4D-Based Workspace Conflict Detection in Prefabricated Building Constructions (Unknown)
- New search for: Ma, Hui
- New search for: Zhang, Hongbin
- New search for: Chang, Peng
- New search for: Ma, Hui
- New search for: Zhang, Hongbin
- New search for: Chang, Peng
In:
Journal of Construction Engineering and Management
;
146
, 9
;
2020
- Article (Journal) / Electronic Resource
-
Title:4D-Based Workspace Conflict Detection in Prefabricated Building Constructions
-
Contributors:
-
Published in:
-
Publisher:
- New search for: American Society of Civil Engineers
-
Publication date:2020-07-02
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:Unknown
-
Source:
Table of contents – Volume 146, Issue 9
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
-
Attaining Successful Construction Project Execution Through Personnel and CommunicationTownsend, Ryan / Gershon, Mark et al. | 2020
-
Interorganizational Diffusion of Prefabricated Construction Technology: Two-Stage Evolution FrameworkDou, Yudan / Xue, Xiaolong / Wu, Changzhi / Luo, Xiaowei / Wang, Yuna et al. | 2020
-
Developing a Hierarchical Road Layout Method for Large-Scale Construction SiteChen, Tian / Hu, Hao / Zhu, Fengfeng et al. | 2020
-
Simulation-Based Lift Planning Model for the Lift Transfer Operation SystemKim, Taehoon / Lee, Dongmin / Cha, Minsu / Lim, Hyunsu / Lee, Myungdo / Cho, Hunhee / Kang, Kyung-In et al. | 2020
-
Stochastic-Based Model for Setting Formwork-Productivity BaselineGurmu, Argaw Tarekegn / Ongkowijoyo, Citra S. et al. | 2020
-
Revisiting Project Delivery System Performance from 1998 to 2018Franz, Bryan / Molenaar, Keith R. / Roberts, Bradley A. M. et al. | 2020
-
Detection of Railway Masts in Airborne LiDAR DataAriyachandra, M. R. M. F. / Brilakis, Ioannis et al. | 2020
-
Reducing Damages to Underground Utilities: Importance of Stakeholders’ BehaviorsAl-Bayati, Ahmed Jalil / Panzer, Louis et al. | 2020
-
Effect of Nighttime Construction on Quality of Asphalt PavingOgunrinde, Olugbenro / Amirkhanian, Armen / Corley, Mary / Nnaji, Chukwuma et al. | 2020
-
4D-Based Workspace Conflict Detection in Prefabricated Building ConstructionsMa, Hui / Zhang, Hongbin / Chang, Peng et al. | 2020
-
Forecasting Accuracy of In-Progress Activity Duration and Cost EstimatesBallesteros-Pérez, Pablo / Sanz-Ablanedo, Enoc / Cerezo-Narváez, Alberto / Lucko, Gunnar / Pastor-Fernández, Andrés / Otero-Mateo, Manuel / Contreras-Samper, Juan Pablo et al. | 2020
-
Comparison of Worker Safety Risks between Onsite and Offsite Construction Methods: A Site Management PerspectiveAhn, Seungjun / Crouch, Luke / Kim, Tae Wan / Rameezdeen, Raufdeen et al. | 2020
-
Rework in Construction: A Focus on Error and ViolationLove, Peter E. D. / Matthews, Jane / Fang, Weili et al. | 2020
-
Dynamic Network Analysis of Stakeholder Conflicts in Megaprojects: Sixteen-Year Case of Hong Kong-Zhuhai-Macao BridgeXue, Jin / Shen, Geoffrey Qiping / Yang, Rebecca Jing / Zafar, Irfan / Ekanayake, E. M. A. C. et al. | 2020
-
Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of InsightsNeve, Hasse H. / Wandahl, Søren / Lindhard, Søren / Teizer, Jochen / Lerche, Jon et al. | 2020
-
Cost Performance Comparison of Design-Build and Design-Bid-Build for Building and Civil Projects Using Mediation AnalysisMoon, Hyosoo / Kim, Kwonhyun / Lee, Hyun-Soo / Park, Moonseo / Williams, Trefor P. / Son, Bosik / Chun, Jae-Youl et al. | 2020
-
Hazard Recognition and Risk Perception Skills among Union ElectriciansJazayeri, Elyas / Dadi, Gabriel B. et al. | 2020
-
Rework Causation that Undermines Safety Performance during Production in ConstructionYap, Jeffrey Boon Hui / Rou Chong, Jia / Skitmore, Martin / Lee, Wah Peng et al. | 2020
-
Defect Risk Assessment Using a Hybrid Machine Learning MethodFan, Ching-Lung et al. | 2020
-
Leadership Competencies for Construction Professionals as Identified by Construction Industry ExecutivesSimmons, Denise R. / McCall, Cassandra / Clegorne, Nicholas A. et al. | 2020
-
Examining the Effect of Material Management Issues on the Schedule and Cost Performance of Construction Projects Based on a Structural Equation Model: Survey of Indian ExperiencesKar, Santu / Jha, Kumar Neeraj et al. | 2020
-
Process-Oriented Framework to Improve Modular and Offsite Construction Manufacturing PerformanceZhang, Youyi / Lei, Zhen / Han, SangHyeok / Bouferguene, Ahmed / Al-Hussein, Mohamed et al. | 2020