Please choose your delivery country and your customer group
Desorption of Coalbed Methane is one of the key controls to CBM recovery ratio and production capacity. This paper discusses the impact of engineered measures on CBM overall desorption and production capacity with CBM model of Eclipse numerical simulation software. The simulation results show that: with the extension of hydraulic fracture half-length, overall desorption of coal reservoir increased and CBM production capacity improved, daily gas production, maximum gas production and stable yield time increased correspondingly; in different deployment of spacing and well network, the smaller spacing is beneficial to the overall desorption of coal reservoir, but its production can not keep stability because of the serious decline in the late stage of development, while the larger spacing shows in the opposite way.