Tunnelling for the third section of the Stadtbahn line U12 in Stuttgart (English)
- New search for: Gradnik, Richard
- New search for: Kicherer, Manfred
- New search for: Zwick, Markus
- New search for: Gradnik, Richard
- New search for: Kicherer, Manfred
- New search for: Zwick, Markus
In:
Geomechanik und Tunnelbau - Geomechanics and Tunnelling
;
7
, 5
;
481-490
;
2014
-
ISSN:
- Article (Journal) / Print
-
Title:Tunnelling for the third section of the Stadtbahn line U12 in Stuttgart
-
Additional title:Der Vortrieb für den dritten Teilabschnitt der Stadtbahnline U12 in Stuttgart
-
Contributors:
-
Published in:Geomechanik und Tunnelbau - Geomechanics and Tunnelling ; 7, 5 ; 481-490
-
Publisher:
-
Publication date:2014
-
Size:10 Seiten, 9 Bilder, 3 Tabellen, 4 Quellen
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Print
-
Language:English
-
Keywords:
-
Source:
Table of contents – Volume 7, Issue 5
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 385
-
Content: Geomechanics and Tunnelling 5/2014| 2014
- 389
-
63rd Geomechanics Colloquium / 63. Geomechanik KolloquiumSchubert, Wulf et al. | 2014
- 390
-
News: Geomechanics and Tunnelling 5/2014| 2014
- 402
-
Tunnel spoil – New technologies on the way from waste to raw material / Tunnelausbruch – Neue Technologien für den Weg vom Abfall zum RohstoffErben, Hartmut / Galler, Robert et al. | 2014
- 402
-
Tunnel spoil – New technologies on the way from waste to raw materialErben, Hartmut / Galler, Robert et al. | 2014
- 411
-
Waste law framework for the recovery of material excavated from tunnelsDanzer, Mathilde et al. | 2014
- 411
-
Waste law framework for the recovery of material excavated from tunnels / Abfallrechtliche Rahmenbedingungen für die Verwertung von TunnelausbruchmaterialDanzer, Mathilde et al. | 2014
- 419
-
Tunnel spoil: Tipping or the end of the definition as waste / Tunnelausbruch: Deponierung oder AbfallendeReichel, Paul et al. | 2014
- 419
-
Tunnel spoil: Tipping or the end of the definition as wasteReichel, Paul et al. | 2014
- 428
-
Tunnel spoil as a source of raw materials for an autobahn – Sustainable reuse of resources through the example of the S 10Mlinar, Christian / Sempelmann, Franz / Koch, Gerhard / Steiner, Michael / Kubin, Florian et al. | 2014
- 428
-
Tunnel spoil as a source of raw materials for an autobahn – Sustainable reuse of resources through the example of the S 10 / Tunnelausbruch als Rohstoffquelle für eine Autobahn – Nachhaltige Ressourcenverwertung am Beispiel der S 10Mlinar, Christian / Sempelmann, Franz / Koch, Gerhard / Steiner, Michael / Kubin, Florian et al. | 2014
- 437
-
Tunnel excavation – The conflict between waste and recycling through the example of the Koralm Tunnel, contract KAT2Posch, Helmut / Murr, Roland / Huber, Helmut / Kager, Matthias / Kolb, Erich et al. | 2014
- 437
-
Tunnel excavation – The conflict between waste and recycling through the example of the Koralm Tunnel, contract KAT2 / Tunnelausbruch – Das Spannungsfeld zwischen Abfall und Verwertung am Beispiel Koralmtunnel, Baulos KAT2Posch, Helmut / Murr, Roland / Huber, Helmut / Kager, Matthias / Kolb, Erich et al. | 2014
- 451
-
Tunnel excavation material as resource for underground power plants and concrete dam constructionsRaderbauer, Bernd / Wyss, Alexander et al. | 2014
- 451
-
Tunnel excavation material as resource for underground power plants and concrete dam constructions / Tunnelausbruch als Rohstoff für den unterirdischen Kraftwerks‐ sowie Staumauerbau im HochgebirgeRaderbauer, Bernd / Wyss, Alexander et al. | 2014
- 461
-
