Empirical Investigation of the Average Deployment Force of Personal Fall-Arrest Energy Absorbers (English)
- New search for: Goh, Yang Miang
- New search for: Goh, Yang Miang
In:
Journal of construction engineering and management
;
141
, 1
;
2015
-
ISSN:
- Article (Journal) / Print
-
Title:Empirical Investigation of the Average Deployment Force of Personal Fall-Arrest Energy Absorbers
-
Contributors:Goh, Yang Miang ( author )
-
Published in:
-
Publisher:
- New search for: Soc.
-
Place of publication:New York, NY
-
Publication date:2015
-
ISSN:
-
ZDBID:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 56.40 / 56.08
- Further information on Basic classification
- New search for: 770/6510
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 141, Issue 1
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
-
Critical Success Factors in an Agency Construction Management EnvironmentInayat, Asfandyar / Melhem, Hani / Esmaeily, Asad et al. | 2014
-
Quality Change and Implications for Productivity Development: Housing Construction in Sweden 1990–2010Borg, Lena / Song, Han-Suck et al. | 2014
-
Implementing Lean Production in Copper Mining Development Projects: Case StudyCastillo, Gustavo / Alarcón, Luis F. / González, Vicente A. et al. | 2014
-
Empirical Investigation of the Average Deployment Force of Personal Fall-Arrest Energy AbsorbersGoh, Yang Miang et al. | 2014
-
Overdue Invoice Management: Markov Chain ApproachYounes, Bashar / Bouferguène, Ahmed / Al-Hussein, Mohamed / Yu, Haitao et al. | 2014
-
Social Welfare–Based Concession Model for Build/Operate/Transfer ContractsHu, Hao / Zhu, Yinghua et al. | 2014
-
Critical Data Needs Associated with Asbestos Cement Pipe Renewal MethodsMatthews, John C. / Stowe, Ryan et al. | 2014
-
Methodology for Creating Empirically Supported Agent-Based Simulation with Survey Data for Studying Group Behavior of Construction WorkersAhn, Seungjun / Lee, SangHyun et al. | 2014
-
Location-Aware Scheduling and Control of Linear Projects: Introducing Space-Time Float PrismsRoofigari-Esfahan, Nazila / Paez, Antonio / N.Razavi, Saiedeh et al. | 2014
-
Advanced Spray Multiple Layup Process for Quality Control of Sprayed FRP Composites Used to Retrofit Concrete StructuresHa, S. K. / Jang, J. G. / Park, S. H. / Lee, H. K. et al. | 2014
-
Method to Assess the Level of Implementation of Productivity Practices on Industrial ProjectsCaldas, Carlos H. / Kim, Jung-Yeol / Haas, Carl T. / Goodrum, Paul M. / Zhang, Di et al. | 2014
-
Reviewers| 2014
-
Neural Network Model for the Prediction of Safe Work Behavior in Construction ProjectsPatel, D. A. / Jha, K. N. et al. | 2014
-
Comparing AHP and CBA as Decision Methods to Resolve the Choosing Problem in Detailed DesignArroyo, P. / Tommelein, I. D. / Ballard, G. et al. | 2014