Aging Effects on Time-Dependent Nuclear Plant Unavailability with Changing Surveillance Interval (English)
- New search for: Okazaki, Tadatsugi
- New search for: Aldemir, Tunc
- New search for: Okazaki, Tadatsugi
- New search for: Aldemir, Tunc
In:
Probabilistic Safety Assessment and Management
;
1559-1565
;
2004
- Article/Chapter (Book) / Electronic Resource
-
Title:Aging Effects on Time-Dependent Nuclear Plant Unavailability with Changing Surveillance Interval
-
Contributors:Okazaki, Tadatsugi ( author ) / Aldemir, Tunc ( author )
-
Published in:Probabilistic Safety Assessment and Management ; 1559-1565
-
Publisher:
- New search for: Springer London
-
Place of publication:London
-
Publication date:2004-01-01
-
Size:7 pages
-
ISBN:
-
DOI:
-
Type of media:Article/Chapter (Book)
-
Type of material:Electronic Resource
-
Language:English
-
Keywords:
-
Source:
Table of contents eBook
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
The Psychological Factors concerning Human Errors as the Cause of Labour Accidents in JapanNakamura, Takahiro / Usui, Shinnosuke / Shinohara, Kazumitsu / Kanda, Koji et al. | 2004
- 7
-
CEHAM: How to Analyse the Effectiveness of Human Error Handling in Complex OperationsGiulio, A. / Cagno, E. / Leva, M. C. / Trucco, P. et al. | 2004
- 14
-
The influence of the human error on naval accidents. A Fuzzy logic approach.Carcassi, M. / Cerchiara, G. M. / Zambolin, L. / Romano, G. et al. | 2004
- 20
-
Human Error Analysis Support System for Maintenance WorksSakajo, Satoko / Wu, Wei / Ohi, Tadashi et al. | 2004
- 26
-
Regulatory Review of a PSAHessel, Philippe et al. | 2004
- 32
-
Lessons Learnt from Review of PSA Studies for VVER-type ReactorsTokmachev, Gennady / Lyubarskiy, Artur et al. | 2004
- 39
-
Regulatory Evaluation of the Mühleberg PSASchulz, Ralph / Schoen, Gerhard / Seock Kim, Inn / Zavisca, Michael / Yuan, Zhe / Khatib-Rahbar, Mohsen et al. | 2004
- 45
-
Overview of National Regulatory Practices for Using PSA in SlovakiaHusarcek, Jan et al. | 2004
- 52
-
Analysis of occupational hazards using fault treesMarx, Marcus / Knetsch, Thomas / Hauptmanns, Ulrich et al. | 2004
- 58
-
Risk Assessment Of Occupational Accident through Fuzzy ModelMurè, Salvina / Demichela, Micaela / Piccinini, Norberto et al. | 2004
- 64
-
Risk Model for Occupational Accidents Applied to Offshore Supply VesselsHansson, Lisbeth et al. | 2004
- 70
-
General Insights from the International Common Cause Failure Data Exchange (ICDE) ProjectBaranowsky, Patrick / Rasmuson, Dale / Johanson, Gunnar / Kreuser, Albert / Pyy, Pekka / Werner, Wolfgang et al. | 2004
- 76
-
ICDE Project: Insights and Results from the Analysis of Common-Cause Failures of BatteriesMorales, Rosa / Pereira, Begoña / Pyy, Pekka / Werner, Wolfgang et al. | 2004
- 82
-
Lessons Learnt from Data Collected in the ICDE ProjectTirira, Jorge / Werner, Wolfgang et al. | 2004
- 88
-
Insights and Results from the Analysis of Common-Cause Failure Data Collected in the ICDE Project for Safety and Relief ValvesJohanson, Gunnar / Jonsson, Esther / Jänkälä, Kalle / Pesonen, Jari / Werner, Wolfgang et al. | 2004
- 94
-
Reflections on the Concept of Safety BarriersSklet, Snorre / Hauge, Stein et al. | 2004
- 100
-
Analysing Safety Functions and Barriers — Experiences from Different Industrial SectorsHarms-Ringdahl, Lars et al. | 2004
- 110
-
Evaluating and Managing Safety Barriers in Major Hazard PlantsDuijm, Nijs Jan / Andersen, Henning Boje / Hale, Andrew / Goossens, Louis / Hourtolou, David et al. | 2004
- 116
-
Optimal Integration of Safety in complex system design using the Safety Modelling LanguageSchupp, B. A. / Hale, A. R. / Pasman, H. J. et al. | 2004
- 122
-
From Incident Response to Incident Response ManagementJohnsen, Stig Ole / Røstad, Lillian / Haugset, Børge / Dahl, Maria B. et al. | 2004
- 128
-
Emergency Response Optimization for Major Hazard Industrial SitesGeorgiadou, Paraskevi S. / Papazoglou, Ioannis A. / Kiranoudis, Christos T. / Markatos, Nikolaos C. et al. | 2004
- 134
-
A Risk — Informed Approach to Decision Making in Rescue OperationsRake, Eivind L. et al. | 2004
- 140
-
Integrating Software into PRA: A Test-Based ApproachLi, Bin / Li, Ming / Smidts, Carol et al. | 2004
- 146
-
Implementing Software Safety on the Space Shuttle Cockpit Avionics Upgrade (CAU) Project: A PRA Case for an Initial Qualitative ApproachMcLeod, Hubert C. et al. | 2004
- 152
-
Validation of a Software-Related Failure Mode TaxonomyLee, Alice / Smidts, Carol / Li, Bin / Li, Ming et al. | 2004
- 158
-
Conditional Risk Model Concept for Critical Space Systems SoftwareGuarro, Sergio / Yau, Michael / Oliva, Sergio et al. | 2004
- 164
-
Optimized Monte Carlo Simulations for System Reliability AnalysisCampioni, Luca / Scardovelli, Ruben / Vestrucci, Paolo et al. | 2004
- 170
-
Embedding local search procedures into Genetic Algorithms for the optimisation of industrial systemsEisinger, Siegfried / Zio, Enrico et al. | 2004
- 178
-
Dynamic Reliability Analysis for Automotive ApplicationsWoltereck, Martin / Hauschild, Jan / Meyna, Arno et al. | 2004
- 186
-
Risk Based Regulation and Cost Effectiveness before the Courts. Experiences of a judgeProf. Dr. iur. Seiler, Hansjörg et al. | 2004
- 192
-
Substance Prioritisation for the Development of EU Acute Exposure Toxicity Thresholds: Risk-Informed Decision MakingTrainor, Mary / Macbeth, Ron / Ridgway, Peter et al. | 2004
- 198
-
Uncertainty Assessment in Regulatory Judgement and DecisionmakingFaust, B. et al. | 2004
- 204
-
Regulatory Process/Structure for Future Nuclear Power Plant LicensingDrouin, Mary / King, Thomas / Singh, Amarjit / Lehner, John / Mubayi, Vinod / Pratt, Trevor et al. | 2004
- 211
-
Robust Reliability-based Design Optimization of Suspension BridgesCatallo, Luciano / Bontempi, Franco / Biondini, Fabio / Frangopol, Dan M. et al. | 2004
- 217
-
Handling Uncertainties in Optimal Design of Suspension Bridges with Special Emphasis on LoadsSgambi, Luca / Bontempi, Franco / Biondini, Fabio / Frangopol, Dan M. et al. | 2004
- 223
-
Probabilistic Fatigue Analysis of Improved Tubular Bridge Joints Considering Multiple Crack Initiation SitesWalbridge, Scott / Nussbaumer, Alain et al. | 2004
- 229
-
Analysis of the Risks of the Population due to Airplane Crashes Around Zürich Airportdipl.Ing. Bienz, Andreas F. et al. | 2004
- 236
-
Airport Public Safety Zones: Part 1 — Risk Model DerivationDavies, P. A. / Quinn, D. J. et al. | 2004
- 242
-
Airport Public Safety Zones: Part 2 — Risk Model ApplicationDavies, P. A. / Quinn, D. J. et al. | 2004
- 248
-
A new determination of air crash frequencies and its implications for operation permissionsWeidl, Thorsten / Klein, Gerhard et al. | 2004
- 254
-
A Study on the Development of a Systematic Framework to Construct Diagnosis ProceduresPark, Jinkyun / Jung, Wondea / Kim, Jaewhan / Ha, Jaejoo et al. | 2004
- 260
-
Optimization of Task Allocation through Human Cognitive Simulation: Levels of Automation and Human BehaviorsFurukawa, Hiroshi / Inagaki, Toshiyuki / Niwa, Yuji et al. | 2004
- 266
-
Analysis of Cognitive Activities of Bushehr Nuclear Power Plant Control Room Operators in Case of Abnormal ConditionsSepanloo, Kamran / Jafarian, Reza et al. | 2004
- 272
-
Multi-Agent Situation Awareness Error Evolution in Air TrafficBlom, Henk A. P. / Stroeve, Sybert H. et al. | 2004
- 278
-
Level 2 Full Power and Shutdown PSA of the J. Bohunice VI NPPKovacs, Zoltan / Pnacek, Ignac et al. | 2004
- 284
-
Main Results of a Level 2 PSA Study Completed for Paks NPPElter, Jozsef / Gado, Janos / Hollo, Elod et al. | 2004
- 290
-
Modelling of Severe Accident Phenomena in Level 2 PSA for Paks NPPTéchy, Zsolt / Lajtha, Gabor et al. | 2004
- 296
-
Level 2 PSA for the VVER 440/213 Dukovany Nuclear Power PlantDienstbier, Jiri / Hustak, Stanislav / Rydl, Adolf et al. | 2004
- 302
-
Risk Management Policies in Selected OECD Countries — An OECD Futures ProjectLahidji, Reza et al. | 2004
- 308
-
Investigation of Nuclear Plant Safety Utilizing an Analytical Risk Management ModelHess, Stephen M. / Gaertner, John P. et al. | 2004
- 315
-
New frontiers in the management of explosion hazardRomano, Alfredo / Fidelibus, Antonio et al. | 2004
- 321
-
Error States — Proactive Learning, Forgetting and Elimination using Safety ManagementDuffey, Romney / Saull, John et al. | 2004
- 328
-
The Centralised Component Reliability Database for PSA Purposes ZEDB — Status, Evaluation 2002, Trends —Blombach, Joerg / Buckermann, Ralf / Schubert, Bernd et al. | 2004
- 334
-
Evaluation and Comparison of Estimation Methods for Failure Rates and ProbabilitiesVaurio, Jussi / Jänkälä, Kalle et al. | 2004
- 340
-
The German Utilities’ Efforts to Achieve Current Data for Probabilistic Safety AssessmentWohlstein, Ralf et al. | 2004
- 346
-
Reliability Data Collection and Processing for Romanian TRIGA-SSR 14 MW Reactor for PSA useMladin, D. / Mladin, M. / Cristea, D. et al. | 2004
- 352
-
Barrier Change Analysis MethodØien, Knut / Hauge, Stein / Sklet, Snorre / Monsen, John et al. | 2004
- 358
-
Defining safety functions and safety barriers from fault and event trees analysis of major industrial hazardsDebray, Bruno / Delvosalle, Christian / Fiévez, Cécile / Pipart, Aurore / Londiche, Henry / Hubert, Emmanuel et al. | 2004
- 364
-
