ID 237 MAE SUAI DAM SAFETY (English)
- New search for: Chidchob, Pronmongkol
- New search for: Chidchob, Pronmongkol
In:
Symposium Hydro Engineering
; 881-896
;
2018
-
ISBN:
- Conference paper / Electronic Resource
-
Title:ID 237 MAE SUAI DAM SAFETY
-
Contributors:Chidchob, Pronmongkol ( author )
-
Conference:ATCOLD Symposium Hydro Engineering ; 2018 ; Wien
-
Published in:Symposium Hydro Engineering ; 881-896
-
Publisher:
- New search for: Verlag der Technischen Universität Graz
-
Place of publication:Graz
-
Publication date:2018
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Electronic Resource
-
Language:English
-
Licence:
-
Source:
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
CAPITALIZATION OF BENCHMARK WORKSHOPS RESULTS SINCE BERGAMO 1991 (Extended Abstract)Mazzà, Guido et al. | 2018
- 2
-
50 YEARS OF COMMITTEE ON SEISMIC ASPECTS OF DAM DESIGN (Extended Abstract)Wieland, Martin et al. | 2018
- 3
-
NUMERICAL METHODS APPLIED AND INTERPRETED FOR SAFE DAM BEHAVIOR (Extended Abstract)Zenz, Gerald et al. | 2018
- 4
-
SEISMIC ASPECTS IN THE DESIGN OF EMBANKMENT AND ROCKFILL DAMS WITH SPECIAL EMPHASIS ON COMPUTATIONAL ASPECTS (Extended Abstract)Marulanda, Camilo et al. | 2018
- 5
-
COLLAPSE OF AN AGRICULTURAL EARTH-DAM BY RECENT EARTHQUAKE AND ITS RECONSTRUCTION (Extended Abstract)Tatsuoka, Fumio et al. | 2018
- 6
-
COMPARISON OF MEASURED AND ANALYZED SEISMIC BEHAVIOUR OF ARCH DAM, ROCKFILL DAM, AND GRAVITY DAM IN JAPAN (Extended Abstract)Sasaki, Takashi et al. | 2018
- 7
-
CURRENT CHALLENGES OF SEISMIC NUMERICAL MODELLING FOR SOME ITALIAN EXPERIENCES (Extended Abstract)Meghella, Massimo et al. | 2018
- 8
-
QUALIFICATION OF DYNAMIC ANALYSES OF DAMS AND THEIR EQUIPMENT - OUTCOME OF JCOLD-CBFR TECHNICAL EXCHANGE (Extended Abstract)Matsumoto, Norihisa / Fry, Jean-Jacques et al. | 2018
- 9
-
OBSERVATIONS OF PERFORMANCE OF EARTHFILL EMBANKMENTS DURING THE M6.6 LAKE GRASSMERE EARTHQUAKE IN 2017 AND THE M7.8 KAIKOURA EARTHQUAKE IN 2016 (Extended Abstract)Matuschka, Trevor et al. | 2018
- 10
-
LESSONS LEARNED FROM RECENT INTERNATIONAL WORKSHOPS ON SEISMIC NUMERICAL MODELLING FOR CONCRETE DAMS (Extended Abstract)Robbe, Emmanuel et al. | 2018
- 11
-
SEISMIC HAZARD ANALYSIS OF HARD-ROCK DAM SITES (Extended Abstract)Addo, Kofi O. et al. | 2018
- 12
-
WARNINGS AND THE HUMAN RESPONSENeedham, Jason et al. | 2018
- 13
-
SITUATION DEVELOPMENT, INCIDENT RESPONSE AND PUBLIC SAFETYGutierrez, David / Croyle, William et al. | 2018
- 14
-
FAST-TRACK RECOVERY DESIGN AND CONSTRUCTION TO ADDRESS CRITICAL DAM SAFETYHarder, Les et al. | 2018
- 15
-
ROLLER COMPACTED CONCRETE INFLUENCES ON RECOVERY STRUCTURAL DESIGN FEATURESRogers, Michael et al. | 2018
- 16
-
GEOLOGICAL AND GEOTECHNICAL INVESTIGATIONS FOR RECOVERY DESIGN FEATURESGray, Mike et al. | 2018
- 17
-
HYDROLOGIC AND HYDRAULIC ENGINEERING ACTIVITIES TO INFORM OPERATION AND DESIGNFortner, Mark et al. | 2018
- 19
-
ID 28 MODELLING THE UNCERTAINTY OF INFLOW TO SHORT-TERM RESERVOIR OPERATION USING FUNCTIONAL EXPANSION-BASED METHODChen, Duan / Hu, Bo et al. | 2018
- 20
-
ID 29 INCREASE EFFICIENCY OF VORTEX SETTLING BASIN IN IMBIBITION OF DAM'S RESERVOIR IN TIME OF FLOODWATERHajiahmadi, Amin / Saneie, Mojtaba / Moghaddam, Mehdi Azhdari et al. | 2018
- 21
-
ID 34 GROWING NEED FOR STORAGE AS AUSTRALIA TRANSITIONS FROM COAL ENERGY TO RENEWABLESHerweynen, Richard / West, Nick et al. | 2018
- 22
-
ID 41 CLIMATE EFFECT ASSESSMENT OF THREE GORGES PROJECTXing, Long et al. | 2018
- 23
-
ID 48 DETERMINATION OF CONTROL WATER LEVEL ON SUTAMI AND LAHOR RESERVOIR TO AVOID THE POSSIBILITY OCCURS OVERTOPPING DUE TO PROBABILITY MAXIMUM FLOODDewanto, Ulie Mospar / Marsudi, Arief Satria / Lufira, Rahmah Dara et al. | 2018
- 24
-
ID 74 IMPACT OF UPPER YANGTZE CASCADE RESERVOIRS OPERATION ON THREE GORGES RESERVOIR IN IMPOUNDMENT PERIODYulei, Gao / Hai, Wang et al. | 2018
- 25
-
ID 77 STUDY ON THE INFLUENCE OF CLIMATE CHANGE ON THE THREE GORGES RESERVOIR AND ITS COUNTERMEASURESFangfang, Wang / Zhengfeng, Bao et al. | 2018
- 26
-
ID 91 A CHANGING FLOW REGIME IN CENTRAL GERMANY: MAGNITUDES, CAUSES AND EFFECTS ON RESERVOIR MANAGEMENTMöller, Markus et al. | 2018
- 27
-
ID 94 STUDY ON RISK ANALYSIS FOR FLOOD PREVENTION AND DAM SAFETY BASED ON STOCHASTIC SIMULATION (Extended Abstract)Gao, Jie et al. | 2018
- 28
-
ID 95 EROSION AND SEDIMENTATION OF UPSTREAM ASAHAN AND ITS COUNTERMEASURES FOR THE SUSTAINABILITY OF SIRUAR DAM NORTH SUMATERA (Extended Abstract)Chakim, Muhammad Luckmanul / Sartono, Sugik Edi et al. | 2018
- 29
-
ID 107 EVALUATION OF SEDIMENT MANAGEMENT EFFECTIVENESS TO EXTEND THE WLINGI RESERVOIR LIFETIMEAlim, Zainal et al. | 2018
- 30
-
ID 109 EVALUATION AND MITIGATION OF THE BOGEL RIVER FLOODYhadhianto, Aris / Dewanto, Ulie Mospar et al. | 2018
- 31
-
ID 110 SETTING UP DREDGING AND SPOILBANK MANAGEMENT METHOD TO RECOVERY HYDROPOWER PRODUCTIVITY OF SENGGURUH DAMYhadhianto, Aris / Dewanto, Ulie Mospar et al. | 2018
- 32
-
ID 129 NUMERICAL SIMULATION AND EXPERIMENTAL RESEARCH ON REGULAR MECHANISM OF LOCAL CLIMATIC CHANGES AROUND GIANT HYDROPOWER RESERVOIRDeng, Yangbing / Xu, Jin / Chen, Xiaolong / Meng, Guanglin / Li, Mi et al. | 2018
- 33
-
ID 136 RUNOFF AND SEDIMENT TRANSPORTATION IN UPPER AND MIDDLE REACHES OF JINSHA RIVER (Extended Abstract)Xia, Yan / Yinjun, Zhou / Zhongwu, Jin et al. | 2018
- 34
-