Full face excavation in difficult groundLunardi, Pietro / Barla, Giovanni et al. | 2014
- 469
-
Full-face versus sequential excavation – A case study of the Chamoise Tunnel (France)Putz-Perrier, Martin Wilhelm / Gilleron, Nicolas / Bourgeois, Emmanuel / Saitta, Adrien et al. | 2014
- 469
-
Full‐face versus sequential excavation – A case study of the Chamoise Tunnel (France) / Vollausbruch versus Teilausbruch – Eine Fallstudie vom Chamoisetunnel (Frankreich)Putz‐Perrier, Martin Wilhelm / Gilleron, Nicolas / Bourgeois, Emmanuel / Saitta, Adrien et al. | 2014
- 481
-
Tunnelling for the third section of the Stadtbahn line U12 in Stuttgart / Der Vortrieb für den dritten Teilabschnitt der Stadtbahnline U12 in StuttgartGradnik, Richard / Kicherer, Manfred / Zwick, Markus et al. | 2014
- 481
-
Tunnelling for the third section of the Stadtbahn line U12 in StuttgartGradnik, Richard / Kicherer, Manfred / Zwick, Markus et al. | 2014
- 491
-
Full face versus partial face in NATM tunnelling / Vollausbruch versus Teilausbruch bei der NÖTGamper, Christian et al. | 2014
- 491
-
Full face versus partial face in NATM tunnellingGamper, Christian et al. | 2014
- 503
-
Geotechnical and construction operational criteria for the selection of full or partial-face excavationSchubert, Peter / Voringer, Jürgen / Hofmann, Bernd et al. | 2014
- 503
-
Geotechnical and construction operational criteria for the selection of full or partial‐face excavation / Kriterien zur Wahl von Voll‐ oder Teilausbruch aus geotechnischer und baubetrieblicher SichtSchubert, Peter / Voringer, Jürgen / Hofmann, Bernd et al. | 2014
- 511
-
The determination of performance- and payment-relevant parameters in TBM tunnelling – State of the technology and outlookGaller, Robert / Handke, Dieter / Nolden, Mario et al. | 2014
- 511
-
The determination of performance‐ and payment‐relevant parameters in TBM tunnelling – State of the technology and outlook / Ermittlung leistungs‐ und vergütungsrelevanter Parameter für TVM‐Vortriebe – Stand der Technik und AusblickGaller, Robert / Handke, Dieter / Nolden, Mario et al. | 2014
- 520
-
TBM-specific testing scheme to assess the clogging tendency of rockThewes, Markus / Hollmann, Fritz et al. | 2014
- 520
-
TBM‐specific testing scheme to assess the clogging tendency of rock / TBM‐spezifisches Untersuchungsschema zur Beurteilung der Verklebungsneigung von FelsThewes, Markus / Hollmann, Fritz et al. | 2014
- 528
-
Drilling processes to explore the rock mass and groundwater conditions in correlation with TBM-tunnellingKogler, Kurt / Krenn, Harald et al. | 2014
- 528
-
Drilling processes to explore the rock mass and groundwater conditions in correlation with TBM‐tunnelling / Bohrtechnische Verfahren zur Erkundung der Gebirgs‐ und Bergwasserverhältnisse im Zusammenhang mit TVM‐VortriebenKogler, Kurt / Krenn, Harald et al. | 2014
- 540
-
Consistent exploration by probe drilling and TSWD through the example of the Koralm TunnelRadinger, Alexander / Fasching, Florian / Pack, Gudrun / Kreutzer, Ingrid / Kostial, Dieter et al. | 2014
- 540
-
Consistent exploration by probe drilling and TSWD through the example of the Koralm Tunnel / Konsequente Vorauserkundung mittels Bohrungen und TSWD am Beispiel des KoralmtunnelsRadinger, Alexander / Fasching, Florian / Pack, Gudrun / Kreutzer, Ingrid / Kostial, Dieter et al. | 2014
- 551
-
Advance probing measures on the TBM drives of the south contracts of the Gotthard Base Tunnel – experience and implications for other projects / Vorauserkundungsmaßnahmen bei den TBM‐Vortrieben der Südlose des Gotthard‐Basistunnels – Erfahrungen und Folgerungen für andere ProjekteRehbock‐Sander, Michael / Wieland, Gerd / Jesel, Thomas et al. | 2014
