Coordinated scheduling of production and transportation in a two-stage assembly flowshop (English)
- New search for: Wang, K
- New search for: Wang, K
- New search for: Ma, W.Q
- New search for: Luo, H
- New search for: Qin, H
In:
International journal of production research
;
54
, 22
; 6891-6911
;
2016
-
ISSN:
- Article (Journal) / Print
-
Title:Coordinated scheduling of production and transportation in a two-stage assembly flowshop
-
Contributors:
-
Published in:International journal of production research ; 54, 22 ; 6891-6911
-
Publisher:
- New search for: Taylor & Francis
-
Place of publication:London
-
Publication date:2016
-
ISSN:
-
ZDBID:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
- New search for: 52.70 / 52.70 / 85.35 / 85.35
- Further information on Basic classification
- New search for: 275/1930
-
Keywords:
-
Classification:
-
Source:
Table of contents – Volume 54, Issue 22
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 6661
-
Application of interpretive structural modelling and structural equation modelling for analysis of sustainable manufacturing factors in Indian automotive component sectorThirupathi, R.M. / Vinodh, S. et al. | 2016
- 6683
-
The influence of competitive pressure on manufacturer internal information integrationMoyano-Fuentes, José / Martínez-Jurado, Pedro-José et al. | 2016
- 6693
-
Smart box-enabled product–service system for cloud logisticsZhang, Yingfeng / Liu, Sichao / Liu, Yang / Li, Rui et al. | 2016
- 6707
-
A dynamic multi-plant lot-sizing and distribution problemDarvish, Maryam / Larrain, Homero / Coelho, Leandro C. et al. | 2016
- 6718
-
Lagrangean relaxation approach to joint optimization for production planning and scheduling of synchronous assembly linesAn, Yu-Wei / Yan, Hong-Sen et al. | 2016
- 6736
-
Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systemsHe, Yumin / Stecke, Kathryn E. / Smith, Milton L. et al. | 2016
- 6747
-
Loading and sequencing heuristics for job scheduling on two unrelated parallel machines with long, sequence-dependent set-up timesStrohhecker, Jürgen / Hamann, Michael / Thun, Jörn-Henrik et al. | 2016
- 6768
-
Flexible robotic manufacturing cell scheduling problem with multiple robotsYang, Yujun / Chen, Ye / Long, Chuanze et al. | 2016
- 6782
-
Solving the blocking flow shop scheduling problem with makespan using a modified fruit fly optimisation algorithmHan, Yuyan / Gong, Dunwei / Li, Junqing / Zhang, Yong et al. | 2016
- 6798
-
Card-based delivery date promising in pure flow shops with order release controlThürer, Matthias / Stevenson, Mark et al. | 2016
- 6812
-
Dynamic adjustment of dispatching rule parameters in flow shops with sequence-dependent set-up timesHeger, Jens / Branke, Jürgen / Hildebrandt, Torsten / Scholz-Reiter, Bernd et al. | 2016
- 6825
-
Designing a cellular manufacturing system considering decision style, skill and job security by NSGA-II and response surface methodologyAzadeh, Ali / Pashapour, Shima / Abdolhossein Zadeh, Saeed et al. | 2016
- 6848
-
Automatic generation of a section building planning for constructing complex ships in European shipyardsRose, C.D. / Coenen, J.M.G. et al. | 2016
- 6860
-
A discrete artificial bee colony algorithm for single machine scheduling problemsYurtkuran, Alkın / Emel, Erdal et al. | 2016
- 6879
-
Minimising total weighted earliness and tardiness penalties on identical parallel machines using a fast ruin-and-recreate algorithmLin, Shih-Wei / Ying, Kuo-Ching / Chiang, Yen-I / Wu, Wen-Jie et al. | 2016
- 6891
-
Coordinated scheduling of production and transportation in a two-stage assembly flowshopWang, K. / Ma, W.Q. / Luo, H. / Qin, H. et al. | 2016