ID 141 STUDY ON THE SEDIMENTATION CHANGES IN THE MANWAN RESERVOIR ON THE LANCANG RIVERBohui, Pang / Mengyang, Li / Ji, Lu / Hao, Chen et al. | 2018
- 35
-
ID 142 ANALYSIS OF KEY INFLUENCING FACTORS FOR THE EVOLUTION OF THE SAND BAR IN THE TRIBUTARIES IN THE XIAOLANGDI RESERVOIR AREAWang, Yuanjian / Jiang, Enhui et al. | 2018
- 36
-
ID 164 SEDIMENT MANAGEMENT STRATEGIES FOR HYDROPOWER RESERVOIR IN AGRICULTURAL AREA (Extended Abstract)Razad, Azwin Zailti Abdul / Muda, Rahsidi Sabri et al. | 2018
- 37
-
ID 167 OBSERVATION AND ESTIMATION METHOD OF SEDIMENT PRODUCTION IN KAMANASHIGAWA BASIN, FUJIKAWA RIVER SYSTEM - TOWARD AN ACCURATE ESTIMATION OF DAM SEDIMENT VOLUMETomita, Kunihiro / Ye, Zhengxing / Hikita, Takashi / Sumi, Tetsuya et al. | 2018
- 38
-
ID 175 EXPERIMENTAL DESIGN OF A TARGETED WATER RELEASE TO FLUSH SAND OUT OF THE BYPASSED REACH OF THE SELVES RIVERLoire, Rémi / Grospretre, Loic / Piégay, Hervé / Malavoi, Jean-René / Ortiz, Olivier et al. | 2018
- 39
-
ID 186 DAMS AND RESERVOIRS - CLIMATE CHANGE ADAPTATION STRATEGYLohr, Hubert / Froehlich, Felix / Herber, Marius / Richter, Sandra et al. | 2018
- 40
-
ID 195 APPLICATION OF WATER QUALITY INDEXES FOR QUALITY ASSESSMENT OF ZAYANDEHROOD DAM RESERVOIR (Extended Abstract)Sadeghi, Masoud Mirmohammad / Vahdatpour, Niaz / Basirpour, Ali / Mesmarian, Zahra / Roozegar, Seyed Reza / Sheklabadai, Zohreh / Shahmoradi, Morteza / Fatehizadeh, Ali / Ghasemian, Mohammad / Ebrahimi, Afshin et al. | 2018
- 41
-
ID 199 ON THE ESTIMATION OF SEDIMENTATION LEVEL IN IMHA DAM RESERVOIR, KOREA (Extended Abstract)Joo, Hongjun / Kim, Duckhwan / Kim, Hungsoo / Bae, Younghye / Kim, Jungwook et al. | 2018
- 42
-
ID 203 RESERVOIR OPERATION RULE OF HEPP POSO DAM, INDONESIAYuliningtyas, Cristina Dwi / Ardiansyah, Rahman Hakim et al. | 2018
- 43
-
ID 205 ROPES: RESERVOIR OPERATION SIMULATOR FOR ENVIRONMENTAL SUSTAINABILITYLohr, Hubert / Bach, Michael / Richter, Sandra / Froehlich, Felix / Baryla, Jedrzej et al. | 2018
- 44
-
ID 207 UNSTEADY STATE APPROACH FOR ESTIMATION OF RESERVOIR SEDIMENTATIONChavan, Balkrishna Shankar et al. | 2018
- 45
-
ID 211 FINDING BALANCE BETWEEN WATER CONSERVATION, SEDIMENTATION, AND ENERGY IN DAM MANAGEMENT OF SERAYU-BOGOWONTO RIVER BASIN TERRITORY CASE STUDY OF WADASLINTANG AND SEMPORAriyanti, Vicky / Rahayu, Kisworo et al. | 2018
- 46
-
ID 234 A STUDY ON THE VULNERABILITY RANKING USING HYDROLOGICAL SAFETY EVALUATION RESULT OF EXISTING DAMS CONSIDERING CLIMATE CHANGEPark, Jiyeon et al. | 2018
- 47
-
ID 236 EXPERIMENTAL STUDY ON BED EROSION DOWNSTREAM FROM A DAM (Extended Abstract)Li, Zhijing / Wang, Jun et al. | 2018
- 48
-
ID 241 STUDY ON MECHANISM OF RESERVOIR INDUCED SEISMICITY AND COUNTERPLOTS FOR RESERVOIR OPERATION UNDER EXTREME WEATHERZeng, Xinxiang / Chang, Tinggai / Hu, Xiao / Yang, Lei et al. | 2018
- 49
-
ID 243 IMPACT OF CLIMATE CHANGE ON THREE LARGE RESERVOIRS OPERATION IN CITARUM RIVER - INDONESIAMayasari, Reni / Suprayogi, Hari / Sungguh, Harry Muharsyah et al. | 2018
- 50
-
ID 263 DETERMINATION OF GERMI CHAY DAM RESERVOIR SEDIMENTATION PROCESS (Extended Abstract)Shahradfar, Simin / Azar, Shabnam Partovi / Adli, Sara Ahmadi et al. | 2018
- 51
-
ID 265 NUMERICAL SIMULATION OF THE MORPHDYNAMIC CHANGES BY SEDIMENT SUPPLY AT THE DOWNSTREAM OF YOUNGJU DAMJang, Chang-Lae / Kang, Ki-Ho / Jung, Kwansue et al. | 2018
- 52
-
ID 269 ASSESMENT OF OPERATIONAL PERFORMANCE AND RISKS CONSIDERING THE EFFECT OF CLIMATE CHANGE ON THE TIBETAN PLATEAUWenzel, Helmut / Yang, Jia-xiu / Lu, Ji / Theilen-Willige, Barbara et al. | 2018
- 53
-
ID 270 COUNTERMEASURE OF SEDIMENTATION PROBLEM ON WONOGIRI RESERVOIR, INDONESIASutadi, Graita / Diparindra, Yoga Darmawan / Mardjono, Airlangga / Restuti, Nisa Andan / Malindo, Duki et al. | 2018
- 54
-
ID 309 CLIMATE CHANGE IMPACT ON SURFACE WATER RESOURCES AND HYDROPOWER GENERATION IN THE DEZ DAM BASIN, IRANMousavi, Roya Sadat / Ahmadizadeh, Mojtaba / Marofi, Safar et al. | 2018
- 55
-
ID 317 SEDIMENT MANAGEMENT AT PATRIND HYDRO POWER PROJECT USING OHDS TECHNIQUEPark, Woncheol / An, Kiyong et al. | 2018
- 56
-
ID 324 ADVANTAGES OF DRY DAM AS FLOOD CONTROL IN JAKARTA'S URBAN AREAMardjono, Airlangga / Safari, Agus / Setiawan, Faris et al. | 2018
- 57
-
ID 345 GREEN DAM RESERVOIR: A NEXUS CONCEPT FOR SAFE OPERATION AND MAINTENANCE OF DAMS IN IRANYousefi, Saied / Kheirkhah, Naser / Rahbari, Mohamad et al. | 2018
- 58
-
ID 369 DAM SAFETY EMERGENCY RESPONSE PLAN : SHARING EXPERIENCE ON ENGAGEMENT WITH LOCAL AGENCIES FOR TNB HYDROPOWER DAM IN MALAYSIA (Extended Abstract)Lariyah, Mohd Sidek / Hidayah, Basri / Zailti, Abdul Razad Azwin / Sabri, Muda Rahsidi / Farazuien, Md Said Nur / Ruzaimei, Yalit Mohd / Jung, Kwansue et al. | 2018
- 59
-
ID 471 DEVELOPMENT AND ASSESSMENT OF DAM INFLOW DEFICIT INDEX FOR COPING WITH A DROUGHTKwon, Minsung / Jun, Kyung Soo et al. | 2018
- 60
-
ID 507 ADAPTED OPERATION OF TROPICAL GLACIAR RESERVOIRS DUE TO CLIMATE CHANGEArch, Alexander Roland / Hetterich, Anna / Romero, Eliana / Puchner, Georg et al. | 2018
- 61
-
ID 591 STUDY ON SOIL EROSION OF MAHAWELI RIVER UPPER BASIN UNDER CLIMATE CHANGE USING SWAT MODELDissanayake, D M Thushara Sanjeewa et al. | 2018
- 62
-
ID 625 A USEFUL TECHNOLOGY TO SOLVE OR MITIGATE ARTIFICIAL RESERVOIR SEDIMENTATIONGalante, Francesco / Masotti, Luca / Fornasari, Claudio et al. | 2018
- 63
-
