An integrated joint optimization procedure for robust and tolerance design (English)
National licence
- New search for: Cho, B. -R.
- New search for: Kim, Y. J.
- New search for: Kimbler, D. L.
- New search for: Phillips, M. D.
- New search for: Cho, B. -R.
- New search for: Kim, Y. J.
- New search for: Kimbler, D. L.
- New search for: Phillips, M. D.
In:
International Journal of Production Research
;
38
, 10
;
2309-2325
;
2000
- Article (Journal) / Electronic Resource
-
Title:An integrated joint optimization procedure for robust and tolerance design
-
Contributors:Cho, B. -R. ( author ) / Kim, Y. J. ( author ) / Kimbler, D. L. ( author ) / Phillips, M. D. ( author )
-
Published in:International Journal of Production Research ; 38, 10 ; 2309-2325
-
Publisher:
- New search for: Taylor & Francis
-
Publication date:2000-01-01
-
Size:17 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:English
-
Source:
Table of contents – Volume 38, Issue 10
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 2155
-
Performance evaluation of an auction-based manufacturing system using coloured Petri netsNandula, Murali / Dutta, S. P. et al. | 2000
- 2173
-
Scheduling a batch processing machine with non-identical job sizesAzizoglu, Meral / Webster, Scott et al. | 2000
- 2185
-
An algorithm for optimising the servicing of products with constrained, multiple defectsLye, S. W. / Lee, S. G. / Khoo, M. K. et al. | 2000
- 2201
-
Modelling the relationship between process parameters and mechanical properties using Bayesian neural networks for powder metal partsCherian, R. P. / Midha, P. S. / Pipe, A. G. et al. | 2000
- 2215
-
Automated accessibility analysis and measurement clustering for CMMsVafaeesefat, Abbas / Elmaraghy, Hoda A. et al. | 2000
- 2233
-
Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up timesRadhakrishnan, Sanjay / Ventura, Jose A. et al. | 2000
- 2253
-
Fuzzy mapping of functions onto features in detail designFeng, Chang-Xue / Kroll, Dennis E. / Li, Pei-Gen et al. | 2000
- 2273
-
A stochastic model of a reconfigurable manufacturing system Part 1: A frameworkXiaobo, Zhao / Jiancai, Wang / Zhenbi, Luo et al. | 2000
- 2287
-
Rolling-horizon lot-sizing when set-up times are sequence-dependentClark, Alistair R. / Clark, Simon J. et al. | 2000
- 2309
-
An integrated joint optimization procedure for robust and tolerance designCho, B. -R. / Kim, Y. J. / Kimbler, D. L. / Phillips, M. D. et al. | 2000
- 2327
-
Cellular manufacturing system design using a holonistic approachAkturk, M. Selim / Turkcan, Ayten et al. | 2000
- 2349
-
Dispatching rules for scheduling in assembly jobshops - Part 2Reeja, Marath K. / Rajendran, Chandrasekharan et al. | 2000