A Critical Chain Project Scheduling Problem with Multi-Mode (English)
National licence
- New search for: Peng, Wu Liang
- New search for: Jiao, Q.J.
In:
Materials Science Forum
;
697-698
;
541-545
;
2011
- Article (Journal) / Electronic Resource
-
Title:A Critical Chain Project Scheduling Problem with Multi-Mode
-
Contributors:
-
Published in:Materials Science Forum ; 697-698 ; 541-545
-
Publisher:
- New search for: Trans Tech Publications
-
Place of publication:Stafa-Zurich, Switzerland
-
Publication date:2011-09-21
-
Size:5 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 697-698
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- -1
-
Preface, Organizers and Sponsors| 2012
- 3
-
The Formation Laws and Influencing Factors of Strengthening Layer in EDM of Stainless Steel 1Cr13| 2011
- 9
-
Study on Technology of Restraining the Vibration of Deep-Hole Boring and the Helix Lobes| 2011
- 13
-
Prediction of the Hardened Layer in Traverse Cylindrical Grinding-Hardening| 2011
- 19
-
Simulation on Characteristics of Grinding Fluid Jet Based on FLUENT| 2011
- 24
-
Analysis on Thermal Electromotive Force of Carbide Tools| 2011
- 28
-
Parameter-Design and Experimental Study on Small-Diameter Solid Carbide Deep-Hole Twist Drill| 2011
- 34
-
Numerical Analysis of Surface Temperature in Grind-Hardening Based on Time Variation Heat Flux| 2011
- 39
-
Finite Element Modeling of the Broaching Process of Inconel718| 2011
- 44
-
A Study on Planarization Grinding Process Based on the Cluster Magnetorheological Effect| 2011
- 49
-
Effect of Various Cooling Strategies on Surface Roughness of High Speed Milling Ti-6Al-4V| 2011
- 53
-
A New Vari-Speed Cutting Scheme for Chatter Suppression| 2011
- 57
-
Surface Damages Generated in Hole Making of a Cast Nickel-Based Alloy| 2011
- 61
-
Statistical Modeling of Surface Roughness in Hard Milling H13 Steel| 2011
- 67
-
Surface Burn and Suppression in Grinding TC4 with Segmented CBN Cup Wheel| 2011
- 71
-
A New Method for Identifying the Cutter Runout Parameters in Flat End Milling Process| 2011
- 75
-
Chip Thickness Analysis in Peripheral Milling of Curved Surfaces with Variable Curvature Considering Cutter Runout| 2011
- 80
-
Grinding Capability of the Indigenous Polymer-Based Solid Lubricant Coating Wheels Used in Dry Grinding| 2011
- 84
-
Research on the Influence Factors for the Deflection of Micro-Ball-End Cutter in Micro-End-Milling Process| 2011
- 88
-
An Experimental Study of Antirust Additives Ratio for Green Water-Based Lubricant| 2011
- 93
-
Study on Acoustic Emission Signatures during the Process of Edge Chipping for Engineering Ceramics| 2011
- 97
-
Identification of Bolt Connection Parameters for Vertical Grinding Machine in CAD/CAE Environment| 2011
- 102
-
Experimental Study in HSM of Titanium Alloy TC4-DT| 2011
- 107
-
Influences of Grinding Parameters on Forces in the Grinding of Microwave Ferrite Ceramic with Electroplated Diamond Wheel| 2011
- 112
-
Identification of Material Constitutive Parameters Using Orthogonal Cutting Tests and Genetic Algorithm| 2011
- 117
-
Study on the Relationship between Surface Roughness and Texture Features of Engineering Ceramics| 2011
- 121
-
Investigation of Abrasive Wear in the Dry Belt Grinding of Titanium Alloy| 2011
- 125
-
Process Parameter and Cutting-Tool Geometry Study for Precision Face Turning of a Clock Dial| 2011
- 129
-
Experiment Study on Deflection of Aluminum Alloy Thin-Wall Workpiece in Milling Process| 2011
- 133
-