ID 631 ASSESSMENT OF TEMPERATURE AND PRECIPITATION CHANGES TREND EFFECTS ON THE DAM INFLOWNoury, Mojtaba / Ezzati, Manijeh / Shaghaghi, Behrooz / Parhizi, Mohammadreza / Shokohi, Alireza / Jafari, Atabak et al. | 2018
- 64
-
ID 650 RAPID SCREENING OF SEDIMENT MANAGEMENT TECHNIQUES FOR MORAGOLLA HPP WITH RESCON-2Efthymiou, Nikolaos / Guimond, Richard / Trifkovic, Aleksandar / Miljanovic, Radovan / Bulathge, Nadun et al. | 2018
- 65
-
ID 671 SUSTAINABLE DEVELOPMENT IN HYDROPOWER PROJECTSoo, Min Byeong / Jin, Hong Young / Ullah, Nadim et al. | 2018
- 66
-
ID 719 DCNA - DISASTER COMPETENCE NETWORK AUSTRIAResch, Christian et al. | 2018
- 67
-
ID 17 PERMANENT SAFETY ASSESSMENT OF DAMS, LEVEES, RESERVOIRS, WATERWAYS WITH FIBER OPTIC DISTRIBUTED SENSINGBlin, Régis / Inaudi, Daniele et al. | 2018
- 68
-
ID 21 EXPERIMENTAL INVESTIGATION OF STEPPED SPILLWAY PERFORMANCE OF UPPER CISOKAN DAM IN INDONESIAZulfan, James / Slamet, Nuryanto Sasmito et al. | 2018
- 69
-
ID 22 REMOTE INSPECTION OF SMALL DAMS AND LEVEES (Extended Abstract)Sherwood, Bill et al. | 2018
- 70
-
ID 25 HOW TO DEAL WITH AGING PRESTRESSED ANCHORS IN DAMS: A NORTH AMERICAN PERSPECTIVEBruce, Donald A. / Wolfhope, John S. et al. | 2018
- 71
-
ID 36 DAM SAFETY MONITORING AND PRE-WARNING IN EXTRMELY CONDITIONSWang, Jun Shi / Wu, Xing Yun / Pang, Qiong / Gu, Chang Yan et al. | 2018
- 72
-
ID 111 GROUND VIBRATION CHARACTERISTICS INDUCED BY FLOOD DISCHARGE OF A HIGH DAM: AN EXPERIMENTAL INVESTIGATIONZhang, Yan / Zhang, Guoxin / Liu, Yi / Li, Songhui et al. | 2018
- 73
-
ID 119 EXPERIMENTAL STUDY ON THE GLOBAL STABILITY OF THE XIAOWAN ARCH DAM USING A 3D GEO-MECHANICAL MODEL TEST (Extended Abstract)Dong, Jian Hua / Zhang, Lin / Yang, Bao Quan / Chen, Jian Ye / Chen, Yuan et al. | 2018
- 74
-
ID 121 JUSTIFICATION FOR SELECTION OF A FACTOR OF SAFETY FOR DAMSKonow, Thomas / Strand, Mathias et al. | 2018
- 75
-
ID 124 DETERMINING ALIGNEMENT PATTERN OF TECHNOLOGY STRATEGY WITH POWER PLANTS DEVELOPMENT STRATEGY - CASE STUDY OF KARKHEH DAMBoromandfar, Hosseion / Salami, Reza / Manteghi, Manouchehr et al. | 2018
- 76
-
ID 131 A COMPARISON BETWEEN HYDROSTATIC-TIME-SEASON AND BAYESIAN DYNAMIC LINEAR MODELS FOR MONITORING BEHAVIOR OF DAMS (Extended Abstract)Gaudot, Ianis / Nguyen, Luong Ha / Miquel, Benjamin / Goulet, James A. et al. | 2018
- 77
-
ID 145 INCREASE CONCRETE QUALITY IN DAM CONSTRUCTION DURING DESIGN AND EXECUTION PHASEZitzenbacher, Andreas / Maffezzoli, Massimo / Scheuchelbauer, Stefan et al. | 2018
- 78
-
ID 146 VISUAL DOCUMENTATION AND INSPECTION OF DAM SURFACES USING STATE-OF-THE-ART TOTAL STATIONSKalenjuk, Slaven / Lienhart, Werner / Wackenreuther, Harald et al. | 2018
- 79
-
ID 158 PARAMETRIC STUDY IN GRAVITY DAMS ANALYZING THE INFLUENCE OF THE FLEXURAL, SHEAR AND ROTATION EFFECTSSilveira, Iarly Vanderlei da / Filho, Henrique Ataide Nerys de Castro / Ribeiro, Renan Rocha et al. | 2018
- 80
-
ID 162 TIME-SPACE COLLISION ANALYSIS AND ADJUSTMENT METHOD FOR HIGH ARCH DAM SURFACE CONSTRUCTIONHu, Chao / Zhao, Chunju / Zhou, Yihong / Song, Ling / Liu, Lian et al. | 2018
- 81
-
ID 172 EXTERNAL DEFORMATION MONITORING OF NINETEEN ROCKFILL DAMS USING SATELLITE SAR DATASato, Hiroyuki / Kondo, Masafumi / Kobori, Toshihide / Ishikawa, Ryotaro / Sasaki, Takashi / Sato, Wataru / Mushiake, Naruo / Sato, Takumi / Honda, Ken'ichi et al. | 2018
- 82
-
ID 181 BEHAVIOUR OF THE BACKFILLED RIGHT BANK OF THE MAVČIČE DAMŽvanut, Pavel / Brinšek, Rudi et al. | 2018
- 83
-
ID 189 AIR DEMAND OF BOTTOM OUTLETS: INSIGHTS FROM SCALE MODEL TESTS AND PROTOTYPE MEASUREMENTSHohermuth, Benjamin / Schmocker, Lukas / Boes, Robert Michael et al. | 2018
- 84
-
ID 215 TECHNICAL STAGE TO PLUG THE LARGE SIZE DIVERSION TUNNEL OF JATIGEDE DAM AT WEST JAVA, REPUBLIC OF INDONESIA, 2017 (Extended Abstract)Makmur, Anwar / Saefulloh, Dony Faturochman / Basuki, Tulus Heri / Rahmawati, Rosita Harimukti et al. | 2018
- 85
-
ID 217 AN INTEGRATED GEOPHYSICAL INVESTIGATION FOR THE EARTHEN DAM INSPECTION: ELECTRICAL RESISTIVITY IMAGING, MULTICHANNEL ANALYSIS OF SURFACE WAVE AND GROUND PENETRATING RADAR (Extended Abstract)Poomvises, Noppadol / Pakdeerod, Prateep / Kongsuk, Anchalee et al. | 2018
- 86
-
ID 223 HOW PROBABILISTIC APPROACH CAN IMPROVE CMD DESIGNINGSAyagh, Ahmad Ghezel / Mohammadian, Abbas et al. | 2018
- 87
-
ID 227 EFFECT OF DILATANCY ANGLE ON THE RELIABILITY ANALYSIS OF BEARING CAPACITY OF DAM FOUNDATION USING MONTE CARLO SIMULATIONMaadi, Mehraneh / Noorzad, Ali et al. | 2018
- 88
-
ID 230 SPILLWAY HYDRAULIC MODEL TEST OF CIPANUNDAN DAM, WEST JAVA, INDONESIAMardjono, Airlangga / Restuti, Nisa Andan / Mahardika, Harvien et al. | 2018
- 89
-
ID 237 MAE SUAI DAM SAFETYChidchob, Pronmongkol et al. | 2018
- 90
-
ID 247 SAFETY ASSESSMENT AND MAINTENANCE OF RELIABLE OPERATION OF DAMS IN RUSSIABellendir, Evgeniy / Filippova, Elena / Buryakov, Oleg et al. | 2018
- 91
-
ID 251 DAM DEFORMATION MONITORING MODEL AND FORECAST BASED ON PCA-RBF NEURAL NETWORKLin, Chaoning / Li, Tongchun / Chen, Siyu / Liu, Xiaoqing / Liang, Siling et al. | 2018
- 92
-
ID 254 SAFETY ASSESSMENT FOR LARGE RESERVOIR CONSTRUCTED FOR DOMESTIC WATER NEAR URBAN AREAS AND A CASE STUDYTosun, Hasan / Vatantosun, Turgut et al. | 2018
- 93
-
ID 257 LABORATORY STUDY OF THE EFFECT OF RECYCLED FILLERS FROM COKING AND IRON CONCENTRATE FACTORIES ON THE ROLLER COMPACTED CONCRETE PROPERTIES IN DAMS (RCC DAMS)Mahmoudi, Jaber / Yazdi, Faeze et al. | 2018
