Execution of tunnel construction projects – analysis of the current situationAbwicklung von Tunnelbauvorhaben – Analyse der Ist‐Situation (German)
- New search for: Hödl, Reinhold
- New search for: Bach, Dietmar
- New search for: Lehner, Wolfgang
- New search for: Hödl, Reinhold
- New search for: Bach, Dietmar
- New search for: Lehner, Wolfgang
In:
Geomechanics and Tunnelling
;
14
, 6
;
771-780
;
2021
- Article (Journal) / Electronic Resource
-
Title:Execution of tunnel construction projects – analysis of the current situationAbwicklung von Tunnelbauvorhaben – Analyse der Ist‐Situation
-
Contributors:
-
Published in:Geomechanics and Tunnelling ; 14, 6 ; 771-780
-
Publisher:
- New search for: Ernst & Sohn
-
Publication date:2021-12-01
-
Size:10 pages
-
ISSN:
-
DOI:
-
Type of media:Article (Journal)
-
Type of material:Electronic Resource
-
Language:German
-
Keywords:
-
Source:
Table of contents – Volume 14, Issue 6
The tables of contents are generated automatically and are based on the data records of the individual contributions available in the index of the TIB portal. The display of the Tables of Contents may therefore be incomplete.
- 678
-
Austrian Tunnel DayÖsterreichischer TunneltagGaller, Robert et al. | 2021
- 679
-
News: Geomechanics and Tunnelling 6/2021| 2021
- 697
-
The Stockholm bypass projectFörbifart, Bypass StockholmGasser, Oliver / Haidenthaller, Christoph / Magnusson, Robert / Laubreiter, Felix et al. | 2021
- 708
-
Swinoujscie Tunnel – Using a slurry shield under the Baltic SeaTunnel Swinemünde – Hydroschildeinsatz unter der OstseeGöbl, Arthur et al. | 2021
- 718
-
Site optimization of the ÖBB power plant Spullersee – Building between a natural gem and alpine extremesStandortoptimierung ÖBB Kraftwerk Spullersee – Bauen zwischen Naturjuwel und alpinen ExtremenSinkovec, Christoph / Wippersberger, Markus / Tschofen, Josef et al. | 2021
- 730
-
Revision of the Austrian standard ÖNorm B 2203‐2 for work contracts in continuous drivesÜberarbeitung der österreichischen Werkvertragsnorm ÖNorm B 2203‐2 für den kontinuierlichen VortriebHolzer, Wolfgang / Wagner, Oliver Kai / Leitner, Wolfgang et al. | 2021
- 740
-
RVS 09.01.53 Quartz, asbestos, chromium VI – Handling the unavoidable in a tunnel – a guidelineRVS 09.01.53 Quarz, Asbest, Chrom VI – Zum Umgang mit dem Unvermeidbaren im Tunnel – ein LeitfadenLauffer‐Neumann, Dagmar et al. | 2021
- 755
-
The tunnel construction contract – A reviewDer Tunnelbauvertrag – Eine BestandsaufnahmeKarasek, Georg et al. | 2021
- 762
-
Measuring cooperation – The COOP‐Quickcheck of the Austrian Construction Technology Association (ÖBV)1 *Messen von Kooperation – Der KOOP‐Quickcheck der Österreichischen BautechnikvereinigungMüllneritsch, Brigitte / Wiesner, Wolfgang et al. | 2021
- 771
-
Execution of tunnel construction projects – analysis of the current situationAbwicklung von Tunnelbauvorhaben – Analyse der Ist‐SituationHödl, Reinhold / Bach, Dietmar / Lehner, Wolfgang et al. | 2021
- 782
-
Alliance Contracts – Without litigation through the crisisAllianzverträge – Ohne Rechtsstreit durch die KriseDeutschmann, Daniel et al. | 2021
- 794
-
The Emerald Book – a milestone on the road to the futureDas Emerald‐Book – Ein Meilenstein auf dem Weg in die ZukunftErtl, Hannes / Hechenblaickner, Kurt et al. | 2021
- 801
-
Site Reports: Geomechanics and Tunneling 6/2021| 2021
- 803
-
Product Informations: Geomechanics and Tunnelling 6/2021| 2021
- 808
-
Diary of Events: Geomechanics and Tunnelling 6/2021| 2021
- 811
-
Imprint: Geomechanics and Tunneling 6/2021| 2021
- 812
-
Preview: Geomechanics and Tunneling 1/2022| 2021
-
Content: Geomechanics and Tunnelling 6/2021| 2021
-
Cover Picture: Geomechanics and Tunnelling 6/2021| 2021