Brenner Basistunnel: Wichtigkeit der Vorerkundung (German)
- New search for: Bergmeister, Konrad
- New search for: Töchterle, Andrea
- New search for: Bergmeister, Konrad
- New search for: Töchterle, Andrea
In:
Tunnel
;
32
, 1
;
12-23
;
2013
-
ISSN:
- Article (Journal) / Print
-
Title:Brenner Basistunnel: Wichtigkeit der Vorerkundung
-
Additional title:Brenner Base Tunnel: Importance of preliminary prospection
-
Contributors:Bergmeister, Konrad ( author ) / Töchterle, Andrea ( author )
-
Published in:Tunnel ; 32, 1 ; 12-23
-
Publisher:
- New search for: Bauverlag BV GmbH
-
Publication date:2013-01-01
-
Size:12 pages
-
ISSN:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:German
-
Keywords:
-
Source:
© Metadata Copyright Deutsche Bahn AG. All rights reserved.
Table of contents – Volume 32, Issue 1
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 12
-
Brenner Basistunnel: Wichtigkeit der VorerkundungBergmeister, Konrad / Töchterle, Andrea et al. | 2013
- 24
-
Kaiser-Wilhelm-Tunnel: Von der Planung bis zur AusführungTauch, Bodo et al. | 2013
- 50
-
Befestigungstechnik Katzenbergtunnel. Ankerbolzen halten innovative Oberleitungssysteme in TübbingenFockenberg, Klaus et al. | 2013