Barrier Analysis Analysed in MORT PerspectiveKingston, John / Nertney, Robert / Frei, Rudolf / Schallier, Philippe / Koornneef, Floor et al. | 2004
- 370
-
From Incidents to Proactive Actions: A Bottom-up Approach to Identification of Safety Critical FunctionsTinmannsvik, Ranveig Kviseth / Rosness, Ragnar et al. | 2004
- 376
-
Development of Management of Nuclear Power Plant Fire SituationsHukki, Kristiina / Holmberg, Jan-Erik et al. | 2004
- 383
-
A Bayesian Network Approach to Accident Management and Estimation of Source Terms for Emergency PlanningZavisca, Michael / Kahlert, Heinrich / Khatib-Rahbar, Mohsen / Grindon, Elizabeth / Ang, Ming et al. | 2004
- 389
-
Multi-agent Simulation of Emergency Response In Nuclear DisasterKanno, Taro / Morimoto, Yusuke / Furuta, Kazuo et al. | 2004
- 395
-
The use of Virtual Reality Training for Emergency Response PersonnelWijngaarden, Marco et al. | 2004
- 400
-
Can Artificial Intelligence Be Safe?Nordland, Odd et al. | 2004
- 406
-
A Common Framework for Design and Safety Analyses using Formal MethodsDeneux, Johann / Åkerlund, Ove et al. | 2004
- 412
-
Risk in the Aspect of Safety and Reliability of Autonomous System.Drobiszewski, Jacek / Smalko, Zbigniew et al. | 2004
- 418
-
An Information Retrieval Terminology for Model-Based Risk AssessmentP-J Thunem, Atoosa / Fredriksen, Rune / Axel Gran, Bjørn et al. | 2004
- 424
-
Monte-Carlo Simulation — A Powerful Tool to Support Experimental Activities in Structure ReliabilityYuritzinn, Tamara / Eid, Mohamed / Chapuliot, Stéphane / Masson, Renaud / Dahl, Anna / Moinereau, Dominique et al. | 2004
- 431
-
The Benefit of Using Sampling Techniques with Adaptive Meta-Models in System Reliability AnalysisSchueremans, Luc / Gemert, Dionys et al. | 2004
- 437
-
Application of Monte-Carlo-Simulation in Structural ReliabilityCurbach, Manfred / Proske, Dirk et al. | 2004
- 444
-
Application of Mixture Priors to Assessment of PerformanceAtwood, Corwin L. / Youngblood, Robert W. et al. | 2004
- 450
-
Risk-Informed Decision Making with PARAGON™Shanley, Leo / True, Doug / Parsley, Edward / Steinmetz, John / Burchill, William et al. | 2004
- 456
-
A Study of Implications of Using Importance Measures in Risk-Informed DecisionsAzarkhail, Mohammadreza / Modarres, Mohammad et al. | 2004
- 462
-
A Quantitative Approach to Risk-Informed Safety Significance Categorization with an Early Expert ParticipatoryHa, Jun Su / Seong, Poong Hyun et al. | 2004
- 468
-
Functional, Structural and Human Related Safety Measures in Multiple Use of SpaceSuddle, S. I. et al. | 2004
- 475
-
Applications of Risk Management in the Design and Construction of InfrastructureDuijvestijn, A. M. W. / Kuijper, Harrie K. T. / Voortman, Hessel G. et al. | 2004
- 481
-
Effectivity of Risk Management for Design & Construct Projects of Large ContractorsVastert, J. G. / Gelder, P. H. A. J. M. et al. | 2004
- 488
-
Modeling Consequences due to Failure of Extraordinary StructuresHavbro Faber, Michael / Kübler, Oliver / Fontana, Mario et al. | 2004
- 494
-
Automatic Dependent Surveillance in the Air Traffic System — a Probabilistic ApproachNavarrete, Mauricio / Cugnasca, Paulo et al. | 2004
- 501
-
An Application of Monte Carlo Method for Estimating the Longitudinal Collision Risk of the NOPAC Route in an ADS EnvironmentNagaoka, Sakae et al. | 2004
- 507
-
Human-Machine Simulation System for Safety Evaluation in Air Traffic ControlInoue, Satoru / Furuta, Kazuo et al. | 2004
- 513
-
An Evolutive Environment for Development of Free-FlightOliveira, Ítalo / Cugnasca, Paulo / Camargo, João Jr. / Fonseca, Rubens / Silva, Jobson et al. | 2004
- 519
-
Safety Changes Related to ICT Maintenance Systems in ShippingOse, Grethe Osborg et al. | 2004
- 525
-
Working Equipment Design: Comparison of Safety Modalities Integration in Two Design DepartmentsGarza, Cecilia / Fadier, Elie et al. | 2004
- 531
-
Information Retrieval Using Ontology for Sharing Knowledge on SafetyOgure, Takuya / Furuta, Kazuo et al. | 2004
- 537
-
Political Management Issues and Societal Risk Trade-off for the Built EnvironmentCorotis, Ross B. et al. | 2004
- 543
-
PSA Application on the Tokai Reprocessing PlantIshida, Michihiko / Nakano, Takafumi / Morimoto, Kazuyuki / Nojiri, Ichiro et al. | 2004
- 549
-
Safety analysis in the LBE-Cooled XADS plant through an integrated use of HAZOP, FAULT TREE and thermalhydraulic transient analysesAliotta, Salvatore / Amato, Vincenzo / Casamirra, Maddalena / Castiglia, Francesco / Giardina, Mariarosa et al. | 2004
- 555
-
Probabilistic Safety Analysis of the International Fusion Materials Irradiation FacilityBurgazzi, Luciano et al. | 2004
- 561
-
Probabilistic Safety Assessment for a Large Industrial IrradiatorLópez, Ramón / Eugenia Cuecuecha, Maria / Mardian, Joseph et al. | 2004
- 567
-
Precautionary Risk Decision-MakingRosqvist, Tony / Tuominen, Risto et al. | 2004
- 573
-
Risk and Decision Analysis Techniques Applied to Complex Facility Asset ManagementLiming, James K. / Dykes, Andrew A. et al. | 2004
- 579
-
Multicriterion Problem of NPP Lifetime ManagementGulina, Olga / Salnikov, Nikolay et al. | 2004
- 585
-
A Paradigm for Energy and Transportation System Surety in the 21st CenturyCovan, John M. et al. | 2004
- 591
-
Statistical Modelling and Analysis of Failure and Inspection Data for a Railway LineDolven, Ole Fridtjov / Lindqvist, Bo Henry / Hokstad, Per Richard et al. | 2004
- 597
-
Alternative Reliability Prognosis Models for Automotive ComponentsMeyer, Matthias / Meyna, Arno / Pauli, Bernhard et al. | 2004
- 603
-
Research on components’ durability demonstration and verification test for armored vehiclesWu, Wei / Xiao, Shun-wang / Hu, Feng-hua et al. | 2004
- 608
-
Managing safety barriers and controls at the workplaceHale, Andrew / Goossens, Louis / Ale, Ben / Bellamy, Linda / Post, Jos / Oh, Joy / Papazoglou, Ioannis A. et al. | 2004
- 614
-
The barrier requirements in the Norwegian Petroleum RegulationsNielsen, Liv et al. | 2004
- 620
-
Integrated Barrier Analysis in Operational Risk Assessment in Offshore Petroleum OperationsVinnem, Jan Erik / Aven, Terje / Hauge, Stein / Seljelid, Jorunn / Veire, Gunnar et al. | 2004
- 626
-
SiGES: an innovative emergency management system for high density industrial sitesSciallero, Eugenio / Podestá, Fabio / Spadon, Roberto / Catuzzato, Filippo et al. | 2004
- 632
-
Italian Explosives Depots From Tulps To Seveso II: A Proposal For Emergency PlanningDadone, Pier Nicola et al. | 2004
- 638
-
Lessons learnt from a Mediterranean flood (Gard, September 2002)Huet, Philippe / Baumont, Geneviève et al. | 2004
- 644
-
Risk- and Vulnerability Analyses in Crisis Management of Extreme Events — A Pilot StudyAbrahamsson, Marcus / Magnusson, Sven Erik / Petersen, Kurt et al. | 2004
- 650
-
Human Reliability Analysis Related Issues in IT-System Operation: A Case StudyMock, Ralf / Scherrer, Reto et al. | 2004
- 656
-
Insights from Analysis of Procedural Errors in Telecommunications IndustryChang, Y. H. / Mosleh, A. / Macwan, A. et al. | 2004
- 663
-
The Risk Effect Analysis of the Digital Safety-Critical Systems in a Nuclear Power PlantKang, Hyun Gook / Jang, Seung-Cheol / Ha, Jaejoo et al. | 2004
- 669
-
Study on Operative Reliability of Safety-Related Control SystemsFukuda, Takabumi / Kuroi, Kunihiro / Fukuda, Go / Shimizu, Hisaji et al. | 2004
- 675
-
A Numerical Scheme to Solve Integro-Differential Equations in the Dynamic Reliability FieldCocozza-Thivent, Christiane / Eymard, Robert / Mercier, Sophie et al. | 2004
- 681
-
Implementation of hybrid Petri nets — Lessons learned from their application to a SMR unitKermisch, Céline / Labeau, Pierre-Etienne et al. | 2004
- 687
-
The Stimulus-Driven Theory of Probabilistic Dynamics as a Framework for Probabilistic Safety AssessmentIzquierdo, José Maria / Labeau, Pierre-Etienne et al. | 2004
- 694
-
Controllable Dynamic System Reliability Models for Risk Assessment of Process Control SystemsPetkov, Gueorgui / Matsuoka, Takeshi et al. | 2004
- 701
-
Regulatory Use of PSA in Belgium — Status, Lessons Learned and PerspectivesHulsmans, Mark / Gelder, Pieter / Gryffroy, Dries / haesendonck, Michel et al. | 2004
- 707
-
Current trends in Risk-Informed changes to Limiting Conditions for OperationMartorell, Sebastian / Villanueva, Jose F. / Nebot, Yolanda / Carlos, Sofia / Serradell, Vicente et al. | 2004
- 714
-
Option 2 Risk-Informed Regulation Pilot Application to Cofrentes NPPBorondo, Lourdes / Fiol, Mariano J. / Vázquez, Teresa / Deltoro, Salvador et al. | 2004
- 720
-
An Approach to Definition of Large ReleaseKhatib-Rahbar, Mohsen / Karimi, Roy / Lantarón, Alfredo / Calvo, José et al. | 2004
- 726
-
Fire prevention in underground works: software modelling applicationsFileppo, Enrico / Marmo, Luca / Debernardi, Maria Luisa / Demetri, Katia / Pertusio, Raffaele et al. | 2004
- 732
-
Fire Risk Analysis and Modelling of the Relevant Scenarios: towards a Performance Based Fire Engineering and Protection ApproachFiorentini, Luca / Rossini, Vinicio / Coppola, Gaetano / Ferrari, Andrea et al. | 2004
- 738
-
Rapid Assessment of the Consequences of Fire in Sub-surface InfrastructureVoortman, Hessel G. / Nieuwenhuizen, Jasper B. et al. | 2004
- 745
-
Applications and Impacts of a Real Fire in a Residential Building for Analysis the Level of Risk for LifeFicarella, Antonio / Lala, Roberta / Perago, Alessandro / Laforgia, Domenico et al. | 2004