- 94
-
ID 261 OPERATION AND MAINTENANCE OF SABALAN DAM (Extended Abstract)Sadrekarimi, Jamshid / Shahradfar, Simin / Mihandoost, Atusa et al. | 2018
- 95
-
ID 271 RESEARCH OF RESERVOIR EMPTYING DESIGN OF HIGH DAMS IN CHINAChao, Liu / Quansheng, Zhao / Jianping, Zhou et al. | 2018
- 96
-
ID 275 VISUAL INSPECTION AND ASSESSMENT OF OPERATING DEVICES IN IR. H. DJUANDA DAM - INDONESIAMayasari, Reni / Sungguh, Harry Muharsyah / Nugraha, Budi et al. | 2018
- 97
-
ID 285 EVENT TREE CONCEPT FOR DESCRIBING THE RELIABILITY OF GATED WEIRS AND SPILLWAYSAufleger, Markus / Brinkmeier, Barbara et al. | 2018
- 98
-
ID 291 VEGETATION EFFECT ON RELIABILITY ANALYSIS OF SLOPE STABILITY USING MONTE-CARLO SIMULATIONVaezi, Iman / Saeidi, Hesam / Noorzad, Ali et al. | 2018
- 99
-
ID 296 PERMISSION PROCEDURES OF DAM CONSTRUCTION AND MANAGEMENT IN INDONESIAYuliningtyas, Cristina Dwi / Resdiatmoko, Lolo Wahyu / Suprayogi, Hari et al. | 2018
- 100
-
ID 304 INTERNAL EROSION RISKS IN RIGHT ABUTMENT OF AHMADBEIGLU STORAGE DAM IN IRANArezoo, Mohammadi / Asghar, Bemani Yazdi Ali et al. | 2018
- 101
-
ID 307 MAIN ECOLOGICAL RISKS FACING THE YANGTZE RIVER BASIN, EXISTING PROTECTIVE MEASURES AND THEIR EFFECTIVENESSDi, Zhu / Zhi, Yang et al. | 2018
- 102
-
ID 321 ANALYSIS AND INTERPRETATION OF THE BAIXO SABOR DAM BEHAVIOUR DURING THE FIRST FILLING OF THE RESERVOIRPiteira-Gomes, José / Batista, António Lopes / Silva-Matos, Domingos et al. | 2018
- 103
-
ID 331 SCOUR ESTIMATION FOR NAM THEUN 1 SPILLWAY PLUNGE POOLTakhtemina, F. / Bieri, M. P. / Zuend, Benno Karl / Martin, S. et al. | 2018
- 104
-
ID 337 A DEVELOPMENT OF HYDROLOGIC RISK ANALYSIS MODEL FOR SMALL RESERVOIRS BASED ON BAYESIAN NETWORK (Extended Abstract)Kim, Jin-Guk / Kwon, Hyun-Han / Choi, Byoung-Han et al. | 2018
- 105
-
ID 338 EXPERIMENTAL STUDY ON DIRECT SHEAR BETWEEN FRP - CONCRETE IN TERFACE BASED ON DICLei, Zhang / Dong, Lei / Cheng, Wu Ling / Yong, Yang et al. | 2018
- 106
-
ID 344 COMBINING NUMERICAL AND PHYSICAL MODELS FOR COST EFFECTIVE DESIGN OF IRREGULAR SPILLWAYSPersson, Jonas / Yang, James / Lier, Öyvind Espeseth / Eriksson, Martin J. / Nilsson, Carl-Oscar et al. | 2018
- 107
-
ID 347 THE BEHAVIOR OF THE SPILLWAY-STRUCTURE OF THE DJUANDA DAM JATILUHUR INDONESIA (Extended Abstract))Gunady, Budy / Sungguh, Harry Muharsyah / Rahmatunnisa, Mudiyati / Harsani, Diah Eka et al. | 2018
- 108
-
ID 352 PHYSICAL MODELLING OF THE JIRKOV DAM BELL-MOUTH SPILLWAYSvejkovský, Jan / Krupka, Martin et al. | 2018
- 109
-
ID 356 STRUCTURAL SAFETY CONTROL OF THE BAIXO SABOR DAM BASED ON AN AUTOMATED DATA ACQUISITION SYSTEMCunha, João Gomes / Mata, Juan / Losada, Gonzalo et al. | 2018
- 110
-
ID 372 SEISMIC HAZARD ANALYSIS FOR GAMBIRI DIVERSION DAMSoleymani, Samaneh / Mahdavian, Abbas / Bahrami, Hamid et al. | 2018
- 111
-
ID 373 IN-DEPTH SAFETY ASSESSMENT OF LARGE RUN-OF-RIVER HYDROPOWER PLANTS IN SWITZERLANDTeodori, Sven-Peter / Stahl, Helmut et al. | 2018
- 112
-
ID 381 ASPECTS CONCERNING AGEING OF EMBANKMENT DAMSHaselsteiner, Ronald et al. | 2018
- 114
-
ID 406 HYDRAULIC ANALYSIS OF TEMPORARY FLOOD HAZARD TO SUPPORT THE PLANNING OF THE CONSTRUCTION PHASES OF HYDROPOWER PLANTRak, Gašper / Steinman, Franci et al. | 2018
- 115
-
ID 409 THE APPLICATION OF MATURITY MATRIX IN DAMS SAFETY PROGRAM IN BENGAWAN SOLO RIVER BASIN ORGANIZATION (RBO), INDONESIASoemardijo, Agus Jatiwiryono / Suryono, Antonius et al. | 2018
- 116
-
ID 410 FULL WAVE BASED DAMAGE IDENTIFICATION IN DAMSAlalade, Muyiwa E. / Wuttke, Frank / Lahmer, Tom et al. | 2018
- 117
-
ID 414 SELF-PROTECTED UNDERWATER CONCRETE IN REHABILITATION OF HYDRAULIC STRUCTURESJin, Feng / Zhou, Hu / Li, Fengliang / Wan, Peng et al. | 2018
- 118
-
ID 416 VIBRATIONS IN LARGE DAMS. MONITORING AND MODELLINGOliveira, Sérgio / Alegre, André et al. | 2018
- 119
-
ID 422 COMBINED SEEPAGE AND SLOPE STABILITY ANALYSIS OF EARTH DAMSZeidan, Bakenaz A. / Shahien, M. / Elshemy, M. / Kirra, M. S. et al. | 2018
- 120
-
ID 423 IMPROVING MODIFIED ICOLD METHOD WITH LOSS OF LIFE INDEX FOR DAM SAFETY RISK ASSESMENT IN INDONESIA BY USING RASTER METHODHenrianto, Anto / Triweko, R. Wahyudi. et al. | 2018
- 121
-
ID 428 NEAR-FAULT SEISMIC VULNERABILITY OF GRAVITY DAMSYazdani, Yadollah / Alembagheri, Mohammad et al. | 2018
- 122
-
ID 430 EFFECTS OF FOUNDATION FLEXIBILITY ON THE FAILURE PROBABILITY OF KARUN IV ARCH CONCRETE DAM IN SEISMIC CONDITION (Extended Abstract)Miarnaeimi, Farid / Azizyan, Gholamreza / Rashki, Mohsen et al. | 2018
- 123
-
ID 436 UPGRADING THE PERFORMANCE OF POORLY COMPACTED EMBANKMENT DAM FOUNDED ON SOFT CLAY THROUGH ADAPTING SECANT AND STABILITY PILES SYSTEMElashaal, Ashraf Abdel-hay / Abdel-moteleb, Alaa Abdalla et al. | 2018
- 124
-
ID 437 PUBLIC SAFETY AROUND DAMS: SUTAMI DAM EXPERIENCEArdianto, Didik / Valiant, Raymond / Rianto, Alfan / Hidayat, Fahmi / Sianipar, Robert Purba M. et al. | 2018
- 125
-
ID 438 RISK BASED APPROACH AT THE DAM SAFETY ASSESSMENT DURING ITS RECONSTRUCTIONŘíha, Jaromír / Špano, Miroslav et al. | 2018
- 126
-
ID 446 MASTER PLAN FOR SAFETY OF MAJOR HYDRAULIC STRUCTURES IN EGYPTToubar, Khaled / Baztan, Pelayo / Salamh, Abeer et al. | 2018
- 127
-
ID 447 FORMAL INVESTIGATION OF LAHOR DAM, INDONESIA (Extended Abstract)Winari, Teguh / Windianita, Kamsiyah / Ardianto, Didik / Hidayat, Fahmi / Ruritan, Raymond Valiant et al. | 2018