Investigation of Surface Quality on Dry Belt Grinding of Ti6Al4V Alloy| 2011
- 137
-
The Effect of Rare Earth on the Clearance of Carbon during High Speed Polishing of Diamond Films| 2011
- 142
-
Tribological Design of Zirconia Nanocomposite Ceramic Tool and Die Material| 2011
- 147
-
Cutting Performance of High Speed Steel Hobs with Different Coating in Dry Hobbing| 2011
- 152
-
Study on Kaiser Effect of Edge Chipping for Engineering Ceramics during their Failure Process| 2011
- 157
-
Research on Cutting Cast Super Alloy K24 with Milling and Abrasive Water Jet Methods| 2011
- 161
-
Research of Micro Hole Vibration Drilling Process and Experiment| 2011
- 166
-
An Experimental Study of Radial-Mode Abrasive Waterjet Turning of Steels| 2011
- 171
-
Effect of EDM Conditions on Surface Residual Stress of Cr12MoV Steel| 2011
- 176
-
Finite Element Analysis and Optimization of Structure for Large Blanking Machine Equipment during High-Speed Blanking| 2011
- 182
-
Study on Micro Growth Process and Characteristics of Deposited Material in Micro EDM Deposition| 2011
- 187
-
Study on the Characteristics of Discharge Waveform in Micro EDM Deposition Process| 2011
- 192
-
Molecular Dynamics Simulation of Al2O3-SiC Interface| 2011
- 198
-
Cutting Temperature Investigation when High-Speed Milling of SiCP/Al Composites| 2011
- 204
-
An Explicit Integration Algorithm for Introducing User-Defined Thermo-Viscoplastic Constitutive Models in FE Simulations| 2011
- 208
-
Effect of Cutting Speed on Surface Integrity in High Speed Machining Nickel-Based Superalloy Inconel 718| 2011
- 213
-
The Research on Milling Forces of Dry Cutting Spiral Bevel Gears| 2011
- 218
-
Analysis on Milling Performance of 2024-T351 Aluminum Alloy Using TiAlN Coated Carbide Cutting Tools| 2011
- 223
-
Numerical Solution of Tuned Mass Dampers for Optimum Milling Chatter Suppression| 2011
- 229
-
Measurement Error Analysis of Spindle Thermal Deformation| 2011
- 235
-
Laser Shock Processing of Ni-Base Superalloy and High Cycle Fatigue Properties| 2011
- 239
-
Linear Motor Velocity and Acceleration Motion Control Study Based on PID+Velocity and Acceleration Feedforward Parameters Adjustment| 2011
- 244
-
Machining of Free-Form Surface Method and Implementation Research with Ball-End Cutter| 2011
- 249
-
The Research and Application of Multi-Point and Time-Sharing Measurement Method on NC Machine Tool| 2011
- 253
-
Optimization Method of Machining Center Multi-Joint Stiffness Based on Orthogonal Experiment and FEA| 2011
- 258
-
Evaluation Modeling and Optimal Adjustment of Position Error Based on Localization Sensitivity Analysis| 2011
- 262
-
A New Method for Identifying Geometric Errors Inherent to Revolving Axle of Multi-Axis Machine Tool| 2011
- 268
-
Studies on Tool Wear Monitoring Based on Cutting Force| 2011
- 273
-
Study on Spindle Thermal Field Distribution and Thermal Errors of Horizontal Machine Tool| 2011
- 277
-
Thermal Analysis of Dedicated Computer Based on ANSYS| 2011
- 282
-
Algorithm for the Inverse Kinematics Calculation of Cross Rods Parallel Machine Tools Based on Lie-Algebras| 2011
- 288
-
A Pipeline Designed Reconfigurable CNC Architecture| 2011
- 292
-
Tool Path Planning for Five-Axis NC Machining of Implant Shaping Mold for Cranioplasty| 2011
- 297
-
CNC Linear Cutting Logarithmic Spiral Type Internal Gears Sleeve Application Research| 2011
- 301
-
A Novel Method for Roll Error Measurement of a Linear Worktable of a Machine Tool| 2011
- 305
-