- 751
-
Stochastic Process for Aeronautical Design and Maintenance OptimizationSommerhalter, B. / Sauvage, D. et al. | 2004
- 758
-
Emergency in-service air fleet data analysisThiebault, C. / Sauvage, D. et al. | 2004
- 766
-
Maintenance Wire Risk Evaluation for Space ShuttleMulvihill, R. J. / Cockrell, J. et al. | 2004
- 773
-
New Methods of Solving Multidimensional Non-Linear Optimisation Problems-Application Thereof to Construct Air-Line Flight SchedulesJaźwiński, Jerzy / Klimaszewski, Sławomir / Żurek, Józef / Gawrylczyk, Jarosław et al. | 2004
- 779
-
Chemistry and Metallurgy Research Replacement (CMRR) Facility Risk Analysis StudyVigil, Michael / Gordon, Derek et al. | 2004
- 785
-
Bounding Fire Accident for LANL Plutonium FacilityRichardson, Jennie / Gordon, Derek / Tell, Raymond / Kern, Kristen / Vigil, Michael / Romero, Jesus et al. | 2004
- 791
-
Integrating Technical Failures, Human Error and Public Misbehaviour in Rail Risk AssessmentBurns, David et al. | 2004
- 797
-
System Safety Approach and Management for the Taiwan High Speed Rail ProjectWen-Liang Liu, Max / Robertson, Stanley / Saleem, Amair et al. | 2004
- 803
-
Early Warning on Vehicle Defects and Recall SystemDipl. Ing. Meyer, Reinhard E. et al. | 2004
- 808
-
Safety Analysis of the Transrapid Transportation System: Methods and Case StudyGmünder, Felix K. / Hürzeler, Christian / Kerland, Gösta et al. | 2004
- 814
-
Use of Bayesian Belief Networks for risk management in energy distributionDeleuze, Gilles / Bertin, Hélène / Dutfoy, Anne / Pierlot, Sandrine / Pourret, Olivier et al. | 2004
- 819
-
Dependency Defence — How to protect against dependent failuresHellström, Per / Johanson, Gunnar / Bento, Jean-Pierre et al. | 2004
- 825
-
Developing Soft Factors Inputs to Common Cause Failure ModelsZitrou, Athena / Bedford, Tim / Walls, Lesley et al. | 2004
- 831
-
Analysis and Modelling of Dependent FailuresKnochenhauer, Michael / Mankamo, Tuomas / Pörn, Kurt et al. | 2004
- 837
-
Parameter Estimation for the Process Oriented Simulation (POS) Model for Common Cause FailuresBerg, Heinz Peter / Görtz, Rudolf / Schimetschka, Edgar et al. | 2004
- 843
-
Safety Culture: Analysis and InterventionWilpert, Bernhard / Fahlbruch, Babette et al. | 2004
- 850
-
Safety Culture Assessment — Methods and Indicators, Results of a German Research ProjectDr. Schott, Helga / Balfanz, Hans-Peter / Junge, Rolf-Diether / Dr. Sträter, Oliver / Kallenbach-Herbert, Beate / Sickert, Manfred et al. | 2004
- 857
-
Can safety culture in differing organizations mean the same thing?Harvey, Joan / Erdos, George / Jackson, Helen / Dennison, Selina et al. | 2004
- 863
-
Issues Related To Safety CultureApostolakis, George E. / Bonaca, Mario V. et al. | 2004
- 869
-
Assessing the Proliferation Resistance of Innovative Nuclear Fuel CyclesBari, Robert / Roglans, Jordi / Denning, Richard / Mladineo, Stephen et al. | 2004
- 875
-
How useful can Probability Risk Assessment tools be for Proliferation Resistance assessmentGrenèche, D. / Xerri, C. et al. | 2004
- 882
-
A Decision Analysis Based Methodology for the Assessment of the Proliferation Resistance of Nuclear Power Systems.Papazoglou, Ioannis A. / Bari, Robert A. et al. | 2004
- 888
-
Study of Proliferation Risk for Nuclear Fuel Cycles with Plutonium BreedingKorobeynikov, V. V. / Tikhomirov, B. B. / Oussanov, V. I. / Iougai, S. V. / Pshakin, G. M. / Chebeskov, A. N. et al. | 2004
- 895
-
Efficient reliability growth modelling for industrial software failure dataElbel, Benedikte / Maeckel, Oliver et al. | 2004
- 902
-
A Framework for Dependable Development Process of Complex Computerised SystemsThunem, Atoosa P-J et al. | 2004
- 908
-
Benchmarking Software Reliability Growth ModelsHu, Yunwei / Zhang, Wei / Li, Bin et al. | 2004
- 914
-
Availability Assessment of Multi-State Systems with Operational DependenceZio, E. / Marella, M. / Podofillini, L. et al. | 2004
- 920
-
Markovian modelling with data uncertaintiesChâtelet, E. / Kouta, R. et al. | 2004
- 926
-
Modelling Dependent Component Failures with Domino EffectsRakowsky, Uwe K. / Schneeweiss, Winfrid G. et al. | 2004
- 932
-
Reliable operation of Wastewater Treatment Plants by Taking into Account Aleatory and Epistemic Uncertainties in the Design ProcessKnetsch, Thomas / Hauptmanns, Ulrich et al. | 2004
- 938
-
Risk-Informed Decision Making in Generic Safety Issue Resolution and RulemakingWeerakkody, S. D. et al. | 2004
- 944
-
An Argument for Using Probabilistic Safety Assessment in Maritime Domain: Some Now, but More LaterSzwed, Paul S. et al. | 2004
- 951
-
Asset Management and Cost Saving Maintenance Strategy Based on Risk-Informed Decision MakingKauer, Robert / Sacher, Hubert et al. | 2004
- 957
-
A Quantitative Assessment on Limiting Conditions for Operations Using a Concept of System DynamicsKang, Kyungmin / Jae, Moosung et al. | 2004
- 964
-
Analysis of Human Decision-based Errors of Commission in Accident ScenariosKim, Jaewhan / Jung, Wondea / Park, Jinkyun et al. | 2004
- 971
-
Commission Error Causes Identified from Operating ExperienceReer, Bernhard et al. | 2004
- 977
-
Using Information from Operating Experience to Inform Human Reliability AnalysisHallbert, Bruce P. / Gertman, David I. / Marble, Julie / Lois, Erasmia / Siu, Nathan et al. | 2004
- 983
-
Task Complexity as a Factor for Human Reliability AssessmentBraarud, Per Øivind / Laumann, Karin / Svengren, Håkan et al. | 2004
- 989
-
Estimation of Electrical Systems Impact into Total Risk from NPPLankin, Mikhail et al. | 2004
- 995
-
The Evaluation of Reliability and Success Criteria by the Thermal Hydraulic Analysis of Auxiliary Feedwater System using PSA Technology for the Improved KSNPKim, Jae-Gab / Kim, Myung-Ro / Kang, Sun-Koo / Park, Heung-Gyu / Jung, Gie-Jin / Park, Ki-Seung et al. | 2004
- 1002
-
The effect of Relay Protection on the Substation ReliabilityPottonen, Liisa / Pulkkinen, Urho / Koskinen, Mikko et al. | 2004
- 1008
-
Risk Reduction Through Partial Stroke TestingHoutermans, Michel J. M. / Rouvroye, Jan L. / Karydas, Dimitrios M. et al. | 2004
- 1014
-
Review of the Major Accident Risk Assessment and Risk Management System in SerbiaStojanovic, M. B. / Jovasevic-Stojanovic, M. et al. | 2004
- 1020
-
Definition of Safety Integrity Levels and the Influence of Assumptions, Methods and Principles UsedSchäbe, H. et al. | 2004
- 1026
-
September 11, Columbia, Davis-Besse, and PRA: Business as Usual?Siu, Nathan / Mosleh, Ali / Meacham, Brian et al. | 2004
- 1032
-
Linking Risk Analysis to Safety ManagementTrbojevic, Vladimir et al. | 2004
- 1038
-
Case Studies of EM Algorithm with Masked DataTan, Zhibin et al. | 2004
- 1044
-
Treatment of Partial Homogeneity in Population Variability Analysis of DataGroen, Frank J. / Mosleh, Ali / Droguett, Enrique L. et al. | 2004
- 1051
-
Predictive Distributions for Detecting Departures from an Uncertain BaselineAtwood, Corwin L. et al. | 2004
- 1057
-
Comparison of Organisational Cultures at Two NPP Maintenance Units — When is Maintenance Work Motivating and Meaningful?Reiman, Teemu / Oedewald, Pia / Rollenhagen, Carl et al. | 2004
- 1064
-
Safety Culture aboard TankersHåvold, Jon Ivar et al. | 2004
- 1071
-
Assessment and Improvement of Safety Culture across Borders in European RailwaysSteiro, Trygve / Johnsen, Stig Ole / Bergersen, Camilla E. B. / Tungland, Malene et al. | 2004
- 1077
-
Experience on Applying the Developed Safety Assessment System to Various IndustriesTakano, Ken-ichi / Hasegawa, Naoko / Hirose, Ayako et al. | 2004
- 1083
-
Qualitative and Quantitative Analysis of Safeguards Logic TreesCojazzi, Giacomo G. M. / Renda, Guido / Contini, Sergio et al. | 2004
- 1089
-
Probabilistic Safety Assessment and Management Techniques Applied to Commercial Nuclear Power Plant Security EvaluationLiming, James K. / Dykes, Andrew A. et al. | 2004
- 1096
-
Development of a PSA-based Vital Area Identification Methodology for the Physical Security of Nuclear Power PlantsPark, Chang-Kue / Jung, Woo Sik / Yang, Joon-Eon / Kang, Hyun Gook et al. | 2004
- 1102
-
PRA of the Abandoned Chemical Weapons in ChinaEpstein, Steven / Nishimura, Sunao / Wakefield, Donald et al. | 2004
- 1108
-
Verification of Fault Detection Capability with Diversified SoftwareBeckman, Haakon / Warholm, Lasse / Endresen, Jan et al. | 2004
- 1114
-
A Data Flow Approach to Testing Object-Oriented Java-ProgramsOster, Norbert / Dorn, Robert-Daniel et al. | 2004
- 1120
-
Test Automation of Embedded System SoftwareHan, Sang-Seop / Park, Sang-Deuk / Kal, Dae-Suk / Kim, Eun-Ju et al. | 2004
- 1128
-
Diagnostic Tests for Real Time SystemsNourelfath, Mustapha / El-Ghazouani, Khalid et al. | 2004
- 1134
-
MFFOP Technology for Setting Reliability RequirementsTodinov, M. T. et al. | 2004
- 1140
-
On the cost function for periodically inspected standby safety systemsZequeira, Rómulo I. / Bérenguer, Christophe et al. | 2004
- 1146
-
Reliability and Safety of Autonomous Electric Energy Supply SystemsGabel, Dieter / Hauptmanns, Ulrich et al. | 2004
- 1152
-
Improvement of the GO-FLOW MethodologyMatsuoka, Takeshi et al. | 2004
- 1158
-
Mitigating Systems Performance Index BaselinesEide, Steven / Zeek, Douglas et al. | 2004
- 1163
-
Cost/Benefit Considerations at Swiss NPPsRichner, Martin / Zimmermann, Samuel / Klügel, Jens-Uwe et al. | 2004