- 128
-
ID 459 FLEXIBLE PROTECTION MEASURES FOR ADAPTATION WITH SEA - LEVEL RISE ON THE NILE DELTAHassan, Mohamed Ahmed Ali Mohamed / Elashaal, Ashraf Abdel-hay / Abdel-Motaleb, Mohamed et al. | 2018
- 129
-
ID 467 AN INTELLIGENT COOLING CONTROL METHOD AND SYSTEM FOR XILUODU ARCH DAM CONSTRUCTIONLin, Peng / Ning, Zeyu / Peng, Haoyang et al. | 2018
- 130
-
ID 468 KEY CONSTRUCTION TECHNOLOGY OF 300 M HIGH CORE WALL ROCK-FILL DAM (Extended Abstract)Jian, Wu Gao / Peng, Fan / Xing, Han et al. | 2018
- 131
-
ID 475 ON-LINE STRUCTURAL HEALTH MONITORING OF REHABILITATED DAMSGujral, Amod / Mehrotra, Prateek et al. | 2018
- 132
-
ID 476 THE OPERATIONAL AND MAINTENANCE OF KEULILING RESERVOIR AS FIRST DAM IN ACEH PROVINCE - INDONESIAJunira, Ardiana / Maksal, Saputra T. / Airlangga, Mardjono et al. | 2018
- 133
-
ID 481 AN ANALYSIS ON THE BEHAVIORS OF A DAM FOR THE EARTHQUAKE IN SOUTH KOREALee, Taegeun / Cho, Baegun / Kim, Gyeongjin / Yun, Taekang et al. | 2018
- 134
-
ID 484 DAM SAFETY REGULATION IN SOUTH AFRICA: 32 YEARS DOWN THE LINEHattingh, Louis C. / Segers, Ivor et al. | 2018
- 135
-
ID 486 BEHAVIOUR OF ASPHALT CONCRETE CORE EMBANKMENT DAMS (ACED) AND SHEAR ZONE DEVELOPMENTInnerhofer, Guntram / Tschernutter, Peter / Kainrath, Adrian et al. | 2018
- 136
-
ID 491 EJEKTOR POWER PLANT - VERTICAL KAPLANFritsch, Rudolf et al. | 2018
- 137
-
ID 494 FEATURES OF MONITORING TEMPERATURE OF AN RCC DAM DURING CONSTRUCTION BASED ON DATA MINING (Extended Abstract)Pan, Jianwen / Wang, Jinting et al. | 2018
- 138
-
ID 495 RUBBER DAM CONSTRUCTION WITH NAVIGATION LOCKSOberleitner, Paul / Fritsch, Rudolf et al. | 2018
- 139
-
ID 496 EVALUATION OF SLOPE STABILITY CONSIDERING EXISTENCE OF THE SPILLWAY CHANNEL TRENCH AT THE RIGHT AND LEFT ABUTMENTS OF GELEVARD DAMRahimi, Kayvan / Zad, Amir Ali et al. | 2018
- 140
-
ID 501 ANALYSIS ON THERMAL FIELD EVOLUTION OF WUDONGDE ARCH DAMPeng, HaoYang / Lin, Peng / Ning, Zeyu et al. | 2018
- 141
-
ID 503 OPERATION OF SMALL AGRICULTURAL DAMS IN BULGARIA - STATE-OFTHE- ARTNikolov, Bogdan R. / Kisliakov, Dimitar et al. | 2018
- 142
-
ID 504 COMPARISON OF SELECTED SOFTWARE FOR 3D FLOW MODELING AT THE DAM SPILLWAYHöll, Jan / Holinka, Matouš / Hodák, Jiří et al. | 2018
- 143
-
ID 506 INVESTIGATION OF THE PROBABILITY OF FAILURE OF A GRAVITY DAMGoldgruber, Markus et al. | 2018
- 144
-
ID 510 CHALLENGES OF DAMS CONTRUCTION AND MANAGEMENT IN INDONESIA (Extended Abstract)Hartanto, Tri et al. | 2018
- 145
-
ID 512 SEISMIC STABILITY ANALYSIS OF CONCRETE GRAVITY DAMZeidan, Bakenaz A. et al. | 2018
- 146
-
ID 513 3D BLOCK ERODIBILITY: REAL-TIME MONITORING IN AN UNLINED SPILLWAY CHANNELGeorge, Michael F. / Sitar, Nicholas et al. | 2018
- 147
-
ID 518 KEY NOTES ON QUALITY CONTROL OF ROLLER COMPACTED CONCRETE DAMSTorkamani, Hamed Mahdilou et al. | 2018
- 148
-
ID 545 AN EVALUATION SYSTEM OF HYDROPOWER SUSTAINABLE DEVELOPMENT (Extended Abstract)Liu, Chunna et al. | 2018
- 149
-
ID 556 DAM PROTECTION GATES, ARE WE SOFT ON RISK?Grubb, Kenneth Raymond / Digby, Russ / Jones, Paul et al. | 2018
- 150
-
ID 581 HYDRAULIC ASSESSMENT OF TUNNELSChavan, Balkrishna Shankar et al. | 2018
- 151
-
ID 608 OPERATIONAL MODES MONITORING FOR PREVENTION OF FAILURE OF DAMS WITHIN THE DESIGN ENVELOPEHartford, Des / Rigbey, R. J et al. | 2018
- 152
-
ID 618 STUDY ON THE HARMFUL IMPACT OF SLIT-TYPE ENERGY DISSIPATER WATER WINGSGuobing, Huang / Lan, Du / Wengang, Duan et al. | 2018
- 153
-
ID 621 SEISMIC ANALYSIS OF MIJARAN EARTH DAM AND OPTIMIZATION OF ITS PARAMETERS USING PSOAnisheh, Seyed Razi / Anisheh, Seyed Alireza et al. | 2018
- 154
-
ID 639 REFERENCE PRESSURE CELL, AN EFFECTIVE SOLUTION FOR A CHALLENGING MATTER OF DAM MONITORINGKarimi, Farzin / Glötzl, Joachim Schneider et al. | 2018
- 155
-
ID 679 THE APPLICATION OF PERFORMANCE ASSESSMENT OF EMBANKMENT DAM MODEL BY USING KNOWLEDGE-BASED SYSTEMJuliastuti, Juliastuti / Supardi, Widagdo / Soemardijo, Agus Jatiwiryono / Gunady, Budy et al. | 2018
- 156
-
ID 24 REMEDIAL GROUTING OF EXISTING EMBANKMENT DAM FOUNDATIONS: LESSONS LEARNED (AND IGNORED)Bruce, Donald A. / Dreese, Trent / Cockburn, Jim et al. | 2018
- 157
-
ID 26 SEEPAGE CUTOFFS FOR DAMS AND LEVEES: LESSONS LEARNED FROM 40 YEARS OF REMEDIAL CONSTRUCTIONBruce, Donald A. et al. | 2018
- 158
-
ID 31 THE SEEPAGE ANALYSIS OF THE EMBANKMENT DAMS OF A FLOOD RETENTION BASIN IN POLANDErsoy, Burcu / Haselsteiner, Ronald et al. | 2018
- 159
-
ID 32 GROUT CURTAIN PERFORMANCE PARTICULARITIES IN THE COMPLEX GEOLOGICAL CONDITIONS ENCOUNTERED AT GURA APELOR CLAY CORE ROCKFILL DAMPopovici, Adrian / Stematiu, Dan / Marchidanu, Eugeniu et al. | 2018
- 160
-
ID 54 MONITORING AND EVALUATION OF VARIED ANTI-SEEPAGE MEASURES IN DEEP GRAVEL FOUNDATION FOR AN EMBANKMENT DAM - A CASE STUDYWang, Jun Shi / Pang, Qiong / Huang, Bing Hai / Wang, Hong / Wu, Xing Yun et al. | 2018
- 161
-
ID 79 ASSESSMENT OF HYDRO TASMANIA'S CONCRETE DAMS AND IMPACT OF UPLIFTHerweynen, Richard / Griggs, Tim et al. | 2018
- 162
-
ID 97 RESEARCH AND APPLICATION OF NEW-TYPE MATERIAL IN WUDONGDE AND BAIHETAN 300 M ULTRA-HIGH ARCH DAM - KEY TECH OF CHARACTERISTICS AND APPLICATION ON LOW-HEAT CEMENT CONCRETEFan, Qixiang / Li, Wenwei / Li, Xinyu et al. | 2018
- 163
-
ID 98 REHABILITATION OF THE CENTER HILL EMBANKMENT DAM, TN, USA INCLUDING CONNECTING THE CONCRETE CUT-OFF WALL TO THE EXISTING CONCRETE DAMBanzhaf, Peter et al. | 2018