Development of the Thermal Error Measurement System for Machine Tool Spindle Based on Virtual Instruments Technology| 2011
- 309
-
Tool Path Planning and NC Generation of Tilted Plane Machining Features for Five-Axis Machining| 2011
- 314
-
A New Method for Single-Measurement and Compensating the Position Errors of a Three-Axis Machine Tool| 2011
- 320
-
Dynamic Analysis and Optimization of Machine Tool in Consideration of Joint Parameters| 2011
- 326
-
Solid-State Anaerobic Digestion for Methane Production from Corn Stalks with Stack-Pretreated| 2011
- 331
-
Experimental Study on Impact Force for Engineering Ceramics Machining with Micro-Detonation of Striking Arc| 2011
- 335
-
Study on Drilling Method of Small Diameter Deep-Hole of Titanium Alloy by Using DF of Gun Drill| 2011
- 339
-
Shifted Point Array Modeling of 3D Calibration| 2011
- 345
-
A Deterministic Method of Application Region of Clamping Forces for Fixture Design| 2011
- 351
-
Influence of Alternative Magnetic Field Frequency on Microstructure and Properties of Surfacing Welding Layer of Aluminum Alloy| 2011
- 356
-
Side Wrinkling Characteristics in Rotary-Draw Bending Process of Thin-Walled Rectangular 3A21 Tube| 2011
- 361
-
The Effect of Square Wave AC Parameters on Weld Forming Performance| 2011
- 365
-
Study on Working Hardening for the Sheet with Different Hardening Index by Fine-Blanking with Negative Clearance| 2011
- 371
-
Qualitative Analysis and Study the Workpiece Shearing Surface Quality of Fine-Blanking with Negative Clearance| 2011
- 377
-
Study on Multi-Factor Blanking Parameters for Fine-Blanking with Negative Clearance through Simulation Optimization| 2011
- 383
-
Characteristics and Formation Mechanism of Segregation During the Solidification of Aluminum Alloy with Ultrasonic Radiation| 2011
- 389
-
Process Parameter Optimization on Pneumatic Bulging for Abnormity Thin-Wall Pot| 2011
- 394
-
The Dissolution Mechanism of Copper Weld Brazing with Cu-Based Brazing Alloys| 2011
- 399
-
Effect of Weld Line Direction and Its Position on Drawing Performance of Tailor-Welded Blanks| 2011
- 404
-
Research on Stress Corrosion Behavior of AISI304 Stainless Steel Enhanced by Ultrasonic Peening Treatment| 2011
- 409
-
GTA Welding of Copper Thick Plates by Using ERCuTi Welding Materials| 2011
- 414
-
Conceptual Design for Upper Beam of Hydraulic Press| 2011
- 420
-
Study on the Maximum Forging Load and Final Face Width of Powder Spur Gear Forging| 2011
- 424
-
Study on Mapping of Forming Precision of Workpiece to Stiffness of Hydropress Frame| 2011
- 430
-
Research on the Propagation of the Crack Inclined across the Interface in the Cermet Cladding Part| 2011
- 436
-
Wear and Friction Properties of TiN,TiAlN and CrAlN PVD Coatings| 2011
- 440
-
Thermostablity Study on Microstructure and Microhardness of Laser Shock Processed Ti-6Al-2.5Mo-1.5Cr-0.5Fe-0.3Si| 2011
- 445
-
Design of Balance Control Mechanism of Nitriding Layer Depth in Ion Nitriding| 2011
- 450
-
Surface Modification on Polyurethane of Bio-Electrodes Implanted for Deep Brain| 2011
- 454
-
Simulation of Substrate Temperature Distribution in Diamond Films Growth on Silicon Wafer by Hot Filament CVD| 2011
- 458
-
Cutting Performances of Boron Doped Diamond-Coated Milling Tools in Machining Graphite| 2011
- 462
-
Fabrication and Application of Diamond Coated Micro Ball End Mills| 2011
- 466
-
Characterization of Ti-6.5Al-3.5Mo-1.5Zr-0.3Si Titanium Alloy by Laser Shock Peening| 2011
- 470
-