- 1169
-
Development of Radiolysis Gas Counter Measures based on Risk Informed ClassificationsSchubert, Bernd / Kleen, Uwe et al. | 2004
- 1174
-
From Risk to RAMS informed decision-making on changes to TSMMartorell, Sebastian / Villanueva, Jose F. / Nebot, Yolanda / Carlos, Sofia / Serradell, Vicente / Sanchez, Ana et al. | 2004
- 1181
-
Strategic Decision-Making Utilizing Probabilistic Risk Assessments for the International Space Station ProgramPerera, Jeevan / Smith, Clay et al. | 2004
- 1188
-
The International Space Station Probabilistic Risk Assessment Fire Analysis, Sensitivity Studies for Critical Variables, and Necessary Areas of Additional DevelopmentHeard, Addison / Vitali, Roberto et al. | 2004
- 1194
-
Derivation of Failure Rates and Probability of Failures for the International Space Station Probabilistic Risk Assessment studyDr. Vitali, Roberto / Lutomski, Michael G. et al. | 2004
- 1200
-
PSA for Depressurization Hazards in ISS ModuleSato, Takayuki / Takeuchi, Nobuo / Seike, Takeyoshi / Oga, Koji / Takada, Satomi / Sato, Yoshinobu et al. | 2004
- 1206
-
Nuclear Action Reliability Assessment (NARA): A Data-Based HRA ToolKirwan, Barry / Gibson, Huw / Kennedy, Richard / Edmunds, Jim / Cooksley, Garry / Umbers, Ian et al. | 2004
- 1212
-
Improving the Empirical Basis for Human Reliability Assessment by Simulator ExperimentsBye, Andreas / Braarud, Per Øivind / Smith, Curtis et al. | 2004
- 1219
-
Human Reliability Analysis (HRA) Good PracticesKolaczkowski, Alan / Forester, John / Lois, Erasmia / Parry, Gareth / Bley, Dennis et al. | 2004
- 1226
-
Seismic PSA Studies conducted for Japan’s Light Water ReactorsKondo, Keisuke / Koriyama, Tamio / Nishio, Masahide / Fukuda, Mamoru / Hirano, Mitsumasa et al. | 2004
- 1232
-
Challenges to future Seismic PRAKlügel, J.-U. / Rao, S. / Short, S. et al. | 2004
- 1239
-
Development of Fire Risk Assessment Method Caused by Earthquake (III)Mitomo, N. / Okazaki, T. / Matsuoka, T. et al. | 2004
- 1245
-
Computer Model for Coincidental Failure of Nuclear Power Plants due to Seismic Events in a Multi-Unit SiteHakata, T. et al. | 2004
- 1252
-
Semi-Quantitative Risk Based Technical Assessment for Control Involving Ionizing Radiation Sources Across a Large OrganizationDirector General Nuclear Safety Ellaschuk, Bernard / Director General Nuclear Safety Hugron, Roger / Director General Nuclear Safety Kupca, Stefan et al. | 2004
- 1258
-
Governance of the territory around hazardous industrial plants: decision process and technological riskHubert, Emmanuel / Debray, Bruno / Londiche, Henry et al. | 2004
- 1264
-
Optimised Use of Safety InterventionsSkjong, Rolf / Vanem, Erik et al. | 2004
- 1270
-
Socio-Technical Probabilistic Risk Assessment: Its Capabilities and LimitationsKanki, Barbara G. / Marx, David / Hale, Misti J. et al. | 2004
- 1276
-
The Incorporation of Experience-based Data into the Markov Maintenance Model and an Impact of Changed Maintenance Intervals on Plant ReliabilityOyama, Yoshihiro / Kirimoto, Yukihiro / Yoshida, Tomoaki / Miyata, Koichi / Sakuramoto, Kazuo et al. | 2004
- 1283
-
Neural Networks for Aeronautical Components Maintenance and ManagementFedele, Lorenzo / Tronci, Massimo et al. | 2004
- 1289
-
Power System Fault Data and Time SeriesStojkov, Marinko / Mikuličić, Vladimir / Nikolovski, Srete et al. | 2004
- 1295
-
Implementation of “What-, How- and Why-Learning” in Offshore Drilling PlanningMadsen, Bjørn-Emil / Pollard, Mike / Helgesen, Olav et al. | 2004
- 1302
-
“Smarter Together” in Offshore Drilling -a Successful Action Research Project?Alteren, Bodil / Sveen, Jostein / Guttormsen, Geir / Madsen, Bjørn-Emil / Klev, Roger / Helgesen, Olav et al. | 2004
- 1309
-
Alienation as an Explanatory Factor for Increased Risk on Service Vessels in the North SeaKongsvik, Trond / Bye, Rolf et al. | 2004
- 1315
-
National culture and safe work practice — A comparison between Filipinos and Norwegian seafaring professionalsLamvik, Gunnar Martin / Bye, Rolf et al. | 2004
- 1322
-
Risk-based Planning of Security Measures for the Protection of the Swiss Defence InfrastructureNiederhaeuser, Franz / Christen, Peter / Holenstein, Matthias et al. | 2004
- 1328
-
Security Risk Assessment Methodology for Communities (RAM-CTMJaeger, Cal et al. | 2004
- 1333
-
Managing Infrastructure Security RiskRees, Daniel C. / Rubin, Kenneth I. et al. | 2004
- 1339
-
Behaviour of Market Players and Risk Assessment of Network Congestion in Electric Power Supply SystemToyoda, Junichi / Minazawa, Kazuo / Iwaita, Hiroshi et al. | 2004
- 1345
-
Designing Petri Nets for Systems with Component Failure DependenciesSchneeweiss, Winfrid G. / Rakowsky, Uwe K. et al. | 2004
- 1351
-
Diversity Assessment of Nuclear Power Plants Instrumentation and Control SystemsKharchenko, Vyacheslav / Yastrebenetsky, Michael / Sklyar, Vladimir et al. | 2004
- 1357
-
Safety integrity evaluation framework for fault-tolerant control logic according to IEC 61508Suyama, Koichi et al. | 2004
- 1363
-
A Generalisation of the Beta Factor ModelHokstad, Per et al. | 2004
- 1369
-
Taylor Series Finite Difference for Reliability Assessment at the Design StageZwingmann, Xavier / Aït-Kadi, Daoud / Mutel, Bernard / Coulibaly, Amadou et al. | 2004
- 1375
-
A Practical Method for Accelerated Calculations of System Reliability ParametersMuir, I. / Nanu, L. / Formaniak, A. et al. | 2004
- 1382
-
Conjoint Modelling with Extended Coloured Stochastic Petri Net and Reliability Block Diagram for System AnalysisPozsgai, Peter / Bertsche, Bernd et al. | 2004
- 1388
-
A Neuro-Fuzzy Reliability Optimisation Method Considering Life Cycle CostsSavić, Robert / Rakowsky, Uwe K. et al. | 2004
- 1395
-
Introduction of an Integrated Regulatory Safety Oversight in SwitzerlandSchmocker, U. / Schoen, G. M. / Theiss, K. / Neumann, W. / Keel, A. / Loy, D. et al. | 2004
- 1401
-
Extended Application of PSAs in Regulatory Procedures: Practice and Concept of an Integrated Safety AssessmentSpitzer, Cornelia / Wildermann, Thomas et al. | 2004
- 1408
-
Risk Informed Licensing, Regulation and Safety Management of Nuclear Power Plants In FinlandVirolainen, R. / Sandberg, Jorma et al. | 2004
- 1415
-
Risk-informed Decision Making at the Hungarian Nuclear Safety AuthorityMacsuga, Géza et al. | 2004
- 1421
-
Calibration Study of EurocodesHolický, Milan et al. | 2004
- 1427
-
Structural Reliability Assessment Based on Discrete ApproximationElegbede, Charles et al. | 2004
- 1433
-
Modeling of Random Fatigue Crack Growth LifetimeZou, Xiaoli et al. | 2004
- 1440
-
Methods for Reliability Parameters Estimation and Analysis ToolkitAlzbutas, Robertas et al. | 2004
- 1447
-
Recent Risk Management Initiatives at the European Space Agency — ESA Part 1Preyssl, Christian / Sarah, Maria-Gabriella et al. | 2004
- 1453
-
Recent Risk Management Initiatives at the European Space Agency — ESA Part 2Preyssl, Christian / Sarah, Maria-Gabriella et al. | 2004
- 1459
-
Improvement of Product Robustness by PRA Concept in JAXATohara, Kazuyuki / Yamane, Takashi et al. | 2004
- 1466
-
The Space Shuttle Probabilistic Risk Assessment FrameworkHsu, Feng / Railsback, Jan et al. | 2004
- 1474
-
Simplified HRA modelling compared to detailed modelling, does it give any significant difference of the result for a PSA?Jacobsson, Peter et al. | 2004
- 1480
-
Human Reliability Data from Simulator Experiments: Principles and Context-Sensitive AnalysisCollier, Stephen / Ludvigsen, Jan Tore / Svengren, Håkan et al. | 2004
- 1486
-
Simulator Data Collection Requirements for HRA StudiesSpurgin, Anthony J. / Bareith, Attila / Karsa, Zoltan et al. | 2004
- 1492
-
Use of Simulator Data to Support Nonresponse Human Errors AssessmentsArion, Iulian / Hannaman, George William et al. | 2004
- 1498
-
Guidance for External Events AnalysisKnochenhauer, Michael / Louko, Pekka et al. | 2004
- 1504
-
Stochastic Effects of Potential Lightning Impact on Safety SystemsVarbanov, Velislav / Hauptmanns, Ulrich / Wollenberg, Günter / Steinmetz, Torsten / Zander, Ralf et al. | 2004
- 1510
-
Severe Weather Risk Assessment for Loviisa Power PlantJänkälä, Kalle / Rantalainen, Lauri / Vaurio, Jussi et al. | 2004
- 1516
-
External Events Analysis for Present and Future Nuclear Power Plants — A Regulatory ViewSandberg, Jorma / Virolainen, Reino et al. | 2004
- 1522
-
The Prioritization of Risk Reducing Measures in View of Uncertain Cost/BenefitsBjørkvoll, Thor / Langseth, Helge et al. | 2004
- 1528
-
On the use of expected values in safety managementAbrahamsen, Eirik Bjorheim / Aven, Terje / Vinnem, Jan Erik / Wiencke, Hermann Steen et al. | 2004
- 1534
-
A Risk Determining Model for Hazardous Material Operations: Part IICournoyer, Michael E. et al. | 2004
- 1541
-
CARMA: Food Safety and Expert JudgementFels-Klerx, H. J. / Havelaar, A. H. / Nauta, M. J. / Goossens, L. H. J. / Cooke, R. M. et al. | 2004
- 1547
-
Supporting operational decisions using competing risk models to analyse failure dataBedford, Tim et al. | 2004
- 1553
-
On the Application of PSA Component Reliability and Maintenance Data as a Long Term Safety IndicatorKlügel, Jens-Uwe et al. | 2004
- 1559
-
Aging Effects on Time-Dependent Nuclear Plant Unavailability with Changing Surveillance IntervalOkazaki, Tadatsugi / Aldemir, Tunc et al. | 2004
- 1566
-
