The Management of Value (English)
- New search for: Dallas, Michael
- New search for: Dallas, Michael
In:
51st Annual Conference of SAVE International 2011
; 356-366
;
2011
-
ISBN:
- Conference paper / Print
-
Title:The Management of Value
-
Contributors:Dallas, Michael ( author )
-
Conference:Annual Conference of SAVE International ; 51. ; 2011 ; Portland, Or.
-
Published in:
-
Publisher:
- New search for: Curran Associates, Inc.
-
Place of publication:Red Hook, NY
-
Publication date:2011
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
- New search for: 50.00
- Further information on Basic classification
-
Keywords:
-
Classification:
BKL: 50.00 Technik allgemein: Allgemeines -
Source:
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Analysis on The System Interaction of VE in Public WorksSaito, Koji et al. | 2011
- 12
-
The Application of a Value Assurance System to Oil & Gas Development ProjectsMattu, Guido / Marini, Franca et al. | 2011
- 42
-
Behavioral Considerations for Improved Performance in Value AnalysisSole, Howard B. et al. | 2011
- 59
-
A Brave New World: Public-Private Partnerships, Design-Build Delivery, and Value EngineeringSloggy, John E. et al. | 2011
- 71
-
Build To Order, The Challenges and How VAVE Methodology Can Still Be Applied in Industries Where Design Is Heavily RestrictedVillegas, Oscar et al. | 2011
- 78
-
Developing a Value Management Approach at the Institutional and Organisational Levels for the Saudi Public SectorAlalshikh, Mohammed Auda / Male, Steven et al. | 2011
- 98
-
DFA Worker Allocation Improves Value of Lean Product DevelopmentRosales, Rogelio Guzman et al. | 2011
- 105
-
Diagnosis and Study of VE Development in KoreaSuh, Young-Joo / Kim, Yong-Su et al. | 2011
- 129
-
Effective VE Achievement that Utilizes Expert ChoiceShin, Chan-Ho et al. | 2011
- 157
-
Energy Simulation In Facility VE Studies – A Paradigm ShiftKwong, Benson et al. | 2011
- 172
-
Establishing Direction for Success In Manufacturing, Government and Construction Value StudiesCook, Thomas M. et al. | 2011
- 200
-
Event Planning Using Function AnalysisBraase, Lori / Grgich, Jodi et al. | 2011
- 210
-
The Function WheelRude, Jeff et al. | 2011
- 221
-
A Guide for Idea Generation and Creativity Using Function AnalysisBerawi, Mohammed Ali et al. | 2011
- 232
-
How Can TRIZ Improve the Outcome of a Value Engineering WorkshopGaikwad, Sanjay et al. | 2011
- 246
-
How Can Value Methodology Connect the Product and Technology Design at Different Firms of a Supply Chain?Nádasdi, Ferenc / Bokorné, Tünde Kitanics et al. | 2011
- 267
-
How DFV Process Can Improve Split AC Installation ProcessLopes, Cintia A. et al. | 2011
- 275
-
How to Streamline Your Activity Time Through the Functional ApproachYokota, Hisaya et al. | 2011
- 286
-
How VA Improved the Automation Strategy at the City of CalgaryRabbi, Mushtaq / Stafford, Don H. et al. | 2011
- 300
-
Improving the Performance of a Highway Construction Project Using a Systematic VM ApproachYu, Jingyu / Zhang, Cai-Jiang / Leung, Mei-Yung et al. | 2011
- 307
-
Integrated Project Risk ManagementMonica, Armand Della / Propen, Michael et al. | 2011
- 317
-
Leading Accelerated Projects™: Thinking Outside the BlocksRoberts, Lon et al. | 2011
- 344
-
Lean ConstructionRains, Jim et al. | 2011
- 356
-
The Management of ValueDallas, Michael et al. | 2011
- 367
-
A Method for Applying TRIZ to Enhance BrainstormingBorza, John S. et al. | 2011
- 390
-
More Efficient VE Workshops and Superior Results: The Advantages of a Streamlined Workshop and Early Change Effect AnalysisBurris, Brent / Sanchez, Miguel A. et al. | 2011
- 428
-
Pardon My French….VE Is All About the “F” WordAnwar, Sid et al. | 2011
- 439
-
Popularizing Value Engineering for Wider ApplicationsAggarwal, Pawan K. et al. | 2011
- 458
-
Revealing Hidden Economic Externalities In Major Projects with Value MethodologyMcPhillips, Munsell et al. | 2011
- 477
-
Risk Analysis & VE for CMAR ProjectsHoekstra, Renee L. et al. | 2011
- 489
-
“ROCKY ROAD” - No Match for VE TeamKnoles, Warren et al. | 2011
- 511
-
Role of Sponsorship in Capturing VE BenefitsOrlean, Robert et al. | 2011
- 521
-
A Streamlined Value Planning Process for Small Proscriptive Projects on a BudgetJohnson, Paul et al. | 2011
- 547
-
Typical Engineer Learning Styles and Their Implications for the VE WorkshopMyers, Gary R. et al. | 2011
- 556
-
Uncertainty Modeling in Multiple Dimensions for Value MethodologyStewart, Robert B. / Brink, Gregory et al. | 2011
- 574
-
Understanding the Advantages and Potential Pitfalls of Quantifying Performance MeasuresPrager, Robert et al. | 2011
- 596
-
Value Engineering - A Sure Step towards Product InnovationChandrashekar, R. / Rao, Raghavendra et al. | 2011
- 601
-
VE Introduction Plan and Future View of EnvironmentAhn, Choong-Heui / Jin, Sung-Ho et al. | 2011
- 617
-
Value Engineering the Construction of Bored Tunnels in Competent RockLaughton, Christopher et al. | 2011
- 632
-
The Value Management Approach in Germany: General Overview and Practical ExamplesPauwels, Marc / Meindl, Sebastian et al. | 2011