Prediction of Surface Parameters for Strain Hardening Material of Asperity Flattening in Metal Forming| 2011
- 474
-
Development of Micro-Alloying Ultra-Fine Grain High Strength Steel Produced by EAF-TSCR| 2011
- 479
-
Deforming Capability of Heat-Treated and Modified Al-40Si Alloy| 2011
- 483
-
Heat Treatment Technology for Al-40Si Alloy Modified by Sr Addition| 2011
- 487
-
Molecular Dynamics Simulation on the Tension Deformation of Carbon Nanotubes| 2011
- 491
-
Defect Detection Study of Fabric Based on Gabor Filter Algorithm| 2011
- 495
-
A Survey on Electrode Materials for Electrical Discharge Machining| 2011
- 503
-
Research and Application on Heterogeneous CAD Platforms of Modular Fixture System| 2011
- 508
-
Research on Design of Hydraulic Support Based on Virtual Prototype Technology| 2011
- 513
-
Dynamic Characteristic Analysis and Structural Modification of a 5-Axis Horizontal Machining Center Considering Joint Surface| 2011
- 517
-
A Method for Low Manufacturing Cost and High Assembly Quality| 2011
- 521
-
Quasi-Optimal Parameter Design of Five-Axis Tool Grinders Based on Taguchi Method| 2011
- 525
-
Research on Shape Detecting System of Cold Rolling Strip| 2011
- 529
-
Research on New Shape Meter of Cold Rolling Strip| 2011
- 533
-
On Medium Frequency Induction Heating Applied in the Energy-Saving Light Industrial Equipments and its Electromagnetic Radiation| 2011
- 537
-
Research on the Pulse Width Modulated Pneumatic Servo Systems with Long Transmission Lines| 2011
- 541
-
A Critical Chain Project Scheduling Problem with Multi-Mode| 2011
- 546
-
Digital Simulation on Fuzzy Control in the Speed-Varying Wire Feeding System of Welding| 2011
- 550
-
Research on the Layout and Process of the Beverage Packaging Line Using High Speed Robots| 2011
- 554
-
Study on Key Technologies of Aero-Engine AMRO Support System| 2011
- 560
-
Analysis of Physical Condition of Aero-Engines Based on Flight Data| 2011
- 566
-
Morphological Filtering Algorithm for Estimation of Tool Wear in CNC Milling Machining| 2011
- 570
-
Exploring the Steel Bar Logistics Value Chain in China| 2011
- 579
-
Thermal Performance Analysis Based on Micro-Channel Structure of Heat Sink| 2011
- 585
-
Numerical Analysis on Heat Transfer and Flow-Induced Vibration of an Elastic Supported Cylinder| 2011
- 590
-
Calculation of Maxwell Stress Tensor Using 3D FDTD for Trapping Force in Near-Field Optical Tweezers| 2011
- 596
-
Microstructure Design with Multiphase Materials under Mass Constraints| 2011
- 600
-
Aircraft Skin Stretch-Forming Die Light-Weight Design Using Topology Optimization| 2011
- 604
-
The Topology Optimization Design for the Stereolithography Based Investment Casting Pattern| 2011
- 608
-
Integrated Optimal Design of Complex Multi-Component System in Three-Dimension| 2011
- 614
-
Buckling Optimization of Perforated Curved Shells| 2011
- 618
-
Multi-Physic Modeling and Simulation Optimization of Hydraulic Support Tester Loading System| 2011
- 623
-
Optimal Design of Aero-Engine Stator Structure with Combined Shape and Topology Optimization Method| 2011
- 627
-
FEM Analysis of Large H-Beam in Rough Rolling Process| 2011
- 631
-
Topology Tailoring Method of TWB Autobody Parts Based on HyperWorks| 2011
- 636
-
The Application of AD Theory in the Study of Active Steering System| 2011
- 642
-
Explicit Dynamics Simulation Research on Soil Cutting of Shield Machine Based on LS-DYNA| 2011
- 646
-
Efficiency-Reinforcement Design Study for Elastomeric Hydraulic Reciprocating Seal Based on Function Analysis| 2011