The RAMS Analyses in the Face of Ageing. The Bayes ApproachClarotti, Carlo Alberto / Billy, François / Lannoy, André et al. | 2004
- 1572
-
Assessing Challenges to Nuclear Power Plant Management in Five European Countries: Methods, Results and Lessons LearnedKettunen, Jari / Jones, Bethan / Reiman, Teemu et al. | 2004
- 1578
-
Assessing Employee Attitudes towards Behavioural Approaches to Safety Management within UK Reactor PlantsJones, Bethan / Cox, Sue / Rycraft, Helen et al. | 2004
- 1585
-
Socio-Technical Organization and Cognition: A Socio-Organizational Approach to Risk Based Assessment and DesignBlackman, Harold / Gertman, David et al. | 2004
- 1591
-
Organisational learning; a path to safety and efficiencyWahlström, Björn et al. | 2004
- 1597
-
Customer Oriented Dependability Analysis for Relational Database Management SystemsTsopelas, Panagiotis / Violentis, John / Platis, Agapios et al. | 2004
- 1603
-
Designing more Reliable Web Sites with Performability ModelingViolentis, John / Banos, Evangelos / Kaklanis, Nikolaos / Vouros, George / Platis, Agapios et al. | 2004
- 1609
-
A Framework for Analyzing Trust in IT SystemsGórski, Janusz et al. | 2004
- 1615
-
Adapting Business Process Modeling Techniques for Risk Analysis of Computer Based Information SystemsDiergardt, Martin et al. | 2004
- 1621
-
An Approach to Optimizing the Structural Reliability and the Reliability of the Control and Safety System of Wind TurbinesKozine, Igor / Tarp-Johansen, Niels Jacob / Rademakers, L. et al. | 2004
- 1627
-
The Load Matrix — a method for optimising powertrain durability and reliability test programmesDr. Manager Durability Testing Hick, Hannes / Dr. Head of Reliability Engineering Denkmayr, Klaus et al. | 2004
- 1636
-
Ant colonies in optimization of system reliabilityNourelfath, Mustapha / Nahas, Nabil et al. | 2004
- 1642
-
Optimal Scheduling of Reliability Development ActivitiesQuigley, John / Walls, Lesley / Johnson, Walter et al. | 2004
- 1648
-
Safety Goals for Nuclear Materials and Radioactive Wastes — the UK Regulatory ApproachNuclear Installations Inspectorate, Health and Safety Executive Vaughan, Geoffrey J. et al. | 2004
- 1654
-
U.S. Nuclear Regulatory Commission Program on Risk-Informing the Materials and Waste Arenas: Pilot StudiesDamon, Dennis / Lui, Christiana / Gruss, Kimberly / Smith, James / Leslie, Bret / Wong, Albert et al. | 2004
- 1660
-
The U.S. Nuclear Regulatory Commission Program on Risk-Informing the Materials and Waste Arenas: A Decision-Making FrameworkMubayi, Vinod / Bari, Robert A. / Grove, Edward / Azarm, M. Ali / Damon, Dennis R. / Lui, Christiana H. / Shane, Raeann M. et al. | 2004
- 1668
-
Establishment of Quantitative Consequence Analyses Criteria for the Los Alamos National Laboratory Nuclear Materials Technology DivisionRobinson, Mark A. / Lynch, Christina M. / Gordon, Derek J. et al. | 2004
- 1674
-
Application of a Sequential Life Testing with a Truncation Mechanism for an Underlying Three-Parameter Weibull ModelDeSouza, Daniel I. Jr. et al. | 2004
- 1681
-
Reliability Analysis of Temperature Models According to EurocodesMarkova, Jana et al. | 2004
- 1687
-
Stochastic Analysis and Simulation for Seawall Engineering on Qiantang EstuaryWang, Weibiao / Jin, Weiliang / Han, Zengcui / Yu, Tingting et al. | 2004
- 1694
-
Adapting a Dynamic Reliability Model to Measurements using Bayesian InferenceBecker, Günter / Camarinopoulos, Leonidas / Kabranis, Dimitris et al. | 2004
- 1702
-
Application of PRA for Risk-Informed Decision-Making on a Space Station PayloadPaulos, Todd / Flippen, Alexis A. et al. | 2004
- 1708
-
Safety Analysis of Microgravity Science Glove-Box Using the ESA Risk Management ApproachKim, Inn S. / Khatib-Rahbar, Mohsen / Oliefka, Lars / Preyssl, Christian et al. | 2004
- 1714
-
Atmosphere Re-entry Management of BeppoSAX satelliteMiozzo, Agostino / Ambrosetti, Simone / Salvatori, Lorella / Mussoni, Giovanni / Sforza, Carlo / Spaziante, Vincenzo et al. | 2004
- 1720
-
TIMED Orbital Science Mission PRA IntegrationFeldman, Karin / Guarro, Sergio et al. | 2004
- 1727
-
Human Factors Analysis: Central Needs for Practical ApplicationsSpitzer, Cornelia et al. | 2004
- 1734
-
Responsibilities and Challenges of Human Reliability Assessment in the Regulatory FrameworkDr. Sträter, Oliver et al. | 2004
- 1741
-
Some Insights from HRA Related to Low Power and Shutdown ScenariosHolý, Jaroslav et al. | 2004
- 1748
-
Developments in HRA Technology from Nuclear to AerospaceSpurgin, Anthony J. / Frank, M. V. et al. | 2004
- 1754
-
A Plant-Specific Severe Accident Simulator for KKG and First ApplicationsTorri, A. / Klügel, J. U. / Pokorny, V. / Lüttringhaus, U. et al. | 2004
- 1760
-
Development of A Linked Level 1 and Level 2 Plant Model Using the Large Event Tree ApproachXing, Michael / Rao, Shobha / Johnson, David / Klügel, Jens-Uwe et al. | 2004
- 1766
-
Development of a Level 2 PSA Model for the Paks NPPBareith, Attila / Karsa, Zoltán / Lajtha, Gábor / Siklóssy, Péter / Téchy, Zsolt / Elter, József et al. | 2004
- 1772
-
Experimental Assessment of GOTHIC Code for Local Hydrogen Combustion AnalysisLee, Jin-Yong / Lee, Jung-jae / Park, Goon-Cherl / Chung, Suk-Ho et al. | 2004
- 1778
-
Prospects and challenges of risk managementRouhiainen, Veikko / Räikkönen, Timo / Schabel, Jari et al. | 2004
- 1784
-
A Decision Support System for Pollution Control in Cement PlantsMadsen, Henrik / Thyregod, Poul / Vlădicescu, Florin Popentiu / Albeanu, Grigore / Şerbănescu, Liviu et al. | 2004
- 1790
-
Development of a Scenario Analysis Method for the Analysis of Complex ChangesØien, Knut / Bodsberg, Lars / Johnsen, Stig Ole / Steiro, Trygve / Monsen, John et al. | 2004
- 1796
-
Knowledge Based Risk and Quality Management for Feed and FoodDirmeier, Christian et al. | 2004
- 1803
-
Determination of Input Uncertainties of Uncertainty and Sensitivity AnalysesSkorek, Tomasz et al. | 2004
- 1809
-
The DSD and Conventional State/Parameter EstimationWang, Peng / Aldemir, Tunc et al. | 2004
- 1815
-
Thermal-Hydraulic Uncertainty Analysis in the Context of Pressurized Thermal Shock Risk ScenariosChang, Y. H. / Almenas, K. / Mosleh, A. / Bessette, D. et al. | 2004
- 1821
-
An Application of DSD with Recursive Partitioning Scheme to Constant Temperature Power SensorsBurghelea, Andrei / Aldemir, Tunc et al. | 2004
- 1828
-
Leading Safe ChangeSteiro, Trygve / Bjørnsen, Lene / Dørstad, Pernille / Tveiten, Camilla K. et al. | 2004
- 1834
-
HSE Petroleum: Change — Organisation — TechnologyHovden, Jan / Alteren, Bodil / Rosness, Ragnar et al. | 2004
- 1840
-
Organizational Changes in Transport: A Pitfall to Safety?Tveiten, Camilla K. / Jersin, Erik / Steiro, Trygve / Vatn, Jørn et al. | 2004
- 1846
-
How did the Norwegian Railway System Adapt the Existing Experience Based Safety Rules for Traffic Operation to a New Organizational Context and a Risk Based Approach?Blakstad, Helene Cecilie et al. | 2004
- 1852
-
A Comprehensive Approach for Automated Safety and Reliability Analysis of SystemsLiggesmeyer, Peter / Maeckel, Oliver / Siemens, A. G. et al. | 2004
- 1858
-
Fault Detection in Real-Time Software Systems using Neuro-Fuzzy Tools for Signal Validation and DiagnosisThunem, Harald P.-J. / Thunem, Atoosa P.-J. et al. | 2004
- 1864
-
Classification, Analysis and Detection of Interface Inconsistencies in Safety-Relevant Component-based SystemsSaglietti, Francesca / Jung, Martin et al. | 2004
- 1870
-
A Method for Deriving Feared Scenarios in Hybrid SystemsMedjoudj, Malika / Khalfaoui, Sarhane / Demmou, Hamid / Valette, Robert et al. | 2004
- 1876
-
The Study of Reliability Qualification Testing for the Large-scale EquipmentsZhang, Bing-Yan / Zhang, Zhong-yuan et al. | 2004
- 1882
-
Consideration of a Field Stress Distribution for the Reliability Test of Transmission ComponentsMaisch, Matthias / Bertsche, Bernd et al. | 2004
- 1888
-
Fatigue Determination in Case of Spontaneous Failure ModeVogt, Matthias et al. | 2004
- 1894
-
An Advanced Reliability Test Procedure for Gear-Wheels Considering Results Known from Different Gear Transmission RatiosHitziger, Tillmann / Bertsche, Bernd / Krolo, Anna et al. | 2004
- 1900
-
Updating the Regulatory PSA Guidance in Germany Based on Current ApplicationsBerg, Heinz Peter / Fröhmel, Thomas / Görtz, Rudolf et al. | 2004
- 1906
-
Differences Between Full Power Operation and Low Power / Shutdown Operation, and the Implications on the LPSD StandardBley, D. / Burchill, B. / Drouin, M. / Julius, J. / Kiper, K. / Stillwell, B. et al. | 2004
- 1912
-
Insights for Quantitative Risk Assessment of Combined Cycle Power PlantsBallocco, Gabriele / Carpignano, Andrea / Ponte, Elisabetta et al. | 2004
- 1918
-
Risk Guidelines for the Nuclear Materials and Waste ArenasBari, Robert A. / Mubayi, Vinod / Grove, Edward / Azarm, Mohamed A. / Chow, Edward / Rubin, Alan et al. | 2004
- 1924
-
Loss-of-Life Modelling in Risk Acceptance CriteriaLentz, Albrecht / Rackwitz, Rüdiger et al. | 2004
- 1930
-
Relating Lifetime Utility Objectives and Structural SafetyMaes, Marc A. et al. | 2004
- 1936
-
A Multicriteria Approach to Risk AnalysisGelder, Pieter / Duckstein, Lucien / Parent, Eric et al. | 2004
- 1950
-
Application of Probabilistic Risk Assessment (PRA) During Conceptual Design for the NASA Orbital Space Plane (OSP)Rogers, James H. / Safie, Fayssal M. / Stott, James E. / Lo, Yunnhon et al. | 2004