- 164
-
ID 151 REMEDIAL GROUTING FOR EMBANKMENT DAM CORE SEALING - 10 YEARS EXPERIENCESPark, Dong Soon S. / Lim, Hee-Dae et al. | 2018
- 165
-
ID 154 THE EFFECT OF THE GROUNDWATER FLOW VELOCITY AND SEDIMENT DISCHARGE ON INTERNAL EROSION OF RIVERSNoorbakhsh, Fereshteh / Tabatabai, Mahammad Reza Majdzadeh et al. | 2018
- 166
-
ID 201 DESIGN OF DEEP SOIL MIXING WALLS AND THEIR ADVANTAGES OVER CONVENTIONAL SEALING FOR EMBANKMENT DAMSKerres, Daniel / Haselsteiner, Ronald et al. | 2018
- 167
-
ID 216 FIGHTING CRITICAL UPLIFT AT ATATURK DAMGavard, Michel / Riemer, Wynfrith et al. | 2018
- 168
-
ID 249 WATER TIGHTENING OF RESERVOIR BED AND UPSTREAM FACE OF DAM IN PERSIAN GULF MARTYRS (CHITGAR) LAKE - A CASE STUDYEmam, Ali / Zolfagharian, Mahdi / Rashidi, Nima / Radman, Rouzbeh et al. | 2018
- 169
-
ID 252 EXPERIENCE ON GROUTING CURTAIN FOR MODERATE HEIGHTEMBANKMENT DAMS, TURKEYTosun, Hasan et al. | 2018
- 170
-
ID 274 STUDY ON THE LONG-TERM EFFECT OF INFILTRATION DEFORMATION ON THE DISTRIBUTION OF UPLIFT PRESSURE IN EARTH-ROCK JOINT AREA OF EARTH DAM (Extended Abstract)Mu, Zhiyong / Li, Tongchun / Niu, Zhiwei / Liu, Xiaoqing et al. | 2018
- 171
-
ID 284 ASSESSMENT OF WATER FLOW MEASUREMENT IN A ZONED DAM USING ARTIFICIAL NEURAL NETWORK MODELSSantos, Ricardo C. / Mata, Juan T. et al. | 2018
- 172
-
ID 288 APPLICATION OF GEOMEMBRANE AS THE UPSTREAM IMPERVIOUS LAYER OF KAHIR RCC DAMOmshi, M. Sadri / Jafarbegloo, Mohsen / Ghiassinezhad, Hossein / Mohammadian, Abbas et al. | 2018
- 173
-
ID 297 A STUDY ON CAUSE OF PERFORMANCE DEGRADATION OF SEEPAGE MEASURING FACILITY IN OLD DAMCha, Bumlin / Jang, Seongho / Choi, Junghun et al. | 2018
- 174
-
ID 298 LONG TERM BEHAVIOR AND PERFORMANCE OF CORE ZONE AGAINST UPLIFT DISTRIBUTION OF MAE NGAD SOMBOON CHON DAM, CHIANG MAI, THAILANDPedugsorn, Chatchai / Chuenuam, Kanokwan / Srisawat, Pearasynp / Krisanamitr, Supamitr et al. | 2018
- 175
-
ID 300 DAM AND FOUNDATION SEEPAGE CONTROL IMPROVEMENT BY CEMENTCHEMICAL GROUTING UNDER STORAGE CONDITION OF MAE THI DAM, LAMPHUN, THAILANDPedugsorn, Chatchai / Chuenuam, Kanokwan / Srisawat, Pearasynp / Krisanamitr, Supamitr et al. | 2018
- 176
-
ID 340 FOUNDATION TREATMENT CHALLENGES FOR EARTH ROCK-FILL DAMS, A CASE STUDY OF ISIMBA HYDRO POWER PROJECT, UGANDARugaba, Nicholas Agaba / Akita, Chad Silas / Arinaitwe, Isaac / Mutikanga, Harrison et al. | 2018
- 177
-
ID 342 THIRD REMEDIAL GROUTING CAMPAIGN FOR REINFORCEMENT OF IMPERVIOUS CURTAIN TYPE BATHTUB OF THE CAJON DAMGuillén, R. Flores / Peñalba, M. Flores / Valeriano, J. Andino / Zúniga, C. Iglesias et al. | 2018
- 178
-
ID 351 NECHRANICE DAM - LONG-TERM MONITORING OF SEALING PERFORMANCE AT THE LONGEST EARTH-FILL DAM IN CENTRAL EUROPEKrupka, Martin / Svejkovský, Jan et al. | 2018
- 179
-
ID 375 SEALING AND FOUNDATION ON A 70 M ALLUVIUM LAYER OF ARKUN DAMHaselsteiner, Ronald / Pamuk, Resul et al. | 2018
- 180
-
ID 404 FOUNDATION TREATMENT WITH CUT OFF WALL IN TUGU DAMSumiarsih, Ni Made / Mardjono, Airlangga / Restuti, Nisa Andan / Cahyadi, Ali et al. | 2018
- 181
-
ID 435 STRENGTHENING AND SEALING OF GOMAL ZAM RCC ARCH-GRAVITY DAM FOUNDATION IN PAKISTANSchnäcker, Eckhard / Du, Chongjiang et al. | 2018
- 182
-
ID 440 CASE HISTORIES OF TAILINGS DAMS WATERPROOFED WITH A BITUMINOUS GEOMEMBRANE (BGM)Breul, Bertrand / Moeglen, Jacques et al. | 2018
- 183
-
ID 452 SEALING PERFORMANCE OF SILVEH EMBANKMENT DAM CUTOFF WALL BASED ON INSTRUMENTATION MEASUREMENTSJafarzadeh, Fardin / Garakani, Amir Akbari / Maleki, Jafar / Banikheir, Mehrdad / Raeesi, Ramin et al. | 2018
- 184
-
ID 470 FOUNDING AND SEALING DAMS ON VERY WEAK FOUNDATIONSSaleira, Wesley Ethiyajeevan et al. | 2018
- 185
-
ID 493 RELIEF DRAINAGES AGAINST HYDRAULIC FAILURE DUE TO UNDERSEEPAGE OF DYKES AND DAMSBrandl, Heinz / Szabo, Marek et al. | 2018
- 186
-
ID 505 SELECTION OF GROUT CURTAIN IN SPATIAL PLANE BASED ON SET JOINTS AND DIRECTION OF GROUTING GALLERY (GLEVARD DAM, IRAN)Zad, Amir Ali / Rahimi, Kaivan / Nabizadeh, Ali et al. | 2018
- 187
-
ID 515 CASE STUDY: ITUANGO HYDROELECTRIC PROJECT-ADDRESSING GEOLOGICAL AND GEOTECNICAL ISSUES ON THE ROCKFILL-CLAY CORE DAM'S FOUNDATION DESIGNSierra-Bonilla, Maria Cecilia / Munera-Saldarriaga, Juan Esteban et al. | 2018
- 188
-
ID 563 COMPARATIVE STUDY ON FOUNDATION TREATMENT TECHNICAL STANDARDS OF HYDROPOWER ENGINEERING BETWEEN CHINA AND AMERICANYaoru, Liu / Haowen, Zhou / Shuai, Lv / Wenzhe, Tang et al. | 2018
- 189
-
ID 613 SEALING WORKS WITH MICROFINE CEMENT AND SYNTHETIC RESIN AT THE CATHALEEN'S FALL DAM, IRELANDKogler, Kurt / Hechenbichler, Johann / Gabriel, Patrick / Doherty, Harry et al. | 2018
- 190
-
ID 35 THE OPERATION AND MAINTENANCE EXPERIENCE OF INDONESIA´S 1ST UNDERGROUND DAM, CASE OF BRIBIN DAM IN KARST CAVE OF GUNUNGSEWU GEOPARK; INDONESIAN INSIGHTS ON THE GERMAN-INDONESIAN IWRM PROJECT (2010-2017)Ariyanti, Vicky / Fibriyantoro, Ernowo Ary / Rahadiansyah, Shakti et al. | 2018
- 191
-
ID 56 HYDRAULIC DESIGN OF DIVERSION-CUM-DEPLETION TUNNELChavan, Balkrishna Shankar et al. | 2018
- 192
-
ID 113 RESEARCH ON CONTROL MEASURES OF LIMNOPERNA FORTUNEI IN PUMPED STORAGE POWER STATION WATER DELIVERY SYSTEMSheng, Wan / Xueshan, Liu et al. | 2018
- 193
-
ID 148 BEHAVIOR ANALYSIS OF THE UNDERGROUND POWERHOUSE BASED ON PRECISE DISPLACEMENT MEASUREMENTKashiwayanagi, Masayuki / Maeda, Keisuke / Shimizu, Norikazu et al. | 2018
