Software maintenance project delays prediction using Bayesian Networks (English)
- New search for: de Melo, Ana C.V.
- New search for: Sanchez, Adilson J.
- New search for: de Melo, Ana C.V.
- New search for: Sanchez, Adilson J.
In:
Expert Systems with Applications
;
34
, 2
;
908-919
;
2006
-
ISSN:
- Article (Journal) / Electronic Resource
-
Title:Software maintenance project delays prediction using Bayesian Networks
-
Contributors:de Melo, Ana C.V. ( author ) / Sanchez, Adilson J. ( author )
-
Published in:Expert Systems with Applications ; 34, 2 ; 908-919
-
Publisher:
- New search for: Elsevier Ltd
-
Publication date:2006-01-01
-
Size:12 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 34, Issue 2
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 805
-
Publishers note| 2007
- 806
-
The exploration of consumers’ behavior in choosing hospital by the application of neural networkLee, Wan-I / Shih, Bih-Yaw / Chung, Yi-Shun et al. | 2006
- 817
-
A hybrid knowledge and model approach for reviewer assignmentSun, Yong-Hong / Ma, Jian / Fan, Zhi-Ping / Wang, Jun et al. | 2006
- 825
-
Comparison of classification accuracy using Cohen’s Weighted KappaBen-David, Arie et al. | 2006
- 833
-
Dynamic EMCUD for knowledge acquisitionLin, Shun-Chieh / Tseng, Shian-Shyong / Teng, Chia-Wen et al. | 2006
- 845
-
Hand geometry identification without feature extraction by general regression neural networkPolat, Övünç / Yıldırım, Tülay et al. | 2006
- 850
-
Using GHSOM to construct legal maps for Taiwan’s securities and futures marketsShih, Jen-Ying / Chang, Yu-Jung / Chen, Wun-Hwa et al. | 2006
- 859
-
Classification method using fuzzy level set subgroupingKukkurainen, Paavo / Luukka, Pasi et al. | 2006
- 866
-
Neighborhood classifiersHu, Qinghua / Yu, Daren / Xie, Zongxia et al. | 2006
- 877
-
Toward supporting real-time mining for data residing on enterprise systemsLiu, Yu-Chin / Hsu, Ping-Yu et al. | 2006
- 889
-
KBSLUA: A knowledge-based system applied in river land use assessmentLee, Tzai-Zang / Wu, Chien-Hsing / Wei, Hsien-Hui et al. | 2006
- 900
-
Broadcast scheduling in wireless sensor networks using fuzzy Hopfield neural networkShen, Yu-Ju / Wang, Ming-Shi et al. | 2006
- 908
-
Software maintenance project delays prediction using Bayesian Networksde Melo, Ana C.V. / Sanchez, Adilson J. et al. | 2006
- 920
-
An EP algorithm for stability analysis of interval neutral delay-differential systemsYan, Jun-Juh / Hung, Meei-Ling / Liao, Teh-Lu et al. | 2006
- 925
-
Forecast approach using neural network adaptation to support vector regression grey model and generalized auto-regressive conditional heteroscedasticityChang, Bao Rong / Tsai, Hsiu Fen et al. | 2006
- 935
-
Knowledge discovery in financial investment for forecasting and trading strategy through wavelet-based SOM networksLi, Sheng-Tun / Kuo, Shu-Ching et al. | 2006
- 952
-
The application of clustering analysis for the critical areas on TFT-LCD panelHsieh, Kun-Lin et al. | 2006
- 958
-
The reevaluate statistical results of quality of life in patients with cerebrovascular disease using adaptive network-based fuzzy inference systemTokmakçı, Mahmut / Ünalan, Demet / Soyuer, Ferhan / Öztürk, Ahmet et al. | 2006
- 964
-
Application of AI techniques for locating mobile terminals in mobile wireless cellular networks: A novel paging schemeMaitra, Madhubanti / Chatterjee, Amitava et al. | 2006
- 977
-
Investigation on the model of consumers’ perceived risk—integrated viewpointLin, Wen-Bao et al. | 2006
- 989
-
FCMAC-EWS: A bank failure early warning system based on a novel localized pattern learning and semantically associative fuzzy neural networkNg, G.S. / Quek, C. / Jiang, H. et al. | 2006
- 1004
-
Intelligent technical analysis based equivolume charting for stock trading using neural networksChavarnakul, Thira / Enke, David et al. | 2006
- 1018
-
Aggressive or conservative, general or specific? A study of organizations adopting different learning strategies in an artificial worldLu, Te-Tsai / Chen, Jong-Chen / Liao, Guo-Xun et al. | 2006
- 1028
-
An orthogonally filtered tree classifier based on nonlinear kernel-based optimal representation of dataCho, Hyun-Woo et al. | 2006
- 1038
-
Prediction of wastewater treatment plant performance based on wavelet packet decomposition and neural networksHanbay, Davut / Turkoglu, Ibrahim / Demir, Yakup et al. | 2006
- 1044
-
Comparison of neuro-fuzzy systems for classification of transcranial Doppler signals with their chaotic invariant measuresOzturk, Ali / Arslan, Ahmet / Hardalac, Firat et al. | 2006
- 1056
-
Comparison of envelope extraction algorithms for cardiac sound signal segmentationChoi, Samjin / Jiang, Zhongwei et al. | 2006
- 1070
-
Searching customer patterns of mobile service using clustering and quantitative association ruleSohn, So Young / Kim, Yoonseong et al. | 2006
- 1078
-
Rule-based intelligent adaptation in mobile information systemsWu, Shiow-yang / Chang, Chun-Shun / Ho, Shih-Hsun / Chao, Hung-Shun et al. | 2007
- 1093
-
Mining the data from a hyperheuristic approach using associative classificationThabtah, Fadi / Cowling, Peter et al. | 2007
- 1102
-
Response modeling with support vector regressionKim, Dongil / Lee, Hyoung-joo / Cho, Sungzoon et al. | 2006
- 1109
-
Implication of network size and structure on organizations’ knowledge transferTang, Fangcheng / Mu, Jifeng / MacLachlan, Douglas L. et al. | 2006
- 1115
-
Back-propagation neural network based importance–performance analysis for determining critical service attributesDeng, Wei-Jaw / Chen, Wen-Chin / Pei, Wen et al. | 2006
- 1126
-
Fuzzy time-series based on adaptive expectation model for TAIEX forecastingCheng, Ching-Hsue / Chen, Tai-Liang / Teoh, Hia Jong / Chiang, Chen-Han et al. | 2007
- 1133
-
Proportionate flexible flow shop scheduling via a hybrid constructive genetic algorithmShiau, Der-Fang / Cheng, Shu-Chen / Huang, Yueh-Min et al. | 2006
- 1144
-
The inventory management system for automobile spare parts in a central warehouseLi, S.G. / Kuo, X. et al. | 2006
- 1154
-
Designing strategy for multi-agent system based large structural health monitoringZhao, Xia / Yuan, Shenfang / Yu, Zhenhua / Ye, Weisong / Cao, Jun et al. | 2006
- 1169
-
EP-based PID control design for chaotic synchronization with application in secure communicationChen, Hsin-Chieh / Chang, Jen-Fuh / Yan, Jun-Juh / Liao, Teh-Lu et al. | 2006
- 1178
-
Discovering during-temporal patterns (DTPs) in large temporal databasesZhang, Li / Chen, Guoqing / Brijs, Tom / Zhang, Xing et al. | 2007
- 1190
-
Estimation of bladder muscle invasion in transitional cell carcinoma by using artificial neural networks: A study based on prebiopsy imaging findingsTokmakçı, Mahmut / Erdogan, Nuri / Sahin, Nurettin / Akgun, Hulya / Ekmekcioglu, Oguz et al. | 2006
- 1194
-
A particle swarm optimization approach to nonlinear rational filter modelingLin, Yih-Lon / Chang, Wei-Der / Hsieh, Jer-Guang et al. | 2006
- 1200
-
A recommender system using GA K-means clustering in an online shopping marketKim, Kyoung-jae / Ahn, Hyunchul et al. | 2007
- 1210
-
Improved kernel principal component analysis for fault detectionCui, Peiling / Li, Junhong / Wang, Guizeng et al. | 2006
- 1220
-
Input data for decision treesPiramuthu, Selwyn et al. | 2006
- 1227
-
Comparison of the decision tree, artificial neural network, and linear regression methods based on the number and types of independent variables and sample sizeKim, Yong Soo et al. | 2006
- 1235
-
Multi-attribute fuzzy time series method based on fuzzy clusteringCheng, Ching-Hsue / Cheng, Guang-Wei / Wang, Jia-Wen et al. | 2006
- 1243
-
IMM fuzzy probabilistic data association algorithm for tracking maneuvering targetTurkmen, Ilke et al. | 2006
- 1250
-
Value-added treatment inference model for rule-based certainty knowledgeCheng, Min-Yuan / Huang, Chin-Jung et al. | 2006
- 1266
-
Predicting opponent’s moves in electronic negotiations using neural networksCarbonneau, Réal / Kersten, Gregory E. / Vahidov, Rustam et al. | 2006
- 1274
-
Clustering people according to their preference criteriaDíez, Jorge / del Coz, Juan José / Luaces, Oscar / Bahamonde, Antonio et al. | 2006
- 1285
-
A hierarchical genetic algorithm for segmentation of multi-spectral human-brain MRIYeh, Jinn-Yi / Fu, J.C. et al. | 2006
- 1296
-
Introducing a decision tree-based indoor positioning techniqueYim, Jaegeol et al. | 2006
- 1303
-
A hybrid approach to supplier selection for the maintenance of a competitive supply chainHa, Sung Ho / Krishnan, Ramayya et al. | 2007
- 1312
-
Detection of traumatic brain injuries using fuzzy logic algorithmGüler, Inan / Tunca, Ayşe / Gülbandilar, Eyyüp et al. | 2006
- 1318
-
samap: An user-oriented adaptive system for planning tourist visitsCastillo, Luis / Armengol, Eva / Onaindía, Eva / Sebastiá, Laura / González-Boticario, Jesús / Rodríguez, Antonio / Fernández, Susana / Arias, Juan D. / Borrajo, Daniel et al. | 2007
- 1333
-
Support vector machine-based multi-source multi-attribute information integration for situation assessmentLu, Jie / Yang, Xiaowei / Zhang, Guangquan et al. | 2007
- 1341
-
A hybrid cooperative–comprehensive learning based PSO algorithm for image segmentation using multilevel thresholdingMaitra, Madhubanti / Chatterjee, Amitava et al. | 2007
- 1351
-
Ontologies and agents for a bus fleet management systemBelmonte, M.V. / Pérez-de-la-Cruz, J.L. / Triguero, F. et al. | 2007
- 1366
-
A two-level approach to choose the cost parameter in support vector machinesDong, Yulin / Xia, Zhonghang / Xia, Zunquan et al. | 2007
- 1371
-
A better estimate to the contribution rate of education on economic growth in China from 1999 to 2003Zhu, Kejun / Guo, Haixiang / Diao, Fengqin / Xu, Sixin et al. | 2007
- 1384
-
Classifier design with feature selection and feature extraction using layered genetic programmingLin, Jung-Yi / Ke, Hao-Ren / Chien, Been-Chian / Yang, Wei-Pang et al. | 2007
- 1394
-
Dynamic stereoscopic selective visual attention (DSSVA): Integrating motion and shape with depth in video segmentationFernández-Caballero, Antonio / López, María T. / Saiz-Valverde, Sergio et al. | 2007
- 1403
-
Probabilistic based recursive model for adaptive processing of data structuresCho, Siu-Yeung et al. | 2007
- 1423
-
Integrating intra-firm and inter-firm knowledge diffusion into the knowledge diffusion modelTsai, Chih Ming et al. | 2007
- 1434
-
Credit risk assessment with a multistage neural network ensemble learning approachYu, Lean / Wang, Shouyang / Lai, Kin Keung et al. | 2007
- 1445
-
Automatic expert identification using a text categorization technique in knowledge management systemsYang, Kun-Woo / Huh, Soon-Young et al. | 2007
- 1456
-
A threshold varying bisection method for cost sensitive learning in neural networksPendharkar, Parag C. et al. | 2007
- 1465
-
The application of extension neuro-network on computer-assisted lip-reading recognition for hearing impairedLay, Yun-Long / Tsai, Chung-Ho / Yang, Hui-Jen / Lin, Chern-Sheng / Lai, Chuan-Zhao et al. | 2007
- 1474
-
TextOntoEx: Automatic ontology construction from natural English textDahab, Mohamed Yehia / Hassan, Hesham A. / Rafea, Ahmed et al. | 2007
- 1481
-
Post-pruning in regression tree induction: An integrated approachOsei-Bryson, Kweku-Muata et al. | 2007
- 1491
-
A simulated-annealing-based approach for simultaneous parameter optimization and feature selection of back-propagation networksLin, Shih-Wei / Tseng, Tsung-Yuan / Chou, Shuo-Yan / Chen, Shih-Chieh et al. | 2007
- 1500
-
A formal modeling platform for composing web servicesChi, Yu-Liang / Lee, Hsun-Ming et al. | 2007
- 1508
-
The effect of knowledge sharing modelLin, Wen-Bao et al. | 2007
- 1522
-
On decision making support in blood bank information systemsLi, Bing Nan / Dong, Ming Chui / Chao, Sam et al. | 2007
- 1533
-
Fast blocking of undesirable web pages on client PC by discriminating URL using neural networksMa, Heng et al. | 2007
- 1541
-
Configuration change assessment: Genetic optimization approach with fuzzy multiple criteria for part supplier selection decisionsWang, H.S. et al. | 2007
- 1556
-
Development of a drowsiness warning system based on the fuzzy logic images analysisWu, Jian-Da / Chen, Tuo-Rung et al. | 2007
- 1562
-
A novel method for shelf life prediction of a packaged moisture sensitive snack using multilayer perceptron neural networkSiripatrawan, Ubonrat / Jantawat, Pantipa et al. | 2007
- 1568
-
Increasing the discriminatory power of DEA in the presence of the sample heterogeneity with cluster analysis and decision treesSamoilenko, Sergey / Osei-Bryson, Kweku-Muata et al. | 2007
- 1582
-
Erratum to “Temperature prediction and TAIFEX forecasting based on high-order fuzzy logical relationships and genetic simulated annealing techniques” [Expert Systems with Applications 34 (1) (2008) 328–336]Lee, Li-Wei / Wang, Li-Hui / Chen, Shyi-Ming et al. | 2007
- 1583
-
Erratum to: “Utility-based double auction mechanism using genetic algorithms” [Expert Systems with Applications 34 (1) (2008) 150–158]Choi, Jin Ho / Ahn, Hyunchul / Han, Ingoo et al. | 2007
- IFC
-
Editorial Board & Publication Information| 2007