | 2008