- 194
-
ID 178 MODELING TURBULENCE PHENOMENA AND WAVE PROPAGATION IN AYANUNGA HEPP FOREBAY AND ADDUCTION SYSTEM, THROUGH IBER-2D AND ANSYS-3DCapillera, Stefano / Flores, Marc Gil / Macchi, Luca et al. | 2018
- 195
-
ID 179 COMPLEX HYDROGEOLOGICAL RESPONSES DEFY CONSERVATIVE DESIGN OF A PRESSURE TUNNEL - FAILURE OF THE BESAI HEADRACE TUNNELBenson, Richard / Riemer, Wynfrith / Iijima, M. et al. | 2018
- 196
-
ID 260 ESTIMATION OF EQUIVALENT PERMEABILITY OF ROCK MASS USING BACK ANALYSIS AND DFN MODEL- CASE STUDYbandpey, Abbas Kamali / Alianvari, Ali / Tani, Mohammed El / Negintaji, Khosru / Gholami, Mohammad Ali et al. | 2018
- 197
-
ID 272 OBERVERMUNTWERK II: NUMERICAL MODELING AND DESIGNDich, Christopher / Tschuchnigg, Franz et al. | 2018
- 198
-
ID 299 CONSTRUCTION AND MONITORING OF POWER HOUSE CAVERNS IN CIRATA HIDRO POWER INDONESIAAirlangga, Pangestu Dwipa et al. | 2018
- 199
-
ID 302 LINING CONCEPT TO CONTROL HYDROFRACTURING OF THE POWER WATERWAY OF HPP QUITARACSA IN PERURiemer, Wynfrith / Thiel, Michael / Schmidt, Roland et al. | 2018
- 200
-
ID 349 IN-SITU TESTING AND MONITORING OF TUNNELS AND CAVERNS AT A PUMPED-STORAGE POWER PLANT IN THE SWISS ALPSHubrig, Marcel / Kern, Andreas / Rösli, Ursula / Becker, Hans-Jakob / Trick, Thomas et al. | 2018
- 201
-
ID 363 SIPHON INTAKE AS SHPP INTAKE & WATER WAY, A SOLUTION DESIGN FOR SECURING THE LEFT BANK OF WLINGI DAM IN BLITAR, INDONESIADewanto, Ulie Mospar / Ariefianto, Gede Nugroho / Pramadya, Bayu / Sakti, Kurniawan et al. | 2018
- 202
-
ID 389 MODIFYING METHOD FOR VORTEX FLOW IN TRIFURCATION IN HYDROPOWER PLANTLee, Yeonju / Khan, Waqar Ahmad / Kha, Junaid et al. | 2018
- 203
-
ID 393 HOLLOW CONE VALVE (HCV) IR. H. DJUANDA DAM AND MURI INDONESIA RECORDPrawirakusuma, Angga / Mulyono, Joko / Kubontubuh, Dwi Aryani Semadhi et al. | 2018
- 204
-
ID 403 THE GROUTABILITY INVESTIGATION OF PUMICE PACKED BEHIND TUNNEL LINING SYSTEMDeravi, Ghasem / Vahedi, Ali Akbar / Hafezquran, Amir et al. | 2018
- 205
-
ID 412 STATUS AND FUTURE PROSPECTS OF RENEWABLE ENERGY IN SUBSAHARAN AFRICAAdu, Daniel / Zhang, Jinfeng / Jing, Gao / Suoming, Lv et al. | 2018
- 206
-
ID 427 "THEORY OF EVERYBIM" - WORKFLOW OPTIMIZATION - HYDROPOWER NORWAYBugge, Kristoffer Spendrup et al. | 2018
- 207
-
ID 449 HIGH PERFORMANCE PRESSURE TUNNEL EXCAVATION AND LININGVigl, Alois / Barwart, Christian et al. | 2018
- 208
-
ID 458 GEOMEMBRANES IN HIGH-PRESSURE TUNNELS AND SHAFTSRio, David A. del / Scarella, Marco / Vaschetti, Gabriella et al. | 2018
- 209
-
ID 500 INCREASING POWER OUTPUT AND FLEXIBILITY OF EXISTING HIGH HEAD POWER PLANTS WITH THE HELP OF WATERHAMMER SIMULATIONSHöller, Stefan / Jaberg, Helmut et al. | 2018
- 210
-
ID 509 IMPROVEMENT OF INTAKE STRUCTURES WITH NUMERICAL SIMULATIONBenigni, Helmut / Schiffer, Jürgen / Höller, Stefan / Jaberg, Helmut et al. | 2018
- 211
-
ID 549 THE IMPACTS OF THE DIFFERENCES BETWEEN CHINESE AND FOREIGN TECHNICAL STANDARDS ON DEVELOPING INTERNATIONAL HYDROPOWER PROJECTSYou, Richun / Tang, Wenzhe / Zhang, Qingzhen et al. | 2018
- 212
-
ID 559 TWO YEAR OF PERFORMANCE OF A PENSTOCK ANCHORED BY PUFOAMSvalesen, Tor Oxhovd / Lia, Leif / Aaker, Stian Løbø / Johnsen, N. / Kullberg, Mattias / Harris, Guy et al. | 2018
- 213
-
ID 569 DESIGN OF AERATOR FOR ORIFICE SPILLWAYChavan, Balkrishna Shankar et al. | 2018
- 214
-
ID 20 STRAIN MEASUREMENTS AND AXIAL FORCE PREDICTIONS AT THE END OF A STEEL LINED PRESSURE TUNNELHammer, Andreas / Bonapace, Paul / Unterweger, Harald / Ecker, Alexander et al. | 2018
- 215
-
ID 23 END OF STEEL LINED PRESSURE TUNNELS - LOAD TRANSFER OF LONGITUDINAL PIPE FORCESUnterweger, Harald / Ecker, Alexander / Hammer, Andreas / Bonapace, Paul et al. | 2018
- 216
-
ID 33 THRUST RINGS FOR TRANSFERRING LONGITUDINAL PIPE FORCES - DEVELOPMENT OF A DESIGN MODELEcker, Alexander / Unterweger, Harald et al. | 2018
- 217
-
ID 193 A CASE STUDY OF A HIGH STRENGTH STEEL DESIGN: APPLICATION OF DIFFERENT SAFETY CONCEPTS AND THE RESULTING IMPACTS ON A BIFURCATIONPollak-Reibenwein, Claudia / Neugschwandtner, Bettina et al. | 2018
- 218
-
ID 279 DESIGN OF STEEL LININGS OF PRESSURE SHAFTS MADE OF HS-STEEL - ULTIMATE LIMIT STATE AND CYCLIC LOAD CONDITIONSGreiner, Richard / Innerhofer, Guntram sen. / Innerhofer, Guntram jun. et al. | 2018
- 219
-
ID 426 ADVANCED DESIGN OF HIGH STRENGTH STEEL-LINED PRESSURE SHAFTS ACCOUNTING FOR FATIGUE CRACK GROWTHPachoud, Alexandre Jean / Manso, Pedro A. / Schleiss, Anton J. et al. | 2018
- 220
-
ID 543 EFFECT OF RTE TREATMENT ON TOUGHNESS OF HSS WELD METAL (Extended Abstract)Cerjak, Horst-Hannes / Caliskanoglug, Ozan / Enzinger, Norbert / Figner, Gunter / Pudar, Milan et al. | 2018
- 221
-
T4.1- 8 ID 548 INFLUENCE OF PIPE FA BRI CATION QUALITY ON LIFETI ME OF PENSTOCKS OF PUMPING STORA GE POWER PLANTSBuzzi, Christian / Cerjak, Ho rst-Han nes et al. | 2018
- 222
-
ID 548 INFLUENCE OF PIPE FABRICATION QUALITY ON LIFETIME OF PENSTOCKS OF PUMPING STORAGE POWER PLANTSBuzzi, Christian / Cerjak, Horst-Hannes / Moser, Christian et al. | 2018
- 223
-
ID 57 SEISMOTECTONIC FEATURES AT RUDBAR LORESTAN DAM SITE IN IRAN AND OBSERVATION OF SLOPE STABILITY DURING IMPOUNDMENT OF THE RESERVOIRWieland, Martin / Hajilari, Mohammad et al. | 2018
- 224
-
ID 75 EVOLUTION OF STABILITY OF THE VERNAGO RESERVOIR SLOPES UNDER WATER LEVEL VARIATION, DURING SIXTY YEARS OF OPERATIONSFederico, Francesco / Maestri, Marina / Cesali, Chiara / Cacciotti, Martina et al. | 2018
- 225
-
ID 138 RESEARCH ON STABILITY OF RESERVOIR ACCUMULATIVE BODY SLOPE AND THE IMPACT OF WATER STORAGELu, Ji / Zhan, Zheng-gang / Wu, Meng-Xi / Chen, Hong-Jie et al. | 2018
- 226
-
ID 153 DAM UPGRADES USING MECHANICALLY STABILIZED EARTHSankey, John E. / Power, Gary et al. | 2018
- 227
-
ID 180 STUDY OF RESERVOIR RIM SLOPE STABILITY DUE TO OPERATION OF SUSU DAM (Extended Abstract)Mamat, Ahmad Fadhli / Muda, Rahsidi Sabri / Ahmed, Jimjali / Taha, Mohd Raihan / Rahim, Mohd Syazwan MD et al. | 2018
- 228
-
ID 192 MONITORING THE SLOPE STABILITY OF RESERVOIRS: AN UPDATE ON THE OBSERVATIONAL METHOD. THE CASE OF A DAM IN PORTUGAL (Extended Abstract)Fornós, Josep Raventós / Couso, Carles / Garcia, Maite / Plasencia, Nadir / Almeida, Elisa et al. | 2018
- 229
-
ID 202 COUNTERWEIGHT AS JATIGEDE DAM LANDSLIDE STABILITY COUNTERMEASUREYuliningtyas, Cristina Dwi / Kubontubuh, Dwi Aryani Semadhi / Muldianto, Harya / Radityo, Permadi et al. | 2018
- 230
-
ID 231 EVALUATION OF SEISMIC PERFORMANCE OF EARTH DAMS DUE TO THE LEVEL OF ITS RESERVOIR USING FINITE ELEMENT METHODDidari, Amin / Saddagh, Mohammad Hassan / Ghadampour, Zahra et al. | 2018
- 231
-
ID 244 THREE LARGE RESERVOIRS OPERATION IN THE CASCADE SYSTEM CITARUM RIVER - INDONESIASuprayogi, Hari / Sungguh, Harry Muharsyah / Mayasari, Reni et al. | 2018
- 232
-
ID 248 ANALYSIS THE EFFECT OF SOIL PERMEABILITY OF THE UPSTREAM SHELL ON THE DAM STABILITY UNDER RAPID DRAWDOWN (BRADON DAM)Fouiti, Fatima Sharif et al. | 2018
- 233
-
ID 250 EARTH DAMS SAFETY UNDER SEISMIC MOTION USING LIMIT EQUILIBRIUM METHOD AND PHYSICAL MODELINGGordan, Behrouz / Adnan, Azlan Bin / Karbasi, Ahmad / Naserolmeamar, Alireza / Jafarirad, Sina et al. | 2018
- 234
-
ID 268 FLOOD WAVE ANALYSIS OF EMBANKMENT DAM FAILURE BY USING 2D MODELSDünkner, René / Berger, Michael et al. | 2018
- 235
-
ID 311 RISK MANAGEMENT FOR THE LAGO BIANCO RESERVOIR IN CASE THE CAMBRENA GLACIER RUPTURESMaier, Johannes / Beckstein, Alexandra / Darbre, Georges R. et al. | 2018
- 236
-
ID 326 SERVER DESIGN STANDARDS OF RESERVOIR FAILURE ALERT SYSTEMLee, Baeg / Choi, Byoung-Han et al. | 2018
- 237
-
ID 330 SLOPE MONITORING BY DISTRIBUTED FIBER OPTIC SENSING: PROJECT EXAMPLES, RESULTS AND LIMITATIONSIten, Michael / Fischli, Frank et al. | 2018
- 238
-
ID 333 INSAR & PHOTOMONITORING FOR DAMS AND RESERVOIR SLOPES HEALTH & SAFETY MONITORINGAntonielli, Benedetta / Caporossi, Paolo / Mazzanti, Paolo / Moretto, Serena / Rocca, Alfredo et al. | 2018
- 239
-
ID 365 SLOPE STABILITY ANALYSIS IN GAMBIRI DIVERSION DAM USING NUMERICAL MODELSSoleymani, Samaneh / Hemmati, Afshin / Bahrami, Hamid et al. | 2018
- 240
-
ID 376 A METHODOLOGY FOR THE MAPPING OF TERRAIN MORPHOLOGY OF DAM BASINS BY MEANS OF SPACEBORNE SAR IMAGES (Extended Abstracts))Nico, Giovanni / Catalao, Joao / Pitullo, Alfredo / Valente, Catarina et al. | 2018
- 241
-
ID 377 MODELLING EARTH-FILLED DAMS: MERGING GBSAR AND TRADITIONAL MEASUREMENTSNico, Giovanni / Corsetti, Marco / Pitullo, Alfredo / Pasquale, Andrea Di et al. | 2018
- 242
-
ID 395 CRITICAL REVIEW OF DAM BREACH PARAMETERS (Extended Abstract)Soliman, Ahmed Hussein / Bekhit, Hesham Mohamed / Zawahry, Alaa Mohamed El- et al. | 2018
- 243
-
ID 425 SLOPES STABILITY IN THE CATCHMENT AREAS AND EFFECT OF LARGESCALE ROCKSLIDE DAMMING ON HYDRAULIC PROJECTS SAFETY BY EXAMPLE OF CATCHMENT AREAS OF VAKHSH AND SIANG RIVERSShakirov, Ruslan / Shilina, Ekaterina / Strom, Alexander / Zhirkevich, Anatoly et al. | 2018
- 244
-
ID 443 INFLUENCES OF WATER LEVEL CHANGES ON THE BEHAVIOUR OF A SLOW MOVING LANDSLIDEAusweger, Georg Michael / Schweiger, Helmut F. / Marte, Roman et al. | 2018
- 245
-
ID 469 ESTIMATION OF LANDSLIDE INDUCED IMPULSE WAVE IN A CHANNEL TYPE RESERVOIR (Extended Abstracts)Liu, Qingquan / An, Yi / Yang, Jiaxiu / Lu, Ji et al. | 2018
- 246
-
ID 492 FAILURE OF EMBANKMENT DAMS DUE TO OVERTOPPING- EXPERIMENTAL STUDY AND HYDROGRAPH PREDICTIONRüdisser, Burkhard / Tschernutter, Peter et al. | 2018
- 247
-
ID 508 A RESERVOIR SYSTEM SIMULATION METHOD TO LESSEN WATER SUPPLY DEFICIT AT DOWNSTREAM POINTS USING A HEURISTIC METHODLee, Sangho / Jin, Youngkyu et al. | 2018
- 248
-
ID 516 LANDSLIDE DAMS - LONG KNOWN, BUT JET OVERLOOKED, RARE PHENOMENON: POSSIBILITY TO PREVENT DAMAGE (Extended Abstract)Humar, Nina / Brilly, Mitja / Kryžanowski, Andrej et al. | 2018
- 249
-
ID 536 GEOLOGY AND GEOTECHNICAL CONDITION FROM GEOLOGICAL MAPPING, CORE DRILLING, AND SEISMIC METHOD AT MASANG II HYDROPOWER PROJECT, WEST SUMATERA, INDONESIABasuki, Jodi Prakoso / Nulhakim, Kiki Lukman et al. | 2018
- 250
-
ID 612 NUMERICAL MODELLING OF ROCK-FALL ON THE CONCRETE ARCHGRAVITY DAM OF PLACE MOULINMazzà, Guido / Frigerio, Antonella et al. | 2018
- 251
-
ID 617 EXPERIMENTAL STUDY ON OVERTOPPING BREACHING PROCESS OF EARTH DAM AND PEAK DISCHARGEWengang, Duan / Guobing, Huang / LiLi et al. | 2018
- 252
-
ID 678 SETTLEMENT OF SOFT ROCKFILL MATERIALS IN MEDIUM-SCALE OEDOMETERPanah, Ali Komak / Rahmani, Hamidreza et al. | 2018
- 113
-
ID 382 PUBLIC SAFETY AROUND DAMS IN BRANTAS RIVER BASIN, INDONESIAWindianita, Kamsiyah / Ardianto, Didik / Hidayat, Fahmi / Ruritan, Raymond Valiant / Rianto, Alfan / Retnadi, Henda Tri et al. | 2018