- 551
-
Advance probing measures on the TBM drives of the south contracts of the Gotthard Base Tunnel – experience and implications for other projectsRehbock-Sander, Michael / Wieland, Gerd / Jesel, Thomas et al. | 2014
- 565
-
Determination of the system behaviour based on data analysis of a hard rock shield TBM / Analyse der Maschinenparameter zur Erfassung des Systemverhaltens beim Hartgesteins‐SchildvortriebRadoncic, Nedim / Hein, Mario / Moritz, Bernd et al. | 2014
- 565
-
Determination of the system behaviour based on data analysis of a hard rock shield TBMRadoncic, Nedim / Hein, Mario / Moritz, Bernd et al. | 2014
- 577
-
Sustainability in infrastructure construction – on the transferability of assessment concepts for buildings to civil engineering worksMaydl, Peter et al. | 2014
- 577
-
Sustainability in infrastructure construction – on the transferability of assessment concepts for buildings to civil engineering works / Nachhaltigkeit im Infrastrukturbau – Zur Übertragbarkeit von Bewertungskonzepten für Gebäude auf den TiefbauMaydl, Peter et al. | 2014
- 593
-
The lifecycle cost concept for implementation of economic sustainability in tunnel construction / Das Lebenszykluskostenkonzept zur Umsetzung der ökonomischen Nachhaltigkeit von TunnelbauwerkenEngelhardt, Stephan / Schwarz, Jürgen / Thewes, Markus et al. | 2014
- 593
-
The lifecycle cost concept for implementation of economic sustainability in tunnel constructionEngelhardt, Stephan / Schwarz, Jürgen / Thewes, Markus et al. | 2014
- 601
-
Planning optimisation for the Brenner Base Tunnel considering both maintenance and sustainabilityEckbauer, Walter / Insam, Romed / Zierl, Dietmar et al. | 2014
- 601
-
Planning optimisation for the Brenner Base Tunnel considering both maintenance and sustainability / Planungsoptimierungen beim Brenner‐Basistunnel aus Sicht der Instandhaltung und NachhaltigkeitEckbauer, Walter / Insam, Romed / Zierl, Dietmar et al. | 2014
- 610
-
Furnishing for long railway tunnels – interplay between construction and maintenance costs (example Koralm Tunnel)Steiner, Helmut / Rodler, Johann et al. | 2014
- 610
-
Furnishing for long railway tunnels – interplay between construction and maintenance costs (example Koralm Tunnel) / Ausstattung langer Bahntunnel im Spannungsfeld zwischen Errichtungs‐ und Erhaltungskosten am Beispiel des KoralmtunnelsSteiner, Helmut / Rodler, Johann et al. | 2014
- 619
-
Refurbishment of tunnels on the autobahn and main road network – Experience and requirements in the view of the road operatorRattei, Günter / Lorber, Wilhelm et al. | 2014
- 619
-
Refurbishment of tunnels on the autobahn and main road network – Experience and requirements in the view of the road operator / Sanierung von Tunnelanlagen des Autobahnen‐ und Schnellstraßennetzes – Erfahrungen und Anforderungen aus der Sicht des StraßenbetreibersRattei, Günter / Lorber, Wilhelm et al. | 2014
- 626
-
Maintenance‐optimised drainage system for the New Semmering Base tunnel and Pummersdorf Tunnel / Instandhaltungsoptimiertes Entwässerungssystem für den Semmering‐Basistunnel neu und Tunnel PummersdorfWagner, Oliver K. / Koch, Daniel / Lemmerer, Johann / Druckfeuchter, Hubert / Petraschek, Thomas et al. | 2014
- 636
-
Product informations: Geomechanics and Tunnelling 5/2014| 2014
- 638
-
Diary of Events: Geomechanics and Tunnelling 5/2014| 2014
- 639
-
Imprint: Geomechanics and Tunnelling 5/2014| 2014
- 640
-
Preview: Geomechanics and Tunnelling 6/2014| 2014
-
Cover Picture: Geomechanics and Tunnelling 5/2014| 2014