Upgrading existing TERN road tunnels to current needs. Taking the Arlbergtunnel as an example (English)
- New search for: Bacher, M.
- New search for: Sturm, P.J.
- New search for: Bacher, M.
- New search for: Sturm, P.J.
In:
International Conference Tunnel Safety and Ventilation, 7, Tagung Sicherheit und Belüftung von Tunnelanlagen, 7
;
28-37
;
2014
-
ISBN:
- Conference paper / Print
-
Title:Upgrading existing TERN road tunnels to current needs. Taking the Arlbergtunnel as an example
-
Contributors:Bacher, M. ( author ) / Sturm, P.J. ( author )
-
Published in:
-
Publisher:
- New search for: TU Graz
-
Place of publication:Graz
-
Publication date:2014
-
Size:10 Seiten, Bilder, 6 Quellen
-
ISBN:
-
Type of media:Conference paper
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
Table of contents conference proceedings
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 1
-
Implementation of the EU directive on minimum safety requirements for tunnels in the trans-european road network - status reportWiesholzer, S. et al. | 2014
- 5
-
How frequent are fires in tunnels - analysis from Austrian tunnel incident statisticsRattei, G. / Lentz, A. / Kohl, B. et al. | 2014
- 12
-
Technical trade-offs using fixed fire fighting systemsIngason, H. / Li, Y.Z. et al. | 2014
- 20
-
With high speed to a safe emergency handling - Vienna - St. Pölten tunnel high-speed lineDiernhofer, F. / Sommerlechner, C. / Flößleitner, B. et al. | 2014
- 28
-
Upgrading existing TERN road tunnels to current needs. Taking the Arlbergtunnel as an exampleBacher, M. / Sturm, P.J. et al. | 2014
- 38
-
Control of the tunnel-ventilation system in the northern link (Norra Länken) in StockholmElertson, Lars et al. | 2014
- 44
-
Automatic responses when something happens: what should be implemented in the futureAralt, Tor Tybring et al. | 2014
- 50
-
Safety integrated. How much safety lies within tunnel automation?Raffeiner, R. / Pfeiffer, T. et al. | 2014
- 58
-
Monitoring centres - a developmental journey into the next decadeWaltl, Anton / Reiter, Anton et al. | 2014
- 65
-
Real-tme estimation of heat release rates in tunnel firesNakahori, Ichiro / Sakaguchi, Toshiaki / Nakano, Ami / Mitani, Atsushi / Vardy, A.E. et al. | 2014
- 75
-
Provisions for reliable and effective smoke detection in road tunnelsBuchmann, R. / Ruckstuhl, R. et al. | 2014
- 83
-
A unique technology for early fire detection in tunnel environmentsRiemer, Ernst / Romnäs, Christoffer et al. | 2014
- 87
-
Early fire detection in swiss road tunnels with more than 1500 fireguard sensorsSchuldt, W.W. et al. | 2014
- 94
-
Airflow measurement in road tunnelsGrässlin, U. / Drost, U. / Nodiroli, G.P. et al. | 2014
- 102
-
Analysis of a 10 MW fire in an underground railway station using full scale tests and CFDRodler, J. / Bassler, A. / Schnell, E. et al. | 2014
- 110
-
Air barriers usef for separating smoke free zones in case of fire in tunnelKrajewski, Gregory et al. | 2014
- 118
-
Evaluating smoke recirculation potential at the portal of a Swiss road tunnel in case of a fireYousaf, R. / Gehrig, S. / Buchmann, R. et al. | 2014
- 126
-
The effect of fixed smoke barriers on evacuation environment in road tunnel fires with natural ventilationSeike, M. / Kawabata, N. / Hasegawa, M. et al. | 2014
- 133
-
Study for safety at a relatively short tunnel when a tunnel fire occurredMikame, Y. / Kawabata, N. / Seike, M. / Hasegawa, M. et al. | 2014
- 140
-
Effectivness of implementation draught relief shaft in subway railway tunnelsShahrvari, S. / Dashti, H. / Damirchi, K. et al. | 2014
- 148
-
Standardizing the technical and structural specification of doors in tunnelsZierl, D. / Liebwald, K. / Rossbacher, L. / Ebner, M. et al. | 2014
- 156
-
Folgoso tunnel refurbishment works: features and challengesPortugues, F. / Piris, J.M. / Alonso, J. / Tobar, M. / Gomez, L. / Gonzalo, L.M. et al. | 2014
- 164
-
Fire, risk and project governanceStacey, C.H.B. et al. | 2014
- 170
-
Upgrading of the Austrian tunnel risk model TuRisMo - methodical and practical aspectsKohl, B. / Forster, C. / Wiesholzer, S. et al. | 2014
- 180
-
Development of a risk assessment method for fire in rail tunnelsWeyenberge, Bart van / Deckers, Xavier et al. | 2014
- 190
-
Fixed firefighting systems in road tunnels - general requirements and capabilitiesWierer, A. / Sperling, S. / Patigler, M. et al. | 2014
- 195
-
Improving ventilation and passive protection with FFFSRothe, Rajko / Lakkonen, Max / Sprakel, Dirk et al. | 2014
- 203
-
Comparison of deluge and water mist systems from a performance and practical point of viewLakkonen, M. / Sprakel, D. / Feltmann, A. et al. | 2014
- 213
-
Ventilation and escape facilities for short cut-and-cover urban tunnelsBettelini, M. / Rigert, S. et al. | 2014
- 221
-
High temperature testing and certification of fans for tunnel ventilationVemden, F. van et al. | 2014
- 229
-
European directive: guidelines for tunnel safety officers in the french contextAlain, Picard et al. | 2014
- 234
-
Increased tunnel availability through model based decision supportOerlemans, D.C. / Worm, E.W. et al. | 2014
- 242
-
Risk based maintenance in Swiss road tunnels. Analysis, finding and implementationsMellert, L.D. / Zbinden, M. / Welte, U. et al. | 2014
- 250
-
On the four elements of tunnel safety: fire, air, water and earthBrandt, R. et al. | 2014
- 257
-
Transition of Japanese road tunnels ventilation and smoke exhaust in tunnel firesYamada, Masahisa / Kawabata, Nobuyoshi / Kikumoto, Tomoki et al. | 2014
- 265
-
Influence of fires on - air velocity measurements at downstream measurement locationsRafiei, M. / Sturm, P.J. et al. | 2014