- 650
-
The Module Partition Approach for the Personalized Products and Production| 2011
- 656
-
The Design and Optimization of Large-Scales Heavy Gantry NC Machining Center Based on Finite Element Method| 2011
- 661
-
Robust Design with Engineering Models Described by Implicit Mathematical Functions| 2011
- 665
-
Study of Steering Actuator of Static “Point-the-Bit” Rotary Steerable System| 2011
- 671
-
A Study of Machine Design Method Based on Technological Process| 2011
- 676
-
Dynamic Analysis on Crank-Slider Mechanism of Reciprocating Pump| 2011
- 681
-
Crashworthiness Analysis of Mobile Hard Disk under Different Drop Angles| 2011
- 686
-
Gyroscopic Torque Analysis and Dynamic Balance Test of the Vertical Aerostatic Spindle| 2011
- 692
-
Kinematics Modeling and Analysis of TBM Disc Cutter Based on D-H Matrix| 2011
- 697
-
Optimization Design of the Wind Turbine Gearbox Based on Genetic Algorithm Method| 2011
- 701
-
Dynamics of the Gear Train Set in Wind Turbine| 2011
- 706
-
The Efficiency Analysis on Cutting Power of EPB Shield Cutter| 2011
- 712
-
Finite Element Analysis of Crawler Frame of the Rotary Drill Bits| 2011
- 717
-
The Prediction of EPB Excavation Stability Based on Geological Data| 2011
- 721
-
Predict Stiffness of Hydraulic Press with Movable Eccentricity Loading Considering Uncertainty by Monte Carlo Simulation| 2011
- 726
-
Strength Analysis and Optimal Design of a Movable Power Station Package| 2011
- 730
-
Reliability Analysis on Friction-Pressurized Drilling Rod of Rotary Drilling Rig| 2011
- 736
-
Reliability Design of Car Suspension Coil Spring Based on Maximum Entropy Method| 2011
- 740
-
Finite Element Contact Analysis for Sprocket of an Armoured Face Conveyor| 2011
- 745
-
Analysis of the Emotional Factors in Design Process| 2011
- 750
-
Through the "Cottage" Prospects of Chinese Design| 2011
- 754
-
Chinese and Western Cultural Differences Embodied in Industrial Design| 2011
- 760
-
An Analysis on Contact Line Performance of Offset Cylindrical Worm Gearing| 2011
- 765
-
Study on a New Design Algorithm for Smooth Manufacture| 2011
- 769
-
Stability Analysis of a Processor Unit Served in Deep-Sea| 2011
- 774
-
Knowledge Representation Method of Product Design Based on Ontology| 2011
- 779
-
Empirical Models between User Requirements and Product Structural Variables: A Hydraulic Forging Press Case Study| 2011
- 785
-
An Object-Oriented Modular Design Model Supported by Integrated Multi-Domain Knowledge| 2011
- 790
-
The Explore of Synesthesia in Product Design in the Digital Age| 2011
- 795
-
Error Modelling for Master Slave Surgical Robot System| 2011
- 801
-
Characterization of a MEMS Accelerometer Considering Environmental Temperature Fluctuations| 2011
- 805
-
Achievement of Dynamic-Link Library for Image Segmentation Based on LabVIEW| 2011
- 809
-
Driver Design of the Piezoelectric Ultrasonic Transducer for Wire Bonding Based on Direct Digital Synthesis Technology| 2011
- 813
-
Design of a Direct-Drive XY Table System: Electromechanical and Dynamic Optimization| 2011
- 817
-
Research on Structural Design and Optimization of Artificial Optical Compound Eye| 2011
- 822
-
A Design of Parallel High Frequency Dynamometer Fixture| 2011
- 828
-
Influence of Alignment Errors on Measuring Nose Roundness of Diamond Cutting Tools with a Novel Method| 2011
- 834
-
Applications of Ultra-Precision Free-Form Machining Technology to Advanced Optics| 2011