- 1956
-
Launch Vehicle Accident Assessment Framework for Future NASA Nuclear MissionsYau, Michael / Motamed, Majid / Cleary, Brian / Shemanski, Tom et al. | 2004
- 1962
-
Safety Engineering on Alenia Spazio Contribution to Space Station ProgramFerrante, Mario / Canepa, Giovanni / Spazio S.p.A., Alenia / Pesce, Claudio et al. | 2004
- 1969
-
Difference of Concept between Space PRA and Nuclear PRAKojima, Shigeo / Kohda, Takehisa et al. | 2004
- 1976
-
Improved Methodology for the Updated Fire PSA of KKG NPPBecker, Günter / Klügel, Jens-Uwe et al. | 2004
- 1982
-
Development of Fire PSA Methodology and its Application in a Study for Novovoronezh-5 NPPLybarskiy, Artur / Rozin, Vladimir / Kouzmina, Irina / Kazarians, Mardy et al. | 2004
- 1988
-
Fire PSA including fire spreading — Extensive Modelling of all Dependencies of PSA-ComponentsSchmaltz, Hartmut / Rattke, Jörg et al. | 2004
- 1994
-
Underground Fire Risk Assessment Study for a modern Metro System: Integrated Methodology and Application to a Case StudyRaffetti, Andrea / D’Addio, Gian Francesco / Faragona, Beniamino et al. | 2004
- 2001
-
Verification of Load Collectives for the Testing of Automotive Diesel Common Rail SystemsUlrich, Dieter / Bertsche, Bernd et al. | 2004
- 2006
-
Definition and Analysis of a New Risk Priority Number ConceptBraband, Jens et al. | 2004
- 2012
-
Reliability Model of Combined Transportation SystemNowakowski, Tomasz et al. | 2004
- 2018
-
Grouping Model Input Factors to Perform a Sensitivity Analysis Computationally EfficientCariboni, Jessica / Campolongo, Francesca et al. | 2004
- 2024
-
Analytical Framework for Estimation of Uncertainties in Fault TreeShimodaira, Tsuneharu / Kimura, Daisuke / Suyama, Koichi / Sato, Yoshinobu et al. | 2004
- 2030
-
On the Relationship Between the Sensitivity Measures Proposed by Morris and the Variance Based MeasuresCampolongo, Francesca / Cariboni, Jessica et al. | 2004
- 2036
-
Computing the Top Event Uncertainty with Binary Decision DiagramsŠimić, Zdenko / Banov, Reni / Vukovic, Igor / Mikulicic, Vladimir et al. | 2004
- 2042
-
Means-end Models of Safety Related Organizational ProcessesPetersen, Johannes et al. | 2004
- 2048
-
Incorporation of Human and Organizational Factors into Qualitative and Quantitative Risk AnalysesKosmowski, Kazimierz T. et al. | 2004
- 2054
-
US Nuclear Industry Approaches to Managing Human and Organizational FactorsZiebell, David et al. | 2004
- 2060
-
Human and Organizational Contributions to Safety Defences in Offshore Oil ProductionSkjerve, Ann Britt / Rosness, Ragnar / Aase, Karina / Hauge, Stein / Hovden, Jan et al. | 2004
- 2066
-
Bayesian Network-based Proactive MaintenanceMuller, Alexandre / Suhner, Marie-Christine / Iung, Benoît et al. | 2004
- 2072
-
A Model for the Use of Knowledge in Developing Effective Maintenance PoliciesSmart, Alison / Ansell, Jake et al. | 2004
- 2078
-
System Performance Based InspectionDoron, Avinoam et al. | 2004
- 2084
-
The Value of Proper Modeling in Performance and Resources AssessmentDubi, Arie et al. | 2004
- 2090
-
Safety Management Aspects on Automatic Train Operation Control Systems Using Predictive Fuzzy LogicRachel, Flávio / Cugnasca, Paulo et al. | 2004
- 2096
-
The Technique and the Experience of Expertise of Software for NPP Instrumentation and Control SystemsKharchenko, Vyacheslav / Yastrebenetsky, Michael / Sklyar, Vladimir et al. | 2004
- 2102
-
Configuration Management of Railway Vehicles’ Software for a Railway OperatorHeland, Jörg / Albold, Astrid et al. | 2004
- 2107
-
Report on the Comparison of Software Safety ConceptsDr. Schulze, Thorsten / Gutgesell, Juliane et al. | 2004
- 2113
-
Monte Carlo Method Application for Reliability and Availability Analysis of Highly Meshed Network SystemsCarpignano, A. / Salvador, E. / Gargiulo, M. / Piccini, M. et al. | 2004
- 2119
-
Structural Reliability Analysis of a Car Front Cradle with Multiple Design CriteriaDonders, Stijn / Peer, Joost / Schueremans, Luc et al. | 2004
- 2125
-
Fast Reliability Prediction using Weibull DistributionsIon, Roxana A. / Sander, Peter C. et al. | 2004
- 2131
-
On Reliability Improvement of the Port Grain Transport SystemsKwiatuszewska — Sarnecka, Bozena et al. | 2004
- 2137
-
Development of Guidance for “PSA Quality for Applications”Kouzmina, Irina / Niehaus, Friedrich / Ranguelova, Vesselina et al. | 2004
- 2143
-
Addressing the Issue of PRA QualityDrouin, Mary / Parry, Gareth et al. | 2004
- 2149
-
The SKI PSA Review HandbookHallman, Anders / Nyman, Ralph / Knochenhauer, Michael et al. | 2004
- 2155
-
EDF Issues New Guide to Good Methodological Practice for PSA WorkGallois, Marie / Vidal, Serge et al. | 2004
- 2161
-
Optimization Technique for Finding Probabilistic Critical ExcitationAmiri, G. Ghodrati / Ashtari, P. et al. | 2004
- 2167
-
Methodological Approaches on Structural Durability AssessmentKudzys, Antanas / Kvedaras, Audronis Kazimieras / Kliukas, Romualdas et al. | 2004
- 2174
-
Methods for Fitting a 3-Parameter Weibull Distribution on Fracture Toughness DataMarquès, Michel / Pérot, Nadia / Devictor, Nicolas / Saliba, Bérengère et al. | 2004
- 2180
-
Determination of Load and Resistance Factors by Third Moment ApproximationZhao, Yan-Gang / Ang, Alfredo H-S. / Jin, Guihua et al. | 2004
- 2187
-
Launch Vehicle Development Risk Projection MethodologyGuarro, Sergio / Tomei, Edmardo et al. | 2004
- 2193
-
A Probabilistic Analysis of the “Infancy Problem” of Space Launch VehiclesPaté-Cornell, M. Elisabeth / Guikema, Seth D. et al. | 2004
- 2199
-
Physics Based Risk Assessment of Launch VehiclesMaggio, Gaspare / Hark, Frank / Sen, Dev et al. | 2004
- 2206
-
PRA, Patient Safety, and Insights for Quality Improvement in HealthcareWreathall, John et al. | 2004
- 2212
-
The Use of Socio-Technical Probabilistic Risk Assessment at AHRQ and NASABattles, James B. / Kanki, Barbara G. et al. | 2004
- 2218
-
Socio-Technical Probabilistic Risk Assessment: Its Application to Patient SafetyHale, Misti / Slonim, Anthony / Allen, Beverly / Marx, David / Kirkland, Jeff et al. | 2004
- 2224
-
A Framework for Probabilistic Assessment of New Medical TechnologiesPietzsch, Jan B. / Paté-Cornell, M. Elisabeth / Krummel, Thomas M. et al. | 2004
- 2230
-
Development of Fire Risk Evaluation System — System Improvement —Fujii, Masahiko / Miyagi, Kazumi / Iwama, Kazuo / Koshiba, Toshio / Sato, Yoshinobu et al. | 2004
- 2237
-
A Risk Analysis Approach for the Evaluation of Fire Consequences — An Application to High Speed CraftRaffetti, Andrea / Noce, Elisabetta / Carfagna, Emanuela / Pedrali, Mauro et al. | 2004
- 2244
-
PML Probabilistic Assessment for Fire & Explosion Risk in Oil IndustryIwama, Kazuo / Sato, Yoshinobu / Suyama, Koichi / Sumida, Hiroshi et al. | 2004
- 2250
-
How to maintain a reasonable Quality Level in Fire Protection SystemsSchlosser, Ingeborg / Dr. Böke, Joachim / Lüttenberg, Rainhard et al. | 2004
- 2256
-
Reliability Prediction in Railway SignallingRenpenning, Frank et al. | 2004
- 2262
-
Axiomatic Safety-Critical Assessment Process (ASCAP) Risk Assessment of a Transit Signaling SystemCutright, Eric / Ou, Yong / Cao, Yong-Yan / Zhang, Hai / Monfalcone, Marc / Ghaly, Nabil / Giras, Ted et al. | 2004
- 2269
-
Development of a Road Transportation Risks Data Base for Italy: Methodology, Models and ResultsOrlandelli, Carlo Maria / Vestrucci, Paolo et al. | 2004
- 2275
-
Development and Use of the UK Railway Network’s Safety Risk ModelDennis, Colin / Somaiya, Kajal et al. | 2004
- 2283
-
A Study on Uncertainty Analysis of Safety Systems of Advanced Heavy Water Reactor using Fuzzy Set TheoryDurga, Rao K. / Gopika, V. / Prasad, M. H. / Kushwaha, H. S. et al. | 2004
- 2289
-
Modelling and Uncertainty in System Analysis for Safety AssessmentKosmowski, Kazimierz T. et al. | 2004
- 2295
-
An Approach for Assessing of Plant-specific Data VariationLee, Chang-Ju / Sung, Kye-Yong et al. | 2004
- 2301
-
Quantification and Tentative Internalisation of Energy External Costs in the European UnionValdalbero, Domenico Rossetti et al. | 2004
- 2308
-
External Costs from Severe Accidents in Non-Nuclear Fuel Chains: Valuation of Relevant End-PointsHunt, Alistair / Ortiz, Ramon / Markandya, Anil et al. | 2004
- 2314
-
Accident Risks in the Energy Sector: Comparison of Damage Indicators and External CostsHirschberg, Stefan / Burgherr, Peter / Hunt, Alistair et al. | 2004
- 2320
-
Severe Accidents in Fossil Energy Chains: Individual Chain Results and Aggregated EvaluationsBurgherr, Peter / Hirschberg, Stefan et al. | 2004
- 2326
-
Risk-Informed Testing Program for Emergency Diesel GeneratorsHämäläinen, Auli / Jänkälä, Kalle / Vaurio, Jussi et al. | 2004
- 2332
-
Database System for Risk Evaluation in Material DegradationTakahashi, Makoto / Usami, Jun / Tsujimoto, Yousuke / Kitamura, Masaharu et al. | 2004
- 2338
-
Study for the Utilization of PSA for Revised Inspection System in JapanNishio, Masahide / Uchida, Tsuyoshi / Yamashita, Masahiro / Kondo, Keisuke / Koriyama, Tamio / Fukuda, Mamoru et al. | 2004
- 2345
-
Qualitative and Quantitative Analysis of Security in Safety and Reliability Critical SystemsWinther, Rune et al. | 2004
- 2352
-
Safety Assessment for Safety-Critical Systems: A Review and Commentary of the Available TechniquesCarpignano, Andrea / Morisio, Maurizio / Rambaudi, Emanuele et al. | 2004
- 2358
-
Licensing of Software for Safety-critical Applications on the Basis of Operating ExperienceEhrenberger, Wolfgang et al. | 2004
- 2364
-
Criteria for Software Tools Evaluation in the Development of Safety-Critical Real-Time SystemsKornecki, Andrew J. / Zalewski, Janusz et al. | 2004
- 2371
-
A New General Accident TheoryDuffey, Romney et al. | 2004
- 2378
-
On Developing a Risk Analysis Framework for Post-Industrial Age TechnologiesKastenberg, William / Hauser-Kastenberg, Gloria / Norris, David et al. | 2004
- 2384
-
An Integrated Framework for Identification, Classification, and Assessment of Aviation Systems HazardsMosleh, Ali / Dias, A. / Eghbali, G. / Fazen, K. et al. | 2004
- 2391
-
An Entropy-Based Exploration Strategy in Dynamic PRAHu, Yunwei / Groen, Frank / Mosleh, Ali et al. | 2004
- 2398
-
Assessment of Safety-related Systems using Markov ModelLong, Wei / Oshima, Masaki / Zhang, Tieling et al. | 2004
- 2404
-
Probability of Failure on Demand in IEC 61508Shimodaira, Tsuneharu / Takeda, Isamu / Suyama, Koichi / Sato, Yoshinobu et al. | 2004
- 2410
-
Safety Analysis according to IEC 61508 — Putting it into PracticeDr. Braband, Jens / Griebel, Stephan et al. | 2004
- 2416
-
Recent Advances in Risk Based Inspection Planning for StructuresStraub, Daniel / Faber, Michael Havbro et al. | 2004
- 2423
-
Evaluation of Risk Importance and Inspection Methods for Piping SegmentsKohriyama, Tamio / Uchida, Tsuyoshi / Yamashita, Masahiro / Nishio, Masahide / Kondo, Keisuke / Fukuda, Mamoru / Hirano, Mitsumasa et al. | 2004
- 2429
-
Reliability Control of Coolant Measure System in RBMK-1500 Reactor Using Preventive MaintenanceAugutis, Juozas / Matuzas, Vaidas / Uspuras, Eugenijus et al. | 2004
- 2435
-
Optimal Inspection and Replacement Decisions for Multiple Failure ModesKallen, Maarten-Jan / Noortwijk, Jan M. et al. | 2004
- 2441
-
Human Error Risk Management Methodology for Safety Audit of a Large Hospital StructureCacciabue, P. C. / Vella, G. et al. | 2004
- 2448
-
Modeling Techniques and Patient SafetyWilwerding, Jonathan M. / White, Alan / Apostolakis, George / Barach, Paul / Fillipo, Brian H. / Graham, Laura M. et al. | 2004
- 2455
-
Accident and incident analysis in hospitals: how to transfer the RECUPERARE method from nuclear industryMarcellis-Warin, Nathalie / Baumont, Genevieve / Matahri, Naoelle et al. | 2004
- 2462
-
Human Reliability Analysis in Cobalt-Therapy Process using an Adapted ATHEANA Prospective ApproachMc Leod, Jorge Núñez / Barón, Jorge / Rivera, Selva et al. | 2004
- 2468
-
First Experiences Regarding Probabilistic Fire Safety Assessment for Full Power and Low Power/Shutdown Operational StatesBerg, Heinz Peter / Röwekamp, Marina / Türschmann, Michael / Linden, Joachim et al. | 2004
- 2474
-
PRA Modelling Under Elevated Ambient TemperatureHe, Wei G. et al. | 2004
- 2481
-
Cable Failure Modes and Effects Risk Analysis PerspectivesNowlen, Steven P. et al. | 2004
- 2487
-
A PRA Approach to Evaluate Post-Fire Safe Shutdown Capacity for Risk-Informed Fire Analysis in TaiwanWu, Ching-Hui / Lin, Tsu-Jen / Kao, Tsu-Mu et al. | 2004
- 2493
-
Quantitative Transport Risk Analysis on a Regional Scale: An Application of TRAT-GIS to East SicilyMaschio, Giuseppe / Milazzo, Maria Francesca / Antonioni, Giacomo / Spadoni, Gigliola et al. | 2004
- 2499
-
Advanced Spatial Modelling for Risk Analysis of Transportation Dangerous GoodsGheorghe, Adrian V. / Birchmeier, Jürg / Kröger, Wolfgang / Vamanu, Dan V. / Vamanu, Bogdan et al. | 2004
- 2505
-
The use of HazOp and Fault Tree techniques for the assessment of non-accident induced release frequencies in the transport of hazardous substancesCozzani, Valerio / Spadoni, Gigliola / Giusti, Silvia / Zanelli, Severino et al. | 2004
- 2511
-
A Hierarchical Uncertainty Model, Combination Rules and Uncertainty PropagationKozine, Igor et al. | 2004
- 2517
-
Reliability Analysis of Automotive Systems: Quantification of Data UncertaintyWoltereck, Martin M. / Vollmar, Ralph et al. | 2004
- 2524
-
Parameter Uncertainty in Level 1 PSA Model of Krško NPP with Focus on CCFVrbanić, Ivan / Cizelj, Romana Jordan et al. | 2004
- 2531
-
Stratified Sampling for Estimating Reliability Quantiles for a Thermohydraulic TransientArdillon, Emmanuel et al. | 2004
- 2537
-
A Multi-Criteria Approach for the Classification of EU Countries with Respect to their Progress Towards Sustainable DevelopmentDiakoulaki, D. / Mavrotas, G. et al. | 2004
- 2544
-
Social Assessment of Regional Energy ScenariosRenn, Ortwin et al. | 2004
- 2552
-
An Integrated Decision-Support Tool for Sustainable Energy SupplyHirschberg, Stefan / Dones, Roberto / Burgherr, Peter / Heck, Thomas / Schenler, Warren et al. | 2004
- 2558
-
Assessing the Sustainability of Heavy Metal Emissions in EuropeBachmann, Till M. / Droste-Franke, Bert / Friedrich, Rainer et al. | 2004
- 2564
-
Markov Model Analysis for Efficient Plant MaintenanceMuta, Hitoshi / Tomohisa, Yasuhiko / Sato, Yoshinobu et al. | 2004
- 2570
-
Modelling the Degrading Failure of a Rail Section Under Periodic InspectionPodofillini, Luca / Zio, Enrico / Vatn, Jørn et al. | 2004
- 2576
-
Method to optimize the test and maintenance activity of stand by safety systemsCaira, Marco / Gambellini, Alberto et al. | 2004
- 2584
-
Maintenance Improvement of an Aircraft Fleet by a Software Method Based on Reliability CriteriaRighini, Renzo / Marcodini, Giuseppe / Treves, Daniele / Vopa, Pietro La et al. | 2004
- 2591
-
Long-term Radioactive Waste Management: Challenges and Approaches to Regulatory Decision MakingChair of Environmental Sciences: Natural and Social Science Interface (UNS) Flüeler, Thomas et al. | 2004
- 2597
-
Management of Uncertainty and Risk in Safety Cases for Radioactive Waste Disposal: Summary of an OECD/NEA Workshop held in Stockholm February 2004Dverstorp, Björn / Wilmot, Roger D. / Voinis, Sylvie et al. | 2004
- 2603
-
The Role of Probabilistic Safety Analysis in Radioactive Waste Management — A UK Regulatory ViewNuclear Installations Inspectorate, Health and Safety Executive Vaughan, Geoffrey J. et al. | 2004
- 2609
-
What Role for Performance Assessment?Reiter, Leon et al. | 2004
- 2616
-
Application of ALARP Principle in DesignTrbojevic, Vladimir et al. | 2004
- 2622
-
Quantifying the safety degradation that an external initiator induces upon a complex facilityArgirov, Julian P. et al. | 2004
- 2628
-
Hurricane Loss Estimation ModelPinelli, Jean-Paul / Murphree, Josh / Subramanian, Chelakara / Gurley, Kurt / Cope, Anne / Hamid, Shahid / Gulati, Sneh et al. | 2004
- 2635
-
Risk Monitoring SystemsKafka, Peter et al. | 2004
- 2641
-
Experiences from Implementing a Risk Monitor at OKGBäckström, O. / Augustsson, T. et al. | 2004
- 2647
-
Integration of LERF Calculation Capability into the Second Generation of Taiwan’s NPP Risk MonitorKao, Tsu-Mu / Lin, Jyh-Der / Chao, Chun-Chang et al. | 2004
- 2654
-
Status and Actual Risk Monitoring in a NPP Reactor Protection SystemVarga, István / Bartha, Tamás / Szabó, Géza / Kiss, Bálint et al. | 2004
- 2660
-
The Dutch Model for the Quantitative Risk Analysis of Road TunnelsBrussaard, L. A. / Kruiskamp, M. M. / Essink, M. P. Oude et al. | 2004
- 2666
-
A method for the estimation of casualties caused by accidents in tunnelsJonkman, S. N. et al. | 2004
- 2673
-
Tunnel Safety: two Approaches to consider Risks in Freight Railway TunnelsRosmuller, Nils / Ale, Ben et al. | 2004
- 2680
-
Three-Dimensional Individual and Group Risk Approach of Buildings above Roads and Railways during ExploitationSuddle, S. I. et al. | 2004
- 2687
-
Development of Management of Change(MOC) Software for Small and Medium Sized Chemical PlantsKim, Jaehyun / Lee, Jaeyeol / Kim, Kiyoung / Kim, Yunhwa / Baek, Jongbae et al. | 2004
- 2693
-
Risk Matrix as Tool for Risk Assessment in the Chemical Process IndustriesDr. Ruge, Bernd et al. | 2004
- 2699
-
An Integrated Safety for Business Analyses of Process PlantsDr. Reinders, J. E. A. / Dr. Kamperveen, J. P. et al. | 2004
- 2706
-
A Practical Method for Reviewing Safety Studies of Process PlantsPapazoglou, I. A. / Giakoumatos, I. / Aneziris, O. N. et al. | 2004
- 2711
-
Two Kinds of Error?Professor of Safety Science Director of Research Senders, John W. et al. | 2004
- 2714
-
Analysing Medical Incident Reports by Use of a Human Error TaxonomyItoh, Kenji / Andersen, Henning Boje et al. | 2004
- 2720
-
Hospital Staff Attitudes to Models of Reporting Adverse Events: Implications for LegislationAndersen, Henning Boje / Hermann, Niels / Madsen, Marlene D. / Østergaard, Doris / Schiøler, Thomas et al. | 2004
- 2726
-
The Ongoing Joint U.S. NRC/EPRI Fire Risk Requantification StudyHyslop, J. S. / Kassawara, Robert P. / Nowlen, Steven P. / Najafi, Bijan et al. | 2004
- 2732
-
Methods Advances in the EPRI/USNRC Fire Risk Requantification Study — Fire ModelingNowlen, Steven P. / Najafi, Bijan / Kazarians, Mardy / Joglar-Billoch, Francisco et al. | 2004
- 2738
-
Fire Risk Requantification Study — Fire Ignition FrequenciesKazarians, Mardy / Joglar, Francisco / Nowlen, Steve P. / Najafi, Bijan et al. | 2004
- 2744
-
Methods Advances in EPRI/NRC Fire Risk Re-quantification Project: Modeling of Post-Fire Safe Shutdown in Fire PRANajafi, Bijan / Kolaczkowski, Alan / Funk, Daniel / Wyant, Frank / Forrester, John / Hannaman, William G. / Anoba, Richard et al. | 2004
- 2751
-
Safety Functions in Railways — a Structural Analysis of Safety RulesHarms-Ringdahl, Lars / Kecklund, Lena et al. | 2004
- 2758
-
A View and Movement of the Safety and Reliability in Railways of JapanOgino, Takahiko / Akita, Katsuji / Hirao, Yuji et al. | 2004
- 2765
-
A Comparison of Data-Driven and Model-Based Approaches to Quantifying Railway RiskBedford, Tim / Quigley, John / French, Simon et al. | 2004
- 2772
-
Scenario Analysis, a Safety Engineering Design ToolKuiken, M. J. / Stoop, J. A. / Ijsselstijn, S. et al. | 2004
- 2778
-
Uncertainties and Transformation Principles in PSAWagenknecht, Michael / Gocht, Ulrike et al. | 2004
- 2784
-
Non-Parametric Continuous Bayesian Belief Nets with Expert JudgementKurowicka, Dorota / Cooke, Roger et al. | 2004
- 2791
-
Probabilistic Uncertainty Analysis Applied to Fuel Rod DesignWensauer, Andreas / Distler, Ingrid / Heins, Lothar et al. | 2004
- 2797
-
Insurance EngineeringKarydas, Dimitrios et al. | 2004
- 2803
-
Damage Compensation and Risk-Informed Regulation: Status and Trends in the EUKirchsteiger, Christian et al. | 2004
- 2809
-
Credibility in risk assessmentBusby, J. S. / Alcock, R. E. / Hughes, E. J. et al. | 2004
- 2815
-
Liability and Controlling Technological Risks. Ethical and Decision Theoretical FoundationsZandvoort, Henk et al. | 2004
- 2821
-
Importance of assessing effectiveness of repair in obtaining an optimal maintenance strategy for repairable assetsAl-Doori, Mulhim / Ansell, Jake / Archibald, Thomas / Thomas, Lyn et al. | 2004
- 2827
-
An MILP Model for Medium-term Production and Maintenance ManagementPixopoulou, Nathalie / Papageorgiou, Lazaros G. et al. | 2004
- 2833
-
Effect of false alarms on the optimisation of the maintenance decisionsBarros, Anne / Bérenguer, Christophe / Grall, Antoine et al. | 2004
- 2840
-
A Joint Spare-Provisioning and Preventive Maintenance Strategy for Availability Maximization under Limited ResourcesDiallo, Claver / Aït-Kadi, Daoud / Chelbi, Anis et al. | 2004
- 2847
-
The Use of Trivial Reductions of Dimensionality in the Propagation of Uncertainties: A Radioactive Contaminant Transport Model ExampleLavin, Ricardo Bolado / McWilliams, José Mira et al. | 2004
- 2854
-
Role of Component Sensitivity Analysis in the Risk Assessment of a Large and Complex SystemMohanty, Sitakanta / Sagar, Budhi / Janetzke, Ron / Wittmeyer, Gordon / Patrick, Wesley et al. | 2004
- 2860
-
The Interpretation of Risk and Sensitivity Under the Peak-of-the-Mean ConceptCodell, Richard / Esh, David / Mohanty, Sitakanta et al. | 2004
- 2866
-
Application of Bayesian Network Considering the Special Dependency to Stochastic EventsLee, Chang-Ju / Lee, Kun-Jai et al. | 2004
- 2872
-
A Method for Finding Prime Implicants in Incoherent Fault Trees by Use of Commonly Available Tools for Minimal Cut Set Analysis in Coherent Fault TreesPuhr-Westerheide, Peter et al. | 2004
- 2881
-
Systematic Approach for Capturing Inter-phase Failure Combinations in an Integrated, Multiphase Linked Fault Tree Model of the Space ShuttleBigler, Mark / Stewart, Michael et al. | 2004
- 2888
-
Accident Sequence Analysis of Fault Tree with Event Sequence DependencyKohda, Takehisa / Cui, Weimin / Inoue, Koichi et al. | 2004
- 2894
-
International PSA Developments The OECD/NEA ViewpointLanore, Jeanne-Marie / Kaufer, Barry / Versteeg, Magiel F. / Gelder, Pieter / Shepherd, Charles et al. | 2004
- 2900
-
Applications of Probabilistic Safety Assessment in the Nuclear Power Plant Philippsburg (KKP)Singh, J. B. et al. | 2004
- 2908
-
The ASME PRA Standard and the HCPRA UpdateHe, W. G. / Burns, E. T. et al. | 2004
- 2914
-
Evolution of NPP Design from a PSA standpointKang, Sun-Koo / Lim, Hakkyu / Jung, Gie Jin / Park, Ki Seung et al. | 2004
- 2920
-
Statistical Resampling in Assessing External Threats to StructuresVaidogas, Egidijus R. et al. | 2004
- 2926
-
Stochastic Prediction of Seismic Ground Motions Using Macro-Spatial Correlation ModelTakada, Tsuyoshi / Shimomura, Tetsuo et al. | 2004
- 2932
-
Optimal Intensity Measures for the Characterization of the Ground Motion in Performance-Based Seismic DesignCiampoli, Marcello / Giovenale, Paolo et al. | 2004
- 2938
-
Probabilistic Performance Criteria for Tall Buildings Subjected to WindDiniz, Sofia / Iancovici, Mihai / Riley, Michael / Simiu, Emil et al. | 2004
- 2944
-
A Quantitative Risk Analysis Model of Scenarios Characterised by Explosion Fragments and MissilesMaschio, Giuseppe / Cambria, Domenica / Lisi, Roberto / Milazzo, Maria Francesca et al. | 2004
- 2950
-
Damage Assessment of Industrial Accidents by Frequency-Magnitude CurveHanayasu, Shigeo / Sekine, Kazuyoshi et al. | 2004
- 2956
-
Integrated Dynamic Decision Analysis (IDDA): an Advanced Tool for Risk AnalysisDemichela, Micaela / Piccinini, Norberto et al. | 2004
- 2962
-
Global assessment of the technological risks relative to the transport and the storage of chemical productsDefert, Raphaël / Ruffin, Emmanuel et al. | 2004
- 2967
-
How Cognitive Artifact Support of Acute Care Distributed Cognition Affects Patient SafetyNemeth, Christopher P. / Cook, Richard I. / O’Connor, Michael / Klock, P. Allan et al. | 2004
- 2973
-
An Object-Oriented Risk Management tool for Communicable Disease Control in the UKGelletlie, Ruth / Schweiger, Martin / Barnes, Howard / Hamilton, Robert / Kara-Zaitri, Chakib et al. | 2004
- 2979
-
Hospitals and Health Care Facilities: Guidelines for the implementation of an effective Safety and Health Management SystemRomano, Alfredo / Pinetti, Giovanni / Fiorentini, Luca / Scarpellini, Sonia Maria et al. | 2004
- 2985
-
Risk Analysis for Mobile Telephony in a HospitalNordland, Odd et al. | 2004
- 2991
-
Modelling of Failing Reactivity Control in PSA for Barsebäck 2Ingemarson, Ingemar / Olsson, Lars / Bäckström, Ola et al. | 2004
- 2997
-
An Approach to Estimate SBO Risks in Multi-unit Nuclear Power Plants with a Shared Alternate AC Power SourceJung, Woo Sik / Yang, Joon-Eon / Ha, Jaejoo et al. | 2004
- 3003
-
Specifying the frequency of an initiator threatening the safety of a complex system where the available data is not directly relevantArgirov, Julian et al. | 2004
- 3009
-
An Analysis of Source Term Reduction by Implementing Accident Management Measures to BWR-5 PlantSumida, Susumu / Funayama, Kyoko / Kajimoto, Mitsuhiro / Tanaka, Nobuo et al. | 2004
- 3016
-
An Assessment of Fire Services at a PortRao, Shobha B. / Salter, James / Grenier, Andrew T. et al. | 2004
- 3022
-
Risk Based Decision Model for Maximal Ship Entry to the PortsGucma, Lucjan et al. | 2004
- 3028
-
Reliability Improvement of Transportation Systems in their Operation ProcessesBlokus, Agnieszka et al. | 2004
- 3034
-
Availability Improvement of Port Transportation Structures in Their Operation ProcessesKołowrocki, Krzysztof et al. | 2004
- 3040
-
Reliability-Adaptive Control of Tool Wear in Transfer LinesDietl, Clemens / Rakowsky, Uwe K. et al. | 2004
- 3048
-
Statistical Process Control Procedures in Relation with Reliability EngineeringRamalhoto, Maria Fernanda / Göb, Rainer / Pievatolo, Antonio / Evandt, Oystein et al. | 2004
- 3054
-
Reliability Evaluation for an Oxygen Generator in an Air-conditioner by Accelerated Life TestingJo, Yuri / Park, Sangjun / Lee, Seongsoo / Park, Sangdeuk et al. | 2004
- 3060
-
Dictionary of Elementary Effects (DELEE): Application to the Functional Requirements of Industrial SystemsRohmer, Serge / Amoussou, Guy Alain et al. | 2004
- 3066
-
Case Studies in Italy of Potential additional Safety Measures for the Purpose of Land-Use PlanningGagliardi, Roberta Valentina / Ludovisi, Giancarlo et al. | 2004
- 3072
-
Towards an evolution of risk assessment and land-use planning (LUP) approaches in FranceSalvi, Olivier / Rodrigues, Nelson / Descourrière, Sandrine / Gaston, Didier et al. | 2004
- 3079
-
Flood Forecast Model and Probabilistic AnalysisVolskiene, Jurgita Simaityte / Uspuras, Eugenijus / Augutis, Juozas et al. | 2004
- 3086
-
Development of European Guidance and a Common Risk/Hazard Assessment Database for Land-Use Planning in the Context of Major Accident HazardsChristou, Michalis / Struckl, Michael / Duffield, Stuart / Salvi, Olivier / Bernuchon, Emmanuel / Post, Jos / Beerens, Herlinde et al. | 2004
- 3092
-
Optimizing Pooled Power Plant Spare PartsHall, Stephen / Doron, Avinoam et al. | 2004
- 3098
-
Monte Carlo Optimization of the Replacement Strategy of Components subject to Technological ObsolescenceMichel, Odile / Labeau, Pierre-Etienne / Mercier, Sophie et al. | 2004
- 3104
-
Universal Moment Generating Function and Stochastic Petri Nets to Redundancy Optimization for Multi-State Systems under Repair PoliciesNourelfath, Mustapha / Dutuit, Yves et al. | 2004
- 3110
-
The MicMaq Project: Minimum cost — Maximum quality for the Maintenance Optimization of the Belgian Power SystemFouathia, Ouahab / Maun, Jean-Claude / Labeau, Pierre-Etienne / Wiot, Didier et al. | 2004
- 3116
-
Morsleben Nuclear Waste Repository Probabilistic Safety Assessment of the Long-Term SafetyResele, Georg / Niemeyer, Matthias / Jaquet, Olivier / Wollrath, Jürgen et al. | 2004
- 3123
-
Sensitivity Analysis of an Engineered Barrier System Model for the Potential Repository System in the United StatesPensado, Osvaldo / Sagar, Budhi et al. | 2004