Please choose your delivery country and your customer group
Research for mechanism of concrete structure interacting with formwork support by manufacturing 2 test models of two-layer and single-span reinforced concrete frame at laboratory, and analysis interaction performance between concrete structure and formwork support and the influence of construction period, curing time of concrete and load on mechanical performance of formwork support system during the construction period. Research data shows:formwork support system interacted with concrete structure is a linear system when live load applied is smaller then crack load calculated according to mechanical indicators of loading-age concrete;load applied by formwork support system decreases with develop of curing time of concrete and removal of bottom support and construction period extension;it is also effected by environmental temperature.