Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects (English)
- New search for: Deshpande, Abhijeet S.
- New search for: Deshpande, Abhijeet S.
- New search for: Salem, Ossama M.
- New search for: Miller, Richard A.
In:
Journal of construction engineering and management
;
138
, 6
; 716-725
;
2012
-
ISSN:
- Article (Journal) / Print
-
Title:Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects
-
Contributors:
-
Published in:Journal of construction engineering and management ; 138, 6 ; 716-725
-
Publisher:
- New search for: Soc.
-
Place of publication:New York, NY
-
Publication date:2012
-
ISSN:
-
ZDBID:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 56.40 / 56.08
- Further information on Basic classification
- New search for: 770/6510
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 138, Issue 6
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 679
-
Early Cost Estimating of Road Tunnel Construction Using Neural NetworksPetroutsatou, K. / Georgopoulos, E. / Lambropoulos, S. / Pantouvakis, J. P. et al. | 2011
- 688
-
Heuristic Method for Satisfying Both Deadlines and Resource ConstraintsHegazy, Tarek / Menesi, Wail et al. | 2011
- 697
-
Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement OfficerRanasinghe, Upul / Ruwanpura, Janaka / Liu, Xin et al. | 2011
- 707
-
Stock-Flow Model for Forecasting Labor SupplySing, Chun-pong / Love, P. E. D. / Tam, C. M. et al. | 2011
- 716
-
Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial ProjectsDeshpande, Abhijeet S. / Salem, Ossama M. / Miller, Richard A. et al. | 2011
- 725
-
GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction MaterialsKoo, Kyo-Jin / Park, Sung-Chul et al. | 2011
- 733
-
Eco-Efficiency of Construction Materials: Data Envelopment AnalysisTatari, Omer / Kucukvar, Murat et al. | 2011
- 742
-
Postoccupancy Energy Consumption Survey of Arizona’s LEED New Construction PopulationOates, Dixon / Sullivan, Kenneth T. et al. | 2011
- 751
-
Contractor Selection Using Multicriteria Decision-Making MethodsSan Cristóbal, José Ramón et al. | 2011
- 759
-
Quantitative Method for Updating Cost Contingency throughout Project ExecutionXie, Hua / AbouRizk, Simaan / Zou, Junhao et al. | 2011
- 767
-
Impact of Machine-Failure Costs on Equipment Replacement Policies: Tunneling Company Case StudyAlarcón, Luis F. / Rodríguez, Andrés / Mourgues, Claudio et al. | 2011
- 775
-
Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production FacilityWang, Chao / Liu, Min / Hsiang, Simon M. / Leming, Michael L. et al. | 2011
- 786
-
Discussion of “Critical Path Segments Scheduling Technique” by Tarek Hegazy and Wail MenesiFrancis, Adel / Miresco, Edmond et al. | 2012
- 788
-
Closure to “Critical Path Segments Scheduling Technique” by Tarek Hegazy and Wail MenesiHegazy, Tarek / Menesi, Wail